Chiltern Main Line


The Chiltern Main Line is an inter-urban, regional and commuter railway, part of the British railway system. It links London and Birmingham, the United Kingdom's two largest cities, by a route via High Wycombe, Banbury, and Leamington Spa.
It is one of two main line railway routes between London and Birmingham, the other being the West Coast Main Line between London Euston and, which is the principal InterCity route between the two cities.
The name Chiltern Line was invented as a marketing name for the line by Network SouthEast in 1985, in reference to the Chiltern Hills which the route passes through near its southern end. The route was originally part of the Great Western Railway's main line from London Paddington to Birmingham Snow Hill, and. Most main line services between London and Birmingham on this route were discontinued in 1967 after the West Coast Main Line was electrified, and Snow Hill station was closed. Services were resumed between London and the reopened Snow Hill in 1993, however they were routed into Marylebone, formerly the London terminus of the now-closed Great Central Main Line, instead of the historic terminus at Paddington.
Since the privatisation of British Rail in the 1990s, the main operator has been Chiltern Railways who have continued to develop the route and services. The line has [|undergone a major upgrade] which has seen much of the line cleared for 100 mph running, resulting in significant reductions in journey times from 2013. The line is not electrified, although electrification is an aspiration.
The line forms part of the suburban rail networks in both cities. The majority of towns towards the London end of the route are prosperous suburbs or commuter-belt towns, such as Ruislip, Gerrards Cross and Beaconsfield. These have a journey time of 30 minutes or less to London Marylebone. In the West Midlands it is one of the Snow Hill Lines. Commuter trains operated by West Midlands Trains run between Birmingham Snow Hill, and, also to Stratford-upon-Avon.

Map

History

Early history

The original Great Western Railway line from to Birmingham was completed in 1852; in 1854 it was extended to Wolverhampton. It ran via the Great Western Main Line to and then via and. Being circuitous, it could not compete with the London and North Western Railway's London-Rugby-Birmingham route on journey times.
The only open segments of the Chiltern Main Line were the Aynho–Banbury–Leamington–Birmingham route and the single-track Wycombe Railway between Princes Risborough and High Wycombe; the latter continued south via Bourne End to Maidenhead on the Great Western Main Line.

GW/GC Joint Line

In an attempt to compete with the LNWR's London–Birmingham route and speed up goods traffic between London and the west-coast port at Birkenhead, the GWR took advantage of its partnership with the Great Central Railway to build a new, direct Great Western and Great Central Joint Railway. This enabled the GCR to run faster services than had been possible on the Metropolitan Railway route through Aylesbury and Amersham, which was congested with stopping trains.
The Joint line started at Northolt Junction in Middlesex, from which two lines ran southward:
The Joint line ran northwest via Gerrards Cross to High Wycombe, where it met the Wycombe Railway's single-track branch from Maidenhead to Aylesbury via Princes Risborough. North of High Wycombe this line was followed, with significant upgrading of the formation, including dualling and a new alignment for the up line north of Saunderton. The original route, now the down line, has a gradient of 1 in 88, which was too steep for the heavy coal trains run by the GCR. As a result, the two tracks are horizontally and vertically separated, with the down line crossing the Chiltern Hills at the Risborough gap and the up line passing through an tunnel on a flatter gradient.
On reaching Princes Risborough, new construction started. The station was already a major junction, with the single-track line dividing into three branches: to Chinnor and Watlington ; to Thame, Wheatley and Oxford; and to Aylesbury. The joint line was constructed in the 'V' formed by the two latter branches, and ran north west to Ashendon, where the line curved north to join the GCR's pre-1906 main line at Grendon Underwood Junction in Buckinghamshire.
The Joint Line was completed in 1906 by the GWR and immediately benefited both parties. The GCR, unable to secure adequate access to its route via Aylesbury, Amersham and Harrow, gained a new and fast bypass route for its express passenger and freight trains between London and the East Midlands, while the GWR gained a faster route for its Birmingham trains, from Paddington via Gerrards Cross and Princes Risborough and then temporarily on to the Wycombe Railway via Thame to regain their original route at Oxford, pending the opening of the Bicester cut-off to Banbury. GCR expresses non-stop between London and Rugby could now use either the Metropolitan route or the Joint Line, while the Joint Line was used by GWR expresses from Paddington to Birmingham and Wolverhampton and on to Shrewsbury and Mid/North Wales, Chester and Birkenhead.

The Bicester cut-off

Four years later, in 1910, the GWR completed a line from what became Ashendon Junction north west via Bicester to meet the line from Oxford at Aynho Junction. This meant that the Joint Line from Ashendon Junction to Grendon Underwood became GCR-only, and was sold to the GCR. The cut-off gave the GWR a faster route between London and Birmingham, avoiding Oxford; the final saving in distance was about.

Heyday, decline and rationalisation

During the heyday of the route, many prestigious trains ran from Paddington to the northwest of England via the Joint Line, reaching Wolverhampton,,, and. Various through services from Marylebone to the GCR network also ran via the Joint Line between London and Ashendon Junction.
At nationalisation in 1948, the line passed to the Western Region of British Railways, which continued to operate Paddington – Birmingham – Wolverhampton - Birkenhead fast trains through the 1950s in competition with the London Midland Region's from via the West Coast Main Line.
The Paddington – Birmingham – Wolverhampton - Birkenhead fast service was sharply increased in frequency to up to 15 trains a day each way from the 1959–60 timetable to compensate for the withdrawal of most LMR trains during electrification of the WCML. For the same reason, the Chiltern line was used by many trains between Paddington and Birkenhead from 1965.
All local trains were diverted to Marylebone in 1963 and operated by four-car Class 115 DMUs, and the main-line platforms at Greenford on the New North route between Old Oak Common and Northolt Junction were closed.
After the GCR main line was closed between and in September 1966, some trains from the South Coast were diverted north of Banbury via the route. These became the forerunners of today's CrossCountry services between Birmingham and.
On 6 March 1967, after completion of the WCML electrification, express trains from Paddington to Birmingham/Wolverhampton/Birkenhead were discontinued under The Reshaping of British Railways. The route was downgraded to secondary status and subsequently single-tracked between Princes Risborough and Aynho Junction, which remained a flying junction, with a crossing loop at Bicester not normally used. Through lines were removed from most of those stations which had them, such as Denham in 1965, Beaconsfield in 1973 and Gerrards Cross in 1989 and the relief lines were lifted between Lapworth and Tyseley. The tunnel between Birmingham Moor Street and Snow Hill closed on 2 March 1968. Local services from Leamington and Stratford terminated at Moor Street, and the remaining services from Paddington and the South Coast were diverted into New Street. Snow Hill closed completely, along with most of the line to Wolverhampton, on 4 March 1972.
Although a two-hourly locomotive-hauled semi-fast service from Paddington to Birmingham continued via High Wycombe, Princes Risborough, Bicester, Banbury, Leamington and Solihull, in the early 1970s all but one daily peak-hour return journey were diverted via and Oxford, and later via, and in the 1980s that was truncated to run to Banbury only. All other passenger services were operated by DMUs to and from Marylebone, extended from High Wycombe to Banbury, on a two-hourly frequency.
On 24 March 1974 the line from Marylebone to Banbury transferred from the Western Region to the London Midland Region and all stations between South Ruislip and Bicester were also transferred to LMR giving LMR the responsibility of all passenger services out of Marylebone.
In 1977 the Parliamentary Select Committee on Nationalised Industries recommended considering electrification of more of the rail network, and by 1979 BR presented a range of options to electrify numerous routes by 2000. Some of these options included the Banbury – Birmingham section of the line, plus the Cherwell Valley Line and the Coventry to Leamington line. Under the 1979–90 Conservative governments that succeeded the 1976–79 Labour government the proposals were not implemented.
The route was considered for partial closure in the 1980s. All services would have run to Paddington via the New North route, and Marylebone station and all lines leading to it would have been closed. Services to and from Aylesbury would have run via Princes Risborough. However, Marylebone was formally reprieved in 1986 and the closure proposals rescinded.
Between 1988 and 1992 British Rail carried out a total route modernisation which included resignalling from Marylebone to Aynho Junction, and both Marylebone to Aylesbury routes, from the new Marylebone Integrated Control Centre. This was combined with track rationalisation that removed most of the vestigial traces of main-line heritage from the line, downgrading it to a purely commuter line with a minimal infrastructure. Until then, much of the four-track section between Northolt Junction and West Ruislip had survived, and High Wycombe station had retained almost all of its original track layout, though the other major stations on the line had already been downgraded with their through lines removed. At the same time, the New North route between Old Oak Common and Northolt Junction was singled between Old Oak Common and Park Royal and between Greenford and Northolt Junction. In 1992, the signal box at Aynho Junction was closed and replaced with modern signalling controlled from Banbury South signal box; the box was demolished in 2002. As part of these renovations, BR installed the advanced Automatic Train Protection system, mainly as a trial with a view to rolling it out nationwide. However, privatisation intervened, and the Great Western Main Line was the only other line to be so equipped.

Rejuvenation

With Sectorisation of British Rail in the mid-1980s, operations south of Banbury fell under the control of Network SouthEast in 1986, under the Thames & Chiltern sub-sector, later split into two constituent parts. In 1987 a new station was opened at Haddenham & Thame Parkway. Birmingham Snow Hill reopened in 1987 on a much smaller scale than the original, beneath a multi-storey car park, with its tunnel reinstated and new platforms on the through lines at Moor Street, where the terminus was taken out of use, with Leamington/Stratford services diverted to Snow Hill.
The opening of the extension of the parallel M40 motorway from Oxford to Birmingham in 1991 spawned development in towns along the northern section of the route, notably Bicester, Banbury, Leamington Spa and Warwick. This generated additional patronage for train services in the corridor.
Class 165 Turbo trains were introduced in 1991, initially between Marylebone and Banbury. These improved passenger comfort and enabled journey times to be reduced; frequencies were increased, with an hourly stopping service to/from High Wycombe and hourly semi-fast service to/from Banbury. In 1993, Marylebone-Banbury services were extended to Snow Hill, calling at Leamington Spa, Warwick, Solihull and Moor Street, initially on a two-hourly frequency, increased to hourly the following year, when a Dorridge call was added. In 1995 the Jewellery Line was re-opened to allow Worcester line services to be diverted from New Street to Snow Hill; this allowed some of Chiltern's weekday peak-period services to be extended beyond Snow Hill, first to Stourbridge Junction and then to Kidderminster.

