Bristol Parkway railway station
Bristol Parkway railway station, on the South Wales Main Line, is in the Stoke Gifford area in the northern suburbs of the Bristol conurbation. It is from London Paddington. The station was opened in 1972 by British Rail, and was the first in a new generation of park and ride stations. It is the third-most heavily used station in the West of England, after and. There are four platforms, and a well-equipped waiting area. The station is managed by Great Western Railway, who provide most of the trains at the station, with CrossCountry providing the rest.
Electrification using the 25 kV AC overhead system reached Bristol Parkway in late 2018, and electric trains in the Swindon and London direction commenced passenger service on 30 December 2018. This is part of the planned modernisation of the Great Western Main Line.
Description
Bristol Parkway is located in the unitary authority of South Gloucestershire, in the Stoke Gifford area of the Bristol conurbation. The immediate surrounding area is mostly residential, with farmland to the south east. The main road access is from the west, with the station situated close to the M4, M5 and M32 motorways, the latter being the Bristol "Parkway" from which the station takes its name, as well as the A4174 Avon Ring Road. The station is on the South Wales Main Line from London to Swansea, from the eastern terminus at London Paddington. It is also on the Cross Country Route from to. Just to the west of the station is Stoke Gifford Junction, where the Henbury Loop Line to Avonmouth Docks and Cross Country Route to Bristol Temple Meads diverge from the line to South Wales. Stoke Gifford train maintenance depot is located within the junction's confines. To the east is a Network Rail maintenance training centre. The next station north along the Cross Country Route is, the next station south is. The next station east along the South Wales Main Line is, the next station west is, however there are only two trains per day calling at both Bristol Parkway and Patchway.The station is on an east/west alignment, with the main station building and car park to the north of the line. There are six lines through the station, of which the inner four have platforms, the outer two being goods loops. There is a goods yard adjacent to the station to the south. The station has four platforms, numbered 1 to 4 from south to north. Platforms 1 and 2 share an island to the south of the two central lines, platform 1 is on the south side of the island and serves southbound trains towards Bristol Temple Meads, platform 2 is on the north side of the island and serves westbound trains towards Wales and Bristol Temple Meads. Platforms 3 and 4 share an island to the north of the two central running lines. Platform 3 serves mainly inter-city trains towards London and, while platform 4 is usually reserved for local services. An enclosed footbridge provides access to the platforms, approximately a third of the way along platforms 2 and 3, and at the west end of platforms 1 and 4. Platforms 2 and 3 are opposite each other, while platforms 1 and 4 are offset from platform 3, starting at the footbridge and extending further to the east. All platforms are long. Platforms 1, 3 and 4 are signalled for bidirectional running, while platform 2 is unidirectional. The footbridge can be accessed by both stairs and lifts.
The station building, a sweeping metal construction opened in 2001, contains a booking office, waiting rooms, payphones, cash machines, shops, toilets and a café overlooking the tracks. There are waiting rooms on each platform, as well as vending machines and LED displays giving next train information. Ticket barriers are in use at the station. The pay-and-display car park, run by APCOA, has 1,810 spaces.
Bristol Parkway was the first of a new generation of park and ride railway stations, and a large number of passengers use it for that purpose. Over the decade 2002–2012, the number of passengers starting or ending a journey at Bristol Parkway grew by 1 million passengers per year to 2.25 million, with a further 740,000 passengers changing trains there, giving an annual footfall of just under 3 million passengers and making it the 216th busiest station in the country and the third busiest in the West of England . In the 2006/07 financial year, over 100,000 passengers used Parkway to travel to or from Bristol Temple Meads, and a further 500,000 used it to travel to or from London Paddington.
The line through Bristol Parkway has a linespeed of on platforms 2 and 3, and on platform 4. The loading gauge is W8, and the line handles over 20 million train tonnes per year. The lines through the station were electrified in late 2018 as part of the 21st-century modernisation of the Great Western Main Line.
Services
Rail
The station is managed by Great Western Railway, who operate most rail services from the station., the basic Great Western Railway weekday service consists of two trains per hour each way between and , one terminating service to and from, and one service each way between and via .CrossCountry also operate trains from Bristol Parkway, the basic weekday service consists of one hourly train each way between Bristol Temple Meads and, and one hourly train each way between, Bristol and Edinburgh Waverley via and Newcastle. Both these services run via.
Great Western Railway services between London and Wales are formed of High Speed Train sets or bi-mode multiple units, while other GWR services are formed using,, and diesel multiple-unit trains. CrossCountry services are usually formed of and Voyager diesel-electric multiple units, with some services between Scotland and the South West employing HST sets.
The standard journey time to London Paddington is 90 minutes, to Cardiff Central 40 minutes, to Birmingham New Street 75 minutes, and to Bristol Temple Meads 12 minutes.
Bus
Bristol Parkway is served by several bus routes linking it with the rest of Bristol and South Gloucestershire. These include- 3B
- 18
- 19
- 73
- 77
- Y6
- 625
History
The line through Bristol Parkway was originally opened in 1903 as part of the Great Western Railway's "Badminton Line" from Wootton Bassett to, a short-cut for trains from London to South Wales, avoiding Bath and. The station was built on the site of the Stoke Gifford marshalling yard, which closed on 4 October 1971, having become surplus to requirements with the cessation of wagonload freight trains. The station's development was seen as a response to the potential growth of housing and commercial developments in north Bristol, with proximity to the M4 and M5 motorway interchange at Almondsbury also important. The name "Parkway" came from proximity to the M32 motorway, known as the Bristol Parkway, although the term Parkway has since been applied to park and ride stations throughout the United Kingdom. When the station was built it was outside the developed urban area, but the growth of housing and commercial development in adjoining areas of the North Fringe has brought it within the conurbation, with many large office complexes opened nearby.The station, owned by British Rail, opened on 1 May 1972. Services were operated by the Western Region until British Rail was split into business-led sectors in the 1980s, after which Parkway was served by the InterCity and Regional Railways divisions. The original structures, built by Stone & Co. of Bristol, were basic – two island platforms connected by an open metal footbridge, with a wood and brick building containing the booking facilities and waiting rooms. Platform 1, on the north side of the tracks, was for trains towards London and Birmingham, and platform 2 was for trains towards Wales and Bristol Temple Meads. The platforms were long. The station opened with a 600-space car park and a fastest journey to London of 95 minutes, which was subsequently reduced to 75 minutes with the introduction of the new High Speed Trains in 1976. Platform canopies were added in 1973, along with a cover for the footbridge. Further minor improvements were implemented over the next thirty years, including a new booking office and extensions to the car park.
