Red Metropolitana de Movilidad


Red Metropolitana de Movilidad is a public transport system that serves Santiago, the capital of Chile. It is considered the most ambitious transport reform undertaken by a developing country according to the World Resources Institute.
The system, largely influenced by Bogotá, Colombia's TransMilenio and Curitiba, Brazil's RIT, was introduced on February 10, 2007. It standardized bus routes and eliminated redundancy of same; redundancies were commonplace in the old system, which was run by thousands of independent bus operators. The system combines local bus lines, main bus lines and the Metro network. It includes an integrated fare system, which allows passengers to make bus-to-bus or bus-to-metro transfers for the price of one ticket, using a single contactless smart card.
Transantiago's implementation was problematic, as the decreased bus fleet and the newer routes have proved insufficient to properly serve a population inadequately informed of pending changes. The major complaints are the lack of buses and their inconsistent frequencies, missing or poor infrastructure, the network's coverage, and the number of transfers needed for longer trips. As a result, users have overcrowded the Metro, which is generally held to be fast and dependable.

Details

Transantiago's first stage of implementation began on October 22, 2005, when a group of ten new companies took control of the capital's bus system, immediately introducing 1,181 new, modern low-floor buses made by Volvo in Brazil, replacing 461 yellow-colored buses from the old system. The new buses will temporarily run alongside the over 7,000 existing older buses that will be gradually removed from the system until 2010. In October 2006, a users' information system was introduced.
Transantiago became fully operational on February 10, 2007, with the introduction of a new route system dividing bus lines into two complementary groups: main and local lines. In addition, a new fare structure was implemented, allowing transfers at small or zero fares between buses and metro, when using the new contactless smartcard. 1,776 new buses will operate at this stage. The older yellow-colored buses will only operate through the secondary local lines in conjunction with new but simpler buses. It is expected that by 2010, the older buses will be completely replaced by over 4,600 new vehicles.

Objectives

Bus services were divided into two subsystems. The first subsystem corresponds to the , which complementing the metro network allow long trips between different zones of the city. The second subsystem corresponds to the local bus lines, which allow short trips and feed the metro and main bus lines. Local services are organized in , each corresponding to one or more municipalities of Santiago.

In June 2012, the scheme of local and trunk services was disbanded. The requirement to have each business unit with different companies was eliminated and the relationship between these tours are encouraged, in order to provide better service to passengers by reducing transfers. From that moment seven operating units, each assigned to a concessionaire which included both trunk and local services were generated. The buses are painted, according to Business Unit won each company, which is identified by a specific color. In this way, the color of the buses does not represent the zone covering the system as stipulated in the beginning and remained until June 2012.
U1AlsaciaServicios 100
U2Subus ChileServicios 200 y G
U3Buses VuleServicios 300, E, H e I
U4Express de Santiago UnoServicios 400 y D
U5MetbusServicios 500 y J
U6Veolia Redbus UrbanoServicios B y C
U7S.T.P. SantiagoServicios F

The details of both the main bus lines and the local bus lines can be seen in the official .

New fare structure

An integrated fares scheme was introduced for buses and metro, allowing to transfer for free or paying a small transfer charge. During the first six months of operation, up to three transfers are completely free. The definitive fare scheme considers two basic fares, in addition to the transfer fares.
The local fare will allow local trips inside a local area, also allowing free transfers between local services in that area. The main fare will be a little higher and will allow trips both in the main bus lines and metro, including free transfers between them. Finally, a transfer fare will have to be paid when transferring between a main bus service and a local service. This transfer fare will be much smaller than the basic fares. As before, students will be allowed to pay reduced fares, at 35% of the normal ones.
Fares will be adjusted periodically, according to the changes in the main input prices of the operators. The way in which the fare adjustments is calculated has been established in the operation contracts. Therefore, neither operators nor the authorities are able to change the fares at will.

Payment and financial administration

The main payment system of Transantiago is a Contactless smart card called Tarjeta Bip! similar to the Multivía card, which was previously operated by the metro. This card is used both in buses and metro as a prepaid card. The access to the reduced or free transfer fares is only possible when using this card, as the electronic system associated to the card automatically recognizes if users are starting their trip or just making a transfer. In this way, the system can determine whether the basic fare is to be charged or if a transfer or free fare applies. Passengers who do not have the card may pay in cash, but at a higher fare and without possibility of reduced transfers.
The operation of the payment system was tendered to a private company. Its main tasks are the distribution and charging of the card, the administration of the revenues and the payment to the operators, according to the rules established in the contracts.

User information

Another component of the system is the information manager and users' information provider, which was tendered and awarded to the private company in 2007. Its main tasks are: provide information for the users both before and after the implementation of the system, provide information about the localization of the buses to the operators and coordinate emergencies with the relevant bodies.

