South Wales Main Line


The South Wales Main Line, originally known as the London, Bristol and South Wales Direct Railway or simply as the Bristol and South Wales Direct Railway, is a branch of the Great Western Main Line in Great Britain. It diverges from the core London-Bristol line at Royal Wootton Bassett near Swindon, first calling at Bristol Parkway, after which the line continues through the Severn Tunnel into South Wales.
Great Western Railway operates High Speed Trains between London and South Wales and services between Cardiff and South West England. CrossCountry provides services from Cardiff to Nottingham via Severn Tunnel Junction and thence the Gloucester to Newport Line via Gloucester and Birmingham. Transport for Wales operates services between South Wales, and North Wales and the Midlands on the line.
The line between Wootton Bassett and Cardiff Central is electrified using the 25 kV AC overhead system.

History

The original route of the Great Western Railway between London and South Wales, after the opening of Brunel's Chepstow Railway Bridge in 1852, left the Bristol-bound Great Western Main Line at Swindon, proceeding via Stroud, Gloucester and Chepstow before rejoining the line as we know it today at Severn Tunnel Junction. This gave rise to the nickname 'Great Way Round'.
In 1886, the opening of the Severn Tunnel brought the opportunity of a more direct route to South Wales, and trains from Swindon to Newport and beyond were routed via Bristol and the Severn Tunnel. This route leaves the one we know today at Royal Wootton Bassett near Swindon rejoining it close to Patchway station.
The route used today was established in 1903 with the building of what is often known as the Badminton Line. This involved the construction of about of new track including two tunnels at Alderton and Sodbury between Royal Wootton Bassett and Patchway. Not only did this provide a more direct route for traffic to and from South Wales, the gradient was easier for coal trains to negotiate, and it was thought that the line would be a boost to what was, at the time of building, the expanding port of Fishguard. This was the GWR's connection with trans-Atlantic ocean liner departures.

Infrastructure

There are four tracks from Severn Tunnel Junction through Newport to Cardiff Central, with two tracks on the remaining sections. Multiple-aspect signals are controlled from several power signal boxes including Swindon, Bristol and two in Cardiff. Over the August Bank Holiday weekend 2016 control of the signals between Westerleigh Junction and Pilning was switched over to the Thames Valley Signalling Centre. These signals now carry the prefix 'BL'.
The maximum line speed from London to Coalpit Heath is ; from Coalpit Heath to Newport; from Newport to east of Bridgend; from east of Bridgend to Swansea Loop North junction ; and from Swansea Loop North Junction to Swansea.

Associated routes

A diversionary route exists if the Severn Tunnel is closed. This takes trains from Severn Tunnel Junction to Gloucester, from where they can rejoin the main line either by the Golden Valley Line to Swindon, or the Cross-Country Route and reverse at Bristol Parkway.
If the line is closed between and, an alternative route exists along the Vale of Glamorgan Line.
Half of peak High Speed Trains and most off peak trains continue from Cardiff Central to Swansea, with a few continuing to or in summer,.
The local service between Swansea and Cardiff is branded Swanline. The urban network within and surrounding Cardiff, including the Maesteg Line, is referred to as Valley Lines.

Plans

Traffic levels on the Great Western Main Line are rising faster than the national average, with continued increases predicted. The now defunct Strategic Rail Authority produced a Route Utilisation Strategy for the Great Western Main Line in 2005 to propose ways of meeting this demand, Network Rail plan to implement a new study in 2008. In the meantime, their 2007 Business Plan includes the provision of extra platform capacity at, Newport and, also resignalling and line speed improvements in South Wales, most of which would be delivered in 2010–2014.
Reading railway station underwent a major redevelopment being reopened in July 2014 and there is a proposed future link to Heathrow Airport directly from Reading under the Heathrow Airtrack scheme.

Electrification

The South Wales Main Line was one of the last of the major inter-city routes in Great Britain to remain un-electrified. The government announced in 2012 a scheme to electrify the South Wales Main Line as part of a wider scheme of electrification on the Great Western Main Line. The line from London to Cardiff was fully electrified by Christmas 2019.
The new Hitachi Super Express trains planned for the Great Western inter-city services will now be predominantly electric units instead of the planned diesel units. However, a proportion of the fleet will be using dual power source electro-diesel bi-mode trains, which will enable services to operate before line electrification is complete. The bi-mode trains will allow inter-city services to operate from London all the way to Carmarthen in the future. The new Super Express trains will bring about an estimated 15% increased capacity during the morning peak hours. Electrification has cut journey times between Swansea and London by an estimated 20 minutes, although electrification will not extend west of Cardiff to Swansea, Carmarthen or Pembroke Dock, and services on the line to Brighton, Portsmouth Harbour and Taunton will continue to be operated by diesel trains, as the Bristol to Exeter Line and the Wessex Main Line will not be electrified.

Communities served

;Towns and cities served by trains from London:
;Settlements served by local trains only: