The M5 is a motorway in the UK linking the Midlands with South West England. It runs from junction 8 of the M6 at West Bromwich near Birmingham to Exeter in Devon. Heading southwest, the M5 runs east of West Bromwich and west of Birmingham through Sandwell Valley. It continues past Bromsgrove, Droitwich Spa, Worcester, Tewkesbury, Cheltenham, Gloucester, Bristol, Weston-super-Mare, Bridgwater, Taunton, terminating at junction 31 for Exeter. Congestion on the section south of the M4 is common during the summer holidays, on Friday afternoons and bank holidays.
Route
The M5 quite closely follows the route of the A38 road. The two deviate slightly around Bristol and the area south of Bristol from junctions 16 to the Sedgemoor services north of junction 22. The A38 goes straight through the centre of Bristol and passes by Bristol Airport, while the M5 skirts both, with access to the airport from junctions 18, 19 or 22. The A38 continues south into Devon from junction 31, near Exminster. Between junction 21, Weston-super-Mare and junction 22, Burnham-on-Sea, the M5 passes by an isolated landmark hill called Brent Knoll. The Willow Man sculpture is visible from both carriageways, and acts as a landmark just to the south of junction 23.Junction 15 of the M5 is a large four-level stack interchange, named the Almondsbury Interchange, where the M5 meets the busy M4. The Avonmouth Bridge, between junctions 18 and 19, is often a bottleneck during heavy traffic periods, due mainly to lane drops at either ends of the bridge for the respective junctions, and the sharp angle in the centre of the bridge, which causes larger vehicles to slow considerably. There are split-level carriageways where the M5 ascends the hillsides above the Gordano Valley, between Portishead, junction 19 and Clevedon, junction 20.
History
Construction
The first of the M5 motorway was constructed as a dual two-lane motorway with Worcestershire County Council acting as engineer. This sectionfrom junction 4 in the north to a trumpet junction with the M50 in the southopened in July 1962. This original section of the M5, from junctions 4 to 8, was widened to provide six lanes in the early 1990s. During this work, the northbound Strensham services were rebuilt further away from a new junction.Worcestershire County Council, the Police and particularly the County Surveyor of Worcestershire made repeated representations that a dual 3-lane standard motorway was appropriate. The Ministry of Transport insisted that a dual 2-lane motorway would be built at a cost of around £8 million. The Motorways archive also records that the carriageways were also built to a lower overall width of 88 feet rather than 100 to reduce the loss of agricultural land. When the decision became necessary to widen the Worcestershire section of M5, it cost £123 million.
The dual two-lane section between Junctions 16 and 17 built at Filton, near Bristol, was also opened in 1962, and was intended to replace the pre-war Filton bypass. Gloucestershire County Council acted as engineer for this section, which was widened to a dual three-lane motorway in 1969.
North of Junction 4 the M5 was constructed in sections, from 1967 to 1970, together with the Frankley services. Much of the northern section beyond Junction 3, from about Oldbury to the junction with the M6 motorway, was constructed as an elevated dual 3-lane motorway over Birmingham Canal, Birmingham Canal, and Titford Pool using concrete pillars.
The M5 was also extended southwards, in sections, from 1967 to 1977, through Gloucestershire & Somerset, to Exeter in Devon as a dual three-lane motorway, together with the Strensham services.
The short section between Junctions 27 and 29 was built between 1967 and 1969, by Devon County Council, as the A38 Cullompton Bypass, with the intention that it should become part of the M5. The termini for this section have since been removed, although part of the southern terminal roundabout is now used as an emergency access. The section was developed to motorway standards, and incorporated into the M5 in 1975.
Operational history
Junction 1 surrounds a surviving gatehouse from the former Sandwell Hall. The section from Junctions 16 and 18 was illuminated in about 1973 as part or a wider policy announced by UK Minister for Transport Industries in 1972 to illuminate the 86 miles of UK motorway particularly prone to fog.In the late 1980s Junction 4a was built as part of the M42 motorway construction project. The route of the M42 was decided as early as 1972 but, owing to planning delays, the short section of the M42 north of Bromsgrove did not open until December 1989.
As the M5 traffic increased in the 1980s Junction 11, the main Gloucester & Cheltenham access became increasingly congested. At the same time there were plans for large scale business & housing developments at Brockworth, near Gloucester. To relieve Junction 11 of some of the new traffic generated, & avoid more congestion around both Cheltenham & Gloucester, a new junction, Junction 11A, some 3.5 miles south of Junction 11, was constructed & opened in the mid-1990s.
The Avonmouth Bridge was converted to eight lanes in the early 2000s. Later, in 2005–2006, parts of the M5 between Junctions 17 and 20 were widened to 7 lanes ; variable message signs were added and parts of the central reservation was converted to a concrete step barrier. During this stage of construction the M5 became Britain's longest contraflow system,
spanning between Junctions 19 and 20. The M5 contraflow was said to be the most complicated ever built in the UK as the motorway is on a split level around the steep hills of the Gordano Valley; meaning four lanes plus an additional emergency vehicle lane were squeezed into that section.
In 2002, extended exits for Junction 12 were constructed. The Highways Agency did not anticipate the traffic flows through the junction and the resultant queues can now extend back onto the motorway. This is because of an increase in traffic from Stroud intending to use the M5 northbound. The distance from Junctions 12 and 13 is similar and traffic congestion is heavy on the A419 towards Junction 13 whereas it is usually lighter on the B4008 towards Junction 12. As traffic leaving the M5 northbound towards Gloucester needs to give way to this traffic coming from the B4008, the queue on the motorway can extend beyond the first sign for the junction.
The Cullompton services are signed on the motorway in the northbound direction only. This was implemented to reduce congestion at the low capacity junction, although there is still access available to the services southbound through the junction. Also, the northbound exit slip to the junction was reduced to one lane instead of two to reduce traffic on the small roundabout at the west side of the junction.
In 2009, it was announced that the lighting between junctions 30 and 31 would be turned off between midnight and 5.00am to save energy.
Proposals were announced in September 2009 for a new Gloucester Services between junctions 11a and 12. A planning application was submitted in December 2009. Stroud District councillors approved the services in August 2010. The Services opened in May 2014
Future developments
There have been suggestions that the Government extend the M5 south, to the city of Plymouth, which currently relies on the A38 road. The argument for such an extension has intensified in light of the closure of Plymouth City Airport in 2011, and the 2014 breaching of the South Devon Railway sea wall following storms that in turn, cut off Plymouth and Cornwall's rail access.Improvements to junction 25 at Taunton were approved with an £18 million programme that will include the enlargement of the junction roundabout, the widening of the eastern junction slip road exit, and an additional roundabout southeast of the junction to provide access to a new business park and to a proposed bypass of the hamlet of Henlade.