Vehicles

In comparison to the old buses of Santiago, at least half the new ones have a low floor, and all have a blocking system that does not allow the bus to move before all doors are closed. Since 2003, all new buses in Santiago fulfill the emission norm Euro III.
After the implementation of the new lines structure, the main bus lines will be operated with articulated and normal buses, while the local services will be operated with normal buses and minibuses.

Technical characteristics

Most of the low-floor buses for Transantiago were built by Volvo. Several operating companies of Transantiago bought 1,157 articulated buses and 510 normal buses .
The articulated B9SALF Volvo bus has a capacity of approximately 160 passengers, four double doors, 100% low floor, a length of 18.5 meters and a width of 2.5 meters. The engine is on the left side between the first and second axles and has 340 hp.
The Volvo B7RLE bus, with a capacity of approximately 80 passengers, has three double doors and low floor between the first and second doors. It has a length of 12 meters and a width of 2.5 meters. The engine is in the back of the vehicle and has 7,000 cm³.

Problems and criticism

There were several problems with the design and initial implementation of the plan. Bus owners' contracts offered no incentive to improve service, as they received a fixed payment no matter how many passengers they transport. The centralized system for controlling frequency of buses is not working, which was a main point in the original design. Passenger fare evasion was high. Many people considered the service to be poor and were not willing to pay for it, while others were taking advantage of the situation. Routes were poorly defined and took little account of commuter's habits. One clear failing of the system was that there were no bus stops by many hospitals.
Although polls had shown the citizens of Santiago were overwhelmingly in favor of a new transport system, its implementation was heavily criticized for not meeting up to people's expectations. The system's first days in operation were chaotic at many of the bus stops, since there were not enough buses to cope with the demand. Additionally, many complained that the old bus routes were easier and faster, a claim confirmed to an extent in an investigation by El Mercurio, which found that most of the new routes took more time than the ones in the older system. Opposition politicians on both sides of the political spectrum—from Communist Party Secretary General Guillermo Teillier to right-wing UDI deputy Iván Moreira—criticized the implementation of the new system, calling it "improvised" and "unprofessional".
Support in Santiago for President Michelle Bachelet's government fell from 55.2% in February to 42.7% in March, 2007, after the Transantiago began operating, according to the monthly Adimark polls. Political analysts attributed the fall solely to the Transantiago, saying that there is no other possible cause for the dramatic fall in support. A poll taken by Benchmark agency, requested by the opposition, showed that 47% did not approve of the implementation of Transantiago, 64% labeled the implementation as "improvised", and 53% disapproved of the way President Bachelet had handled the situation. Many people have also blamed former president Ricardo Lagos, because it was his government that was responsible for the system's design.
One consequence of Transantiago is that the Metro system, which was to be a backbone of the system, was overwhelmed with over six users per square meter. The increase in usage was reported as having gone from 1,300,000 to 2,200,000. Metro president Blas Tomic was quoted as saying: "The capacity of metro has reached its limit" and the Colegio Médico recommended that the elderly and users with medical conditions avoid the system.
The government defended the plan as necessary for a better transport system, adding it will improve as people become more used to it, adding everything is being done to improve it.
One of the main lessons learned from Transantiago's planning and implementation is the risky consequences of introducing the operational service for the entire scheme at once, without a transition period between the old system and the new scheme, or what has been called as a "Big Bang" approach. Several other Latin American cities, such as Curitiba, Brazil, Bogotá, Colombia, and Montevideo, Uruguay, implemented similar BRT schemes, but gradually, phasing in the scheme in several stages, allowing to make adjustments and hastily fixing glitches, without any serious disruption to transit services.

A year later

Once the dust settled and the numerous problems were ironed out, most users agree that the new system is an improvement. El Mercurio newspaper released some stats comparing the system a day before it made its debut and a year after :
ItemFebruary 10, 2007February 10, 2008±%
Fleet management centers010n/a
Operators10100%
Waiting times+30 min.4-8 min.-87/-83%
Bip! Service Points4901,307+167%
Bus-only lanes1115+36%
Bus stops3,1138,200+163%
Main buses3,1554,137+31%
Pre-pay zones0100n/a
Secondary buses1,4992,248+50%
Segregated corridors1319+46%
Main routes90140+56%
Re-pavement100 km140 km+40%
Secondary routes133177+33%
Card charge points5401,957+262%
Exclusive lanes89+13%
Metro trains666751+13%

Not currently operating

  • Security cameras
  • Passenger counter
  • Variable info panel
  • GSM/GPRS system
  • Panic button
  • Fleet management software

    Currently operating

  • Clearing
  • Bip! card
  • Ticket validator
  • GPS

    2019 Chilean protests


OWIKI.org. Text is available under the Creative Commons Attribution-ShareAlike License.