Chiltern Railways era

Upon rail privatisation in 1996, the Chiltern Railways franchise was won by M40 Trains, a consortium of a management buyout, Laing Rail, and venture capitalist 3i, and in 1998 the line between Princes Risborough and Bicester North was redoubled by the company. This included the total reconstruction of Haddenham and Thame Parkway at platform level, with two side platforms instead of the single platform constructed in 1987, and a new down platform at Princes Risborough, together with the raising of the speed limit. Also in 1998 the first Class 168 Clubman trains with a maximum speed were introduced to reduce journey times.
In 2000 Chiltern Railways opened a new station at Warwick Parkway, to the west of the town next to the A46 and close to M40 Junction 15. This was intended to be a railhead for nearby towns without a station such as Kenilworth, and for towns south of Birmingham close to the M42 with no direct rail link to London, such as Redditch and Bromsgrove. Construction was funded by Chiltern Railways with some support from Warwickshire County Council. At first only Chiltern services called there but it is now also served by London Midland.
In 2002, after Chiltern won its 20-year franchise, the line between Bicester North and Aynho Junction was also redoubled. Chiltern took over Hatton to Stratford-upon-Avon services from Thames Trains and Central Trains, with direct services between Marylebone and Stratford. Also at this time Chiltern took over the operation of Leamington Spa, Warwick, Hatton and Lapworth stations from Central Trains, as the latter's services no longer operated beyond Dorridge except during weekday peak periods.
John Laing plc acquired 84% ownership of M40 Trains in 1999, buying out 3i, and was itself bought out by Henderson Investments in 2006, resulting in the sale of Laing Rail to the German national railway operator Deutsche Bahn in 2007.
The Cherwell Valley line between Banbury and Leamington Spa was resignalled during 2004, with the closure of Fenny Compton signal box and the removal of its remaining semaphore signals. The new signalling and the existing signalling in the Leamington Spa station area is controlled from the box at Leamington via a new Westcad workstation. More recently the Leamington to Birmingham section has been resignalled and is controlled from the new West Midlands ICC at Saltley with new 4-aspect LED signals throughout. However, the manual signal boxes at Banbury North and South remained, along with some GWR lower-quadrant signals controlling the bay platforms and sidings at the station. In 2016 the station was re-modelled and re-signalled, being incorporated into the West Midlands ICC take over control as Oxford in 2016.
Most of the route from Birmingham Snow Hill to Wolverhampton is now used by the Midland Metro light-rail system, which diverges from Network Rail's Jewellery Line at The Hawthorns.
The route between Marylebone and Leamington/Bordesley was used by open access operator Wrexham & Shropshire's services from London to Wrexham via Tame Bridge, Wolverhampton and Shrewsbury, which comprised three Mk3 coaches hauled by Class 67 diesel locomotives. Since these were neither Sprinters nor HSTs, they were restricted to lower line speeds, e.g. between Princes Risborough and Bicester, and between Leamington and Bordesley, although they were permitted to travel at between Bicester and Aynho. Wrexham & Shropshire had negotiated with Network Rail to allow its trains to travel at higher speeds on these sections, which required it to show that they had sufficient brake force to stop from such speeds within the signal spacings.
Only the little-used line from Northolt Junction to Paddington has not been improved.
In September 2006, Chiltern completed its "Evergreen 2" upgrade project, carried out by Carillion, which realigned the track through Beaconsfield to increase non-stop speeds from, installed additional signals between High Wycombe and Bicester North and between Princes Risborough and Aylesbury, and added two platforms at Marylebone, on the site of the daytime carriage sidings, replaced by the new Wembley Light Maintenance Depot, just south and west of Wembley Stadium station. The new platforms and partial resignalling of the station throat make it possible to run 20 trains per hour in and out of the station.
At weekends during 2008, when major engineering works were taking place on the WCML, the line was used by Virgin Trains' - "Blockade Buster" service via Willesden, Acton Main Line, Ealing Broadway, Greenford, High Wycombe, Banbury and Coventry, using pairs of five-car class 221 sets.

Infrastructure

Tunnels and viaducts

There are several major civil engineering structures along the route of the Chiltern Main Line.
The viaduct crossing the M25 between Denham Golf Club and Gerrard's Cross is especially noted as a local landmark, as for many years it has borne a graffiti slogan, "" painted in large white letters on the south-facing parapet. The graffiti was partially removed in 2018.
Railway StructureLengthELRLocation
Snow Hill TunnelDCLSouth of Snow Hill station
Bordesley ViaductDCLSouth of Moor Street station
Goods Yard Approach & Corporation Yard ViaductsDCLBordesley station
River Avon ViaductDCLBetween Warwick and Leamington Spa stations
Leamington Viaducts / Neilson Street ViaductDCLEast of Leamington Spa station
Harbury TunnelDCLBetween Leamington Spa and Banbury stations
Aynho Flyover NAJ3Between Kings Sutton and Bicester North stations
Souldern No. 2 ViaductNAJ3Between Aynho junction and Bicester North station
Souldern No. 1 ViaductNAJ3Between Aynho junction and Bicester North station
Ardley TunnelNAJ3Between Aynho junction and Bicester North station
Brill TunnelNAJ3Between Bicester North and Haddenham and Thame Parkway stations
River Thame ViaductNAJ2North of Haddenham and Thame Parkway station
Saunderton Tunnel NAJ2South of Princes Risborough station
Hughenden Road ViaductNAJ2North of High Wycombe station
Gordon Road ViaductNAJ2Between High Wycombe and Beaconsfield stations
Sir Philip Rose's ViaductNAJ2Between High Wycombe and Beaconsfield stations
Whitehouse TunnelNAJ2Between High Wycombe and Beaconsfield stations
'Tesco' Covered Way NAJ2South of Gerrards Cross station
Chalfonts No. 2 ViaductNAJ2Between Gerrards Cross and Denham Golf Club stations
Chalfonts No. 1 Viaduct NAJ2Between Gerrards Cross and Denham Golf Club stations
River Colne ViaductNAJ2South of Denham station
Grand Union Canal ViaductNAJ2South of Denham station
South Harrow TunnelNAJ1West of Sudbury Hill Harrow station
Kilburn ViaductMCJ1North of Marylebone station
Hampstead TunnelMCJ1North of Marylebone station
St John's Wood TunnelMCJ1North of Marylebone station