Following the privatisation of British Rail in 1997, services at Bristol Parkway were franchised to several different train operating companies. South Wales Main Line services were provided by Great Western Trains, which was later rebranded as First Great Western; services from Bristol to Birmingham and the north were operated by Virgin CrossCountry; and local services were franchised to Wales & West, which was in turn succeeded in 2001 by Wessex Trains. The Wessex franchise was amalgamated with the Great Western franchise into the Greater Western franchise from 2006, and awarded to First Great Western, which became known as Great Western Railway in 2016. Virgin CrossCountry services were taken over by Arriva CrossCountry in 2007.
In the August 1998, the Royal Mail began construction of the a mail terminal to the east of the station, taking over some of the station car park to provide a platform and warehouse for postal trains. The building opened on 15 May 2000 replacing a similar facility at Bristol Temple Meads, with the Royal Mail stating it would save of lorry journeys per year on local roads. However, the depot closed only four years later in 2004, when the Royal Mail ceased to use the rail network. Royal Mail offered the terminal for use by freight companies, but as there were no takers it was demolished in October 2007. In 2008, Network Rail opened a maintenance training centre on the site in a £2.5 million project which saw the construction of a mezzanine floor, a welding workshop and a extension.
In 2000, work began on a complete redevelopment of the station building with a new enclosed footbridge. It opened on 1 July 2001, and featured lifts and generally enhanced facilities. Local roads were enhanced to help speed passengers' journeys to and from the station, and a new multi-storey car park was built to replace the spaces lost to the Royal Mail facility. A dedicated bus interchange was opened in 2003. In 2006, construction started on a new long platform face on the north side of platform 1, to ease congestion for trains toward Birmingham and London. The new platform, platform 4, was opened on 9 May 2007 by rail minister Tom Harris MP. As part of the reconstruction, the waiting room at the east end of platform 1 was demolished, and replaced with an extended waiting area and customer help desk. Platform 1 was subsequently redesignated platform 3. The work cost £3,000,000, and was funded by Network Rail, with First Great Western contributing £100,000 towards the new waiting room and help desk.
Despite the large car park, the increase in passenger numbers at Parkway in recent years has led to problems with on-street parking, leading to the commissioning of a new 200-space car park east of the station. It opened in Spring 2011, but was used by only 139 motorists in its first three months, and as of August 2012 was averaging only 10 motorists per day. It was expected that traffic would increase when a new bus link was opened to transfer drivers from the car park to the station. A new multi-storey car park on the station site with 710 spaces was opened on 5 September 2014 by Baroness Kramer, Minister of State for Transport. Construction of the car park, which began in mid-2013, caused a short-term lack of spaces for commuters. The car park cost £13 million and was funded jointly by Network Rail and the Department for Transport under the Station Commercial Projects Fund. Improved cycle facilities, including a bike hire scheme, were provided in the late 2000s.
The station was closed for two weeks in September 2017 to allow for upgrade work as part of the electrification and upgrade work for the Great Western route. Works included resignalling, installation of overhead electrification gantries, and the start of construction of a new fourth platform on the south side of platform 2. The new platform 1 took over an existing goods loop, allowing trains towards Bristol and towards Wales to be accommodated at the same time, thus easing a bottleneck. It was opened on 13 April 2018 by Chris Grayling MP, Secretary of State for Transport. The other platforms were lengthened to at the same time. The station closed for three weeks in Autumn 2018 for further electrification works, including the installation and testing of overhead wires.
Future
First Great Western declined a contractual option to continue the Greater Western passenger franchise beyond 2013, citing a desire for a longer-term contract due to the impending upgrade to the Great Western Main Line. The franchise was put out to tender, but the process was halted and later scrapped due to the fallout from the collapse of the InterCity West Coast franchise competition. A two-year franchise extension until September 2015 was agreed in October 2013, and subsequently extended until March 2019. The CrossCountry franchise is due to expire in October 2019.The South Wales Main Line from London to Cardiff is currently undergoing electrification works. However, the lines to Weston-super-Mare and Birmingham will not be electrified, so local and CrossCountry services will still be provided by diesel trains, with "Sprinter" units on local services to be replaced by and "Turbo" units. The group Friends of Suburban Bristol Railways supports the electrification continuing to Weston, as does MP for Weston-super-Mare John Penrose.
Bristol Parkway is on the Weston-super-Mare/ corridor, one of the main axes of the Greater Bristol Metro, a rail transport plan which aims to enhance transport capacity in the Bristol area. The scheme could see the reopening of the Henbury Loop Line to passengers, with the possibility of services from Bristol Temple Meads to Bristol Parkway via and.
Metrobus route M3 is scheduled to terminate at the station, however access roads will need to be redesigned as they are currently too narrow for the buses to allow it to be extended from Emersons Green. Work to rectify this is expected to be completed in 2019, however there is no set date for when services will start.