Chiltern Railways
Chiltern Railways is a British train operating company owned by Arriva UK Trains that has operated the Chiltern Railways franchise since July 1996. It operates commuter/regional rail passenger services from its central London terminus at London Marylebone along the M40 corridor to destinations in Buckinghamshire, Oxfordshire and Warwickshire, as well as long-distance services to the West Midlands along two routes. Services on the Chiltern Main Line run from London to, and, with some peak-hour services extended to.
Chiltern Railways also runs trains on the London to Aylesbury Line to , and on the Princes Risborough to Aylesbury and Oxford to Bicester branch lines.
History
In June 1996 M40 Trains was awarded the Chiltern Railways franchise by the Director of Passenger Rail Franchising for a period of seven years, with operations commencing on 21 July 1996. M40 Trains was a management buyout led by some former British Rail managers who held a combined 51% shareholding, backed by John Laing and 3i. In a restructure in March 1999, John Laing took an 84% shareholding, with the remaining 16% owned by the former British Rail managers.In March 2000 the Shadow Strategic Rail Authority announced that M40 Trains and Go-Ahead had been shortlisted to bid for the next Chiltern franchise. In August 2000 M40 Trains was awarded a new franchise, to run for 20 years conditional on various investments being made. The new franchise started on 3 March 2002.
In August 2002 John Laing acquired the remaining 16% of shares in M40 Trains it did not already own. In September 2006 John Laing was purchased by Henderson Equity Partners.
In December 2004 Chiltern Railways took over operation of passenger services on the to branch line from First Great Western Link.
In June 2006 M40 Trains was invited by the Department for Transport to lodge a bid to operate the Snow Hill Lines then operated by Central Trains, as part of the letting of the West Midlands franchise. The bid was not successful.
In July 2007 Henderson Equity Partners put Laing Rail up for sale. Arriva and Go-Ahead both expressed an interest in acquiring Laing Rail, but by December 2007 only Deutsche Bahn of Germany and NedRail of the Netherlands remained in the bidding contest. In January 2008 Laing Rail was purchased by Deutsche Bahn, and Chiltern became part of the DB Regio group.
A restructure in early 2011 saw DB Regio become a subsidiary of Arriva UK Trains.
In May 2011 Chiltern took over operating services on the Oxford to Bicester Line from First Great Western.
Gerrards Cross incident
proposed building a supermarket over the railway line near Gerrards Cross railway station in 1996, which, following an initial objection by the local council was approved by the Deputy Prime Minister John Prescott in July 1998. Due to a lack of space in the area, Tesco had proposed building over the railway line, which would free up a large area of land suitable for the development.During construction, the partially built tunnel collapsed on 30 June 2005. Nobody was injured but the line was closed for over six weeks, eventually reopening on 20 August 2005. Compensation by Tesco to Chiltern Railways and Network Rail was estimated to be between £200m and the retailer pledged to fund a media campaign to win back passengers lost by the closure of its route. Construction of the tunnel finally resumed in January 2009. The store opened in late November 2010.
Services
Chiltern Railways operates regular services on five routes.The Chiltern Main Line is the core route for the majority of Chiltern Railways services and is one of two "mainline routes" operated by the company. The route links the major cities of London and Birmingham, passing through the towns of High Wycombe, Banbury, Royal Leamington Spa, Warwick and Solihull. Chiltern Railways operates trains along the entire line, services ranging from stopping suburban trains to express trains running the full length of the line between London and Birmingham. The fastest timetabled journey from Birmingham to London by this route is 99 minutes. In addition to the Chiltern Railways services, CrossCountry also operates regular services on the line north of Banbury, and West Midlands Trains operates regular services north of Dorridge.
The London to Aylesbury Line is the second "mainline route" operated by the company. The route links London with Aylesbury via Amersham. All Chiltern Railways services on this route run the full length of the line between Marylebone and Aylesbury stations and call at all stations north of Amersham; most trains are extended one station further to Aylesbury Vale Parkway. The line runs alongside London Underground's Metropolitan line between and Harrow-on-the-Hill, each operator running on separate tracks. Beyond Harrow-on-the-Hill, the tracks are shared between Chiltern Railways and Metropolitan line services. This is the only example of National Rail services using non-Network Rail tracks, and it uses a unique unregulated track-access agreement with London Underground. Beyond Amersham, all services are operated by Chiltern Railways only.
The other three routes regularly served by the company are all branch lines. The Princes Risborough to Aylesbury Line links Princes Risborough, on the Chiltern Main Line, with Aylesbury, on the London to Aylesbury Line. Most trains on the line continue beyond Princes Risborough to London Marylebone, which gives Aylesbury an alternative route to reach central London; however, a few services terminate at Princes Risborough. The Oxford to Bicester Line branches off the Chiltern Main Line just south of Bicester and links the town with Oxford. The line is mostly served by express services to and from Marylebone. Until December 2016, the line terminated a few miles northeast of Oxford, at the nearby Oxford Parkway station; the line was then extended to the main Oxford station. The Leamington to Stratford Line branches off the Chiltern Main Line at Hatton and runs to Stratford-upon-Avon. The branch line is also operated by regular West Midlands Trains services.
As of May 2019, its routes off-peak Monday to Friday include:
Intercity
Regional
Commuter
Extension to Kidderminster
At peak times on weekdays, some services between London Marylebone and Birmingham are extended beyond the latter, to and from . These trains run to Marylebone in the morning peak and return towards Kidderminster in the evening peak. The trains also call at some stations between Birmingham Moor Street and Kidderminster, although not all services have the same calling pattern.As of July 2016, there are four trains per day in each direction between Marylebone and Kidderminster, plus another one which is extended only as far as Stourbridge Junction. On Saturdays, there are also four morning trains from Kidderminster to Marylebone from the December 2017 return services in the evening were introduced. There were no Chiltern Railways service to Kidderminster on Sundays until the December 2017 timetable when 2 trains in each direction were introduced.
Regular trains between Birmingham Moor Street, Stourbridge Junction and Kidderminster are operated by West Midlands Trains as part of its Snow Hill route service.
Parliamentary trains
Chiltern Railways operates two parliamentary train services:- Cherwell Valley line: there is a single daily parliamentary service operating on the Cherwell Valley Line from to Banbury, operated by Chiltern Railways. This service runs on Tuesdays to Saturdays just after midnight and calls at, and - the three intermediate stations on the line. There is no corresponding return service heading towards Oxford. This service exists to maintain route knowledge for Chiltern Railways' drivers. Regular services on the line are operated by Great Western Railway and CrossCountry.
- New North Main line/Greenford branch line: the company also operates a weekday parliamentary service to and from in the late morning. As of April 2019, there is one train per day from South Ruislip, running via the single-track line parallel to London Underground's Central line formerly known as the New North Main Line, then joining the Greenford branch line just beyond itself, before terminating at West Ealing. The corresponding return service runs through to back the same way. Neither service calls at any intermediate stations. Until December 2018, these services ran to and from. They were then diverted to West Ealing following closure of the easternmost section of the New North Main line for High Speed 2 construction.
Buckinghamshire Railway Centre
Tickets
Since winning the franchise, Chiltern has introduced "Route: High Wycombe" tickets for the Chiltern route between Birmingham and London that are considerably cheaper than "Route: Any Permitted" tickets, valid on the faster Avanti West Coast service to London Euston as well a number of other operators and routes. Chiltern offers only Standard Class, not Standard and First Class as on Avanti services. However, Chiltern does offer a premium economy "Business Zone" carriage on a small number of peak-time trains between Birmingham or Oxford and London. Passengers pay an upgrade fee to sit in a larger first-class-style seat; and formerly, this upgrade came with complimentary refreshments but, since May 2017, refreshment services have been cut on all Chiltern Railways services, meaning the "Business Zone" no longer comes with complimentary refreshments.Performance
Chiltern was considered one of the best operators in Britain, with Public Performance Measure regularly over 90%, until the introduction of changes in November 2015 and infrastructure issues saw punctuality fall to 86% in December 2015. Chiltern's PPM is measured on stricter conditions than its long-distance rivals, such as Avanti West Coast, as Chiltern has a 5-minute window for performance while others have a 10-minute window.Performance figures published by Network Rail rate Chiltern Railways sixth in train operating companies in the UK at 89.4% and 94.3% for the year to 12 December 2015.
A new timetable introduced in September 2011, combined with significant disruption caused by engineering work, caused a negative reaction from customers. A petition to have the service reviewed was started, and articles describing the disrupted journeys of commuters appeared in the local press.
A new timetable introduced in December 2012 also met with frustration and opposition from some customers, particularly those using Saunderton and Princes Risborough stations.
Project Evergreen
Evergreen is the name given by Chiltern to the major infrastructure works that the company has committed to over the 20-year duration of its franchise to improve routes and services. This has been divided into three distinct phases.Evergreen 1
The main focus of phase 1 was the redoubling of the Chiltern Main Line between and in 1998 and Bicester North and Aynho Junction in 2001, together with the reconstruction of from a single platform to two platforms, the installation of a new platform at, and the raising of the line speed limit.Evergreen 2
Phase 2 began after the award of Chiltern's new 20-year franchise. This entailed a realignment of the route through to allow speeds to be increased to 75 mph, improved signalling between High Wycombe and Bicester and between Princes Risborough and Aylesbury, the construction of two new platforms at London Marylebone on the old carriage sidings, and the construction of a new depot at Wembley.Evergreen 3
The Department for Transport, Chiltern Railways and Network Rail agreed in January 2010 to a £250m upgrade of the Chiltern Main Line.Phase 1
Phase 1 of the project, now complete, involved upgrading the Marylebone – Birmingham Chiltern Main Line to permit running on an additional of route. Junctions at Neasden, Northolt and Aynho were remodelled to permit higher speeds. The 'up' through track has been restored at, the existing 'up' line becoming a platform loop, a new turnback siding has been provided at, and a new, straighter 'down' through track built from Northolt Junction to Ruislip Gardens. The existing 'down' track continues to serve station. The former speed restrictions through have been removed to permit 100 mph running. Two additional terminating platforms at Birmingham Moor Street were reopened in December 2010. Accelerated services were initially planned to start in May 2011, but there were delays and it was not until 5 September 2011 that Chiltern was able to introduce a new timetable to take advantage of the improvements.As a result of the speed increases, journey times have been reduced significantly. From Marylebone, the fastest peak-hour journey time to Birmingham Moor Street is now 90 minutes, instead of 117 minutes previously. The table below outlines the peak timetable improvements.
Previous | Post Phase 1 | |
Gerrards Cross | 21 | 18 |
High Wycombe | 34 | 23 |
Princes Risborough | 41 | 32 |
Bicester | 56 | 44 |
Banbury | 63 | 50 |
Leamington Spa | 85 | 67 |
Solihull | 107 | 84 |
Birmingham | 117 | 92 |
Chiltern Railways former chairman Adrian Shooter said, "This is the biggest passenger rail project for several generations not to call on the taxpayer for support. Working closely with Network Rail, we are going to create a new main-line railway for the people of Oxfordshire and the Midlands. This deal demonstrates that real improvements to rail services can be paid for without public subsidy by attracting people out of their cars and on to trains."
Phase 2
In October 2012 the Secretary of State for Transport granted permission for work to begin on Phase 2 of the Evergreen 3 project, with services between London Marylebone and Oxford. Under Phase 2, a quarter-of-a-mile double track has been constructed joining the Oxford to Bicester Line at to the Chiltern Main Line, allowing a new Oxford to London Marylebone service to operate. A new station,, has been constructed at Water Eaton; the service between Oxford Parkway and London started on 26 October 2015, with the link from Oxford Parkway to becoming operational on 12 December 2016. All signalling on the route is controlled by Marylebone Signalling Centre.As part of Phase 2, the Oxford to Bicester Village service transferred from First Great Western to Chiltern in May 2011. Part of the line between Wolvercote Tunnel and Bicester Village was restored to double track, and the scheme included additional platforms at Oxford, and Bicester Village.
Network Rail provided the capital for the upgrade and will recover this through a facility charge over the subsequent 30 years, initially payable by Chiltern until its franchise expires, and then by the next franchisee. The infrastructure upgrade was carried out by main contractor BAM Nuttall, in partnership with Jarvis and WS Atkins.
Oxfordshire County Council supported the scheme, but had to be convinced of the benefits of the new Oxford Parkway station at Water Eaton, which is in the Green Belt. There was a further setback to the plan when in November 2011 a planning inspector withheld approval because it was found that bats were roosting in Wolvercote Tunnel. Great crested newts also have a breeding habitat close to the route. The "bat problem" however seems to have been resolved.
Rolling stock
Chiltern Railways inherited a fleet of 34 Class 165 Turbos from British Rail. In December 2004 a further five Class 165s were transferred from First Great Western Link. All 39 were overhauled by Bombardier at Ilford EMU Depot in 2003 – 2005, including installation of air-conditioning and removal of the hopper opening windows and the first-class seating. As they were designed for suburban rather than InterCity use, they tend to be concentrated on services to Aylesbury and Banbury, although this stock can also be found operating the service between Birmingham and Leamington Spa.Chiltern ordered several batches of Class 168 Clubmans, entering service between 1998 and 2004, and now has nine three-car and ten four-car sets. These operate across the network.
In April 2003 Chiltern restored a Class 121 Bubble Car for use on the to shuttles, a second following in May 2011 after overhaul at Tyseley TMD. In March 2013, a third Class 121 was acquired from Arriva Trains Wales for use as a spare parts donor. On 19 May 2017 the Chiltern Bubble cars ran for the last time, as their age made spare parts very difficult to obtain.
In January 2008 Chiltern ordered four two-coach Class 172 Turbostars. These entered service in June 2011. Because they cannot be fitted with tripcock safety equipment necessary to operate on London Underground lines, they cannot operate via unless attached to a Class 165 or 168. Although initially intended for use on all-stations services out of London, they frequently operate to Birmingham.
From December 2010 Chiltern began operating two peak-hour loco-hauled services consisting of a Class 67 hauling Mark 3 coaches and a Driving Van Trailer. One set was hired from fellow DB Regio subsidiary Wrexham & Shropshire to operate a Birmingham Moor Street to London Marylebone service while the other was made up of some DB-Regio-owned Mark 3s painted in British Rail blue/grey and Virgin Trains livery and operated from to London Marylebone.
After Wrexham & Shropshire ceased operations in January 2011, Chiltern began using a second ex-Wrexham & Shropshire set from May 2011. For the introduction of Chiltern's new timetable in September 2011 they had a Mainline logo and blue stripes added to their silver livery. Motive power was provided by Class 67s, 67010, 67012-015 and 67018, all modified to operate with Driving Van Trailers.
In 2012 the ex-Wrexham & Shropshire Mark 3s were overhauled, and fitted with sliding plug doors and toilet retention tanks by Wabtec's Doncaster Works. Once this was complete, a further ten Mark 3s were overhauled by Wabtec to create a fifth set and bring the existing sets up to six coaches. In 2012 the DB-Regio-owned Mark 3s used on the peak-hour Banbury service were given a light overhaul at LNWR, Bristol, and the Virgin-liveried examples repainted into British Rail blue/grey. To allow Class 168s to be cascaded to the new Oxford services as part of Evergreen 3, more Mark 3s are to be returned to service in the future.
Between 2015 and 2016, Class 170 Turbostars with First TransPennine Express transferred to Chiltern Railways. Chiltern took five of the First TransPennine Class 170s from May 2015 and the remaining four in July 2016. Upon delivery, the Class 170s were modified to allow them to be used with Chiltern's existing Class 168s, and reclassified as Class 168/3s.
In early 2014, Chiltern Railways agreed a sub-lease from Direct Rail Services for six Class 68 locomotives for use on its London Marylebone to Birmingham service to replace the existing fleet of Class 67s. Maintenance and commissioning for the new fleet is assisted by DRS.
In 2017, Chiltern Railways entered into an agreement with Artemis Intelligent Power and the Rail Safety and Standards Board to provide one of its redundant DVTs as a donor vehicle for conversion into a new type of diesel locomotive.
Current fleet
Past fleet
Former train types operated by Chiltern Railways include:Plans
Active
In addition to the completed Evergreen initiatives, other potential enhancements for Chiltern's route have been discussed, but had not progressed as at the end of 2017. These include:- Upgrading the Acton–Northolt line to new platforms at. This upgrade will also extend to to increase capacity on the Chiltern Main Line as there is no room to expand the station at Marylebone.
- Restoration of fast through lines at Beaconsfield as part of a longer-term aspiration for a 90-minute journey time between London and Birmingham.
- Remodelling Banbury Station and tracks.
- Building of the West Hampstead interchange to allow easy interchange with the London Overground - North London Line, Jubilee line, Metropolitan line and Thameslink services.
- New Chiltern Metro Service that would operate 4+tph for Wembley Stadium, Sudbury & Harrow Road, Sudbury Hill Harrow, Northolt Park, South Ruislip and West Ruislip. This would require a reversing facility at West Ruislip, passing loops at Sudbury Hill Harrow, and a passing loop at Wembley Stadium. This 'Chiltern Metro' service was not programmed into the last round of franchising agreements.
- Re-opening the passenger line between and as part of the East West Rail project, and from to East West Rail at Claydon LNE Junction to provide a route to Milton Keynes and the West Coast Main Line via . Two miles of the line north of Aylesbury re-opened on 14 December 2008 terminating at a new station,. However, in late 2017 the Government announced that the private company, East West Rail Ltd., had been formed to build and operate the line exclusively.
- Opening a rail line from Aylesbury to an M6-M1 Parkway Station near Rugby.
- Extending Oyster Pay-as-you-go to and.