Oxford Connection

A quarter of a mile of double track has been constructed joining the Oxford to Bicester Line at Bicester Village to the Chiltern line, allowing a new Oxford to London Marylebone service to operate, calling at Bicester Village and High Wycombe. The track between Wolvercote Tunnel and Bicester Village has been rebuilt and a new station constructed at Water Eaton, named. The scheme includes additional platforms at Bicester, Islip and Oxford. The Oxford line was re-opened in stages during 2015 and 2016, with services from London Marylebone to Oxford Parkway commencing in October 2015, and services through to Oxford starting on 11 December 2016. The delay to the full service was due to works in the Wolvercote tunnel, which were specifically scheduled to minimise disruption to roosting bats. The upgraded track has two bi-directional tracks and headroom in the tunnel for overhead electrification to be installed at a later date.

Main Line upgrade

The second part of the project upgraded the line to running on more of track, with junctions at Neasden, Northolt and Aynho rebuilt to permit higher speeds. The 'up' through track was restored at Princes Risborough and signalled for bidirectional use, the existing 'up' line becoming a bidirectional platform loop. A new turnback siding was provided at Gerrards Cross and a new 'down' through track built from Northolt Junction to Ruislip Gardens, running alongside the 'up' line to the east of the waste transfer station; the 'down' line will continue to serve South Ruislip. Speed restrictions through Bicester North were raised to permit running, with a new 'up' alignment and platform. Two of the original terminal platforms at Birmingham Moor Street were reopened for Chiltern services in December 2010. Accelerated services started in September 2011, after being postponed due to concerns about whether the works would be completed in time.
Thanks to the speed increases, journey times have been reduced significantly. From Marylebone, the fastest journey time to Birmingham Moor Street is now 94 minutes instead of 117 minutes. The table below outlines the originally proposed peak timetable improvements as indicated by Network Rail. This compares to roughly 85 minutes for the fastest Euston- trains via the West Coast Main Line.
Chiltern Railways chairman Adrian Shooter said, "This is the biggest passenger rail project for several generations not to call on the taxpayer for support. Working closely with Network Rail, we are going to create a new main line railway for the people of Oxfordshire and the Midlands. This deal demonstrates that real improvements to rail services can be paid for without public subsidy by attracting people out of their cars and on to trains."
Network Rail said its investment will be reimbursed by a 'facility charge' over the next 30 years, by Chiltern Railways, whose franchise expires in December 2021, and then by the future franchisee. The infrastructure upgrade was carried out by main contractor BAM Nuttall, in partnership with Jarvis and WS Atkins.
CurrentEvergreen 3
Gerrards Cross2118
High Wycombe3423
Princes Risborough4132
Bicester5644
Banbury6750
Leamington Spa8567
Solihull10784
Birmingham Moor Street11792

Passenger services

Chiltern Railways are the main operators of the route, however parts of the line carry services by other operators: West Midlands Trains operate local services in the West Midlands area between Birmingham, and Leamington Spa as part of the Snow Hill Lines, and CrossCountry operate some services from either Birmingham or Leamington and running as far as Aynho Junction where they diverge towards. Great Western Railway also operate a few services to Banbury via Oxford.

Weekday off-peak service pattern

At May 2011:

Rolling stock

Passenger trains are operated by:

Connections

Connections are available at:
Birmingham New Street, Birmingham's main station, is a 5-minute walk from Moor Street; Baker Street, where several London Underground lines call, is a 5-minute walk from London Marylebone.

Future

Electrification

No section of the line is electrified, but in 2010 the then chairman of Chiltern Railways, Adrian Shooter, indicated that electrification was being considered, though not in the immediate future. He added: "We could do some very interesting things with high-acceleration EMUs and possibly some further infrastructure work".

Other plans

There are several proposals: