Peninsula Commute
The Peninsula Commute, also known as the Southern Pacific Peninsula or just Peninsula, was the common name for commuter rail service between San Jose, California and San Francisco, California on the San Francisco Peninsula. This service ran as a private, for-profit enterprise beginning in 1863. Due to operating losses, the Southern Pacific Railroad petitioned to discontinue the service in 1977. Subsidies were provided through the California Department of Transportation in 1980 to continue service, and it was renamed Caltrain.
History
Since 1863 the San Francisco Peninsula, the series of towns between San Francisco and San Jose, has been served by a railroad. The San Francisco and San Jose Railroad first provided freight and passenger service, followed by its successor, the Southern Pacific, and then briefly by the California Department of Transportation and finally by a regional Joint Powers Board which runs today's passenger trains.San Francisco–San Jose Railroad
Although a line had been proposed in the past, construction on the railroad between San Francisco and San Jose was started in 1860 "by a group of local capitalists of more than ordinary energy and resources" under the auspices of the San Francisco and San Jose Rail Road, and completed in 1863. The Central Pacific Railroad transferred its rights for the construction of the right-of-way between San Jose and Sacramento to the Western Pacific Railroad in late 1862.In December 1865, the Southern Pacific Railroad Company was incorporated to build a rail line between San Francisco and San Diego. By the end of 1868, it was revealed the Big Four of the Central Pacific consisting of Stanford, Huntington, Hopkins, and Crocker had a controlling interest in the SF&SJ and SP, and the SF&SJ, SP, the Santa Clara and Pajaro Valley Railroad, and the California Southern were folded into a consolidated Southern Pacific Railroad on October 12, 1870.
Under Southern Pacific
Under Southern Pacific the line was double tracked in 1904, and multiple cutoffs were built over a period ending in 1910. The first of these, the Bayshore Cutoff, opened in 1907 and rerouted the line through a series of five tunnels built along the shoreline of San Francisco Bay. This saved approximately three miles and seventeen minutes compared to the prior route, which veered to the west around San Bruno Mountain. The Bayshore Cutoff also eliminated the use of helper engines to bring trains over the mountain. The second, the Mayfield Cutoff, opened in 1908 to provide service to western Santa Clara Valley cities such as Los Altos and Los Gatos. The third, the Dumbarton Cutoff, opened in 1910 and included the first bridge across San Francisco Bay, between Newark and Menlo Park, saving many miles to Oakland and Sacramento compared to the prior route through San Jose and Santa Clara.The Peninsula Electric Railroad was incorporated around the same time the Dumbarton Cutoff project was launched, and it was suspected that it was controlled by Southern Pacific in preparation for a quad-track expansion, as it was laying a route parallel with the Southern Pacific. As envisioned in 1909 from plans for the Peninsula Electric, SP announced that it would investigate the electrification of its Peninsula Commute line in September 1921, promising better and more frequent service. Just a few days later, SP cited excessive post-war inflation, taxation, and competition from publicly funded highways as factors making electrification neither "practicable or desirable". Similarly, plans to eliminate all at-grade crossings were announced in 1909, but not carried to completion. As Southern Pacific's franchise to operate on 4th Street in San Jose was ending, it elected to build a diversion track to the west. This line forced a move for the city's passenger traffic to a new station at Cahill, placing it one mile from downtown.
SP's Peninsula Commute experienced record ridership during World War II. During the war, 26 trains ran between San Jose and San Francisco per day, with headways as low as 5 minutes in the mornings and 3 minutes in the evenings. After the war, a May 1946 railroad strike displaced approximately 10,000 train passengers onto highways, causing "historic" traffic jams along the Bayshore Highway, with commute times for some automobile drivers to balloon from 30 minutes to 75 minutes going from Burlingame to San Francisco, a distance of approximately. In 1954, surveys comparing traffic on Bayshore Highway with train traffic concluded that just over half of all commuters to San Francisco passing through Brisbane were taking the train, and that eight more lanes would need to be added to the freeway to accommodate traffic if rail service were to stop suddenly.
However, in the period after the war, Peninsula roads were improved; the four-lane undivided Bayshore Highway was rebuilt into a six-lane divided freeway between 1949 and 1962, and Interstate 280 was completed in the 1970s. Train ridership declined with the rise of automobile use, falling from a peak of 9.2 million annual boardings in 1954 to 4.4 million in 1977.
During peak hours, Peninsula Commute trains operated with headways as low as three or four minutes; however, with skip-stop and express train service patterns, the minimum wait for riders at a given station would be ten minutes. During off-peak hours, service frequencies dropped to longer than two hours between trains.
On several occasions during the 1960s and 1970s, SP attempted to discontinue the commute service due to increasing deficits and stagnant ridership. Ridership was 11,500 daily passengers on 22 trains in 1970, compared to 12,000 daily passengers in 1967 and 10,000 daily passengers in 1946. In 1971, when Amtrak took over long distance passenger operations, Southern Pacific's extended commute train to Monterey, California, the "Del Monte", was discontinued. Some SP passenger locomotives were sold to Amtrak and the remainder were transferred to Peninsula Commute service, which continued to operate. In 1975, the Metropolitan Transportation Commission published the Feasibility of Upgrading Peninsula Passenger Rail Service report. PERSUS concluded the Peninsula Commute was underutilized and proposed a minor upgrade to improve service, or major upgrades to extend service to downtown San Francisco, either by connecting with BART in, or by extending the SP terminus to the Transbay Terminal; the ultimate goal was to remodel the service to be closer to transit than commuter rail, which entailed a reduction in headways so that passengers would have to wait less than fifteen minutes between trains during weekday daylight hours.
s from Amtrak to operate the Peninsula Commute.
However, by that time the Peninsula Commute was no longer profitable: operating deficits were rising, from in 1964 to over by 1968, by 1975, and just one year later in 1976 according to an independent review, which prompted SP to petition the California Public Utilities Commission for a fare increase of 111 percent in August 1974, as fares had increased minimally and ridership, approximately 12,000 passengers per day in 1967 remained flat, despite the fuel crisis. The CPUC authorized a 25% increase in fares in a 3–2 vote on July 12, 1977, effective August 1977. Because the CPUC decision process was so slow, SP President Benjamin Biaggini offered to purchase 1,000 eight-passenger vans and donate them for vanpools in exchange for permanently discontinuing the Peninsula Commute service.
On May 6, 1977, SP formally filed a petition with the CPUC to discontinue the commuter operation due to ongoing losses. At that time, SP was running 44 trains a day. The petition was opposed by regional transit agencies, including the MTC, who passed Resolution No. 479 to request the CPUC deny the SP petition. On October 17, 1977, the administrative law judge issued an order asking "Who will pay the cost of this regional insurance against the uncertainties of tomorrow? In the interim period, CALTRANS, the Metropolitan Transportation Commission, and the three counties involved are directed to meet, consult, and plan toward whether they will be willing to obtain funds under the provisions of the Urban Mass Transportation Act and their own resources to meet the operating deficit of Southern Pacific's commute and transit operations."
Since the CPUC had not taken action on the petition 120 days after the filing, SP filed another petition to discontinue service with the Interstate Commerce Commission on November 17, 1977. Although the CPUC denied the SP application on April 19, 1978, jurisdiction had already passed to ICC.
State administration and Caltrain
In response to the CPUC petition, Assemblymember Lou Papan wrote Assembly Bill 1853, which allowed local transit districts served by the Peninsula Commute to purchase tickets from SP at face value and sell them to riders at a discount, subsidizing passengers. AB 1853 also allowed the California Department of Transportation to negotiate with SP for operation of the commuter rail service and the purchase of the right-of-way between Daly City and San Bruno, which had only seen occasional freight traffic since the completion of the Bayshore Cutoff in 1907. Preservation of rail service was seen as critical to ensuring traffic would continue to flow, as both the Bayshore Freeway and I-280 were nearing capacity; and to preserve air quality in the region. The right-of-way between Daly City and San Bruno was seen as key to a planned extension of BART to San Francisco International Airport, an extension that eventually opened in 2003.The recommendations of the 1977 Peninsula Transit Alternatives Project Report were used to draft AB 1853. PENTAP recommended that train and bus service be improved, fixed rail transit facilities be better utilized in the near future, and facilities and options should be preserved for long-range expansion and modernization. MTC passed Resolution No. 411 in 1977, proposing a three-phased approach:
- Maintain existing service levels, by subsidizing passenger fares and improving the SP interface with MUNI
- Improve service levels and standards, by entering into a "purchase of service" contract with a rail operator and defining service based on regional transit requirements, not operator needs or profits
- Expand rail service
Ridership increased during 1979 and 1980, aided by the gasoline crisis and fare subsidies; the Peninsula Commute was so sensitive to gasoline prices that ridership jumped by 40% in May and June 1979. SP's ICC petition received a preliminary affirmative ruling from the administrative law judge in July 1979. To preserve the commuter service, Caltrans took over financial responsibility on, and contracted with SP to operate the service. In the first fiscal year, covering 1980–81, operating costs were $19.33 million and fare revenue was $7.81 million, resulting in a farebox recovery ratio of 43%. The deficit was covered by a mix of Urban Mass Transportation Act funds, contributions from SP, and the state and three counties served. During state administration, Caltrans purchased new locomotives and cars that replaced the SP equipment in 1985 and provided push-pull service, upgraded stations, introduced shuttle buses to nearby employers, and renamed the operation Caltrain. Southern Pacific continued to operate the service under contract to Caltrans. However, ridership continued to decline and the farebox recovery ratio fell to 34.3% in the 1983–84 fiscal year, which violated the minimum of 40% set by AB 1010 in 1982.
By 1988, the service was the only operating commuter rail in California. The state felt that regional control of the Peninsula Commute was more appropriate, as it was primarily a benefit to the region, not the state. Thusly the Peninsula Corridor right-of-way was purchased for from SP in 1991 by the newly formed Peninsula Corridor Joint Powers Board, who subsequently assumed responsibility for the operation of Caltrain in 1992. The PCJB then contracted operations to Amtrak, ending 122 years of operation by Southern Pacific. TransitAmerica Services took over operations in 2012.
Rolling stock
SP took over the Peninsula Corridor route from the SF&SJ in 1870 and assumed control of the existing set of locomotives and passenger cars, which were mainly 4-4-0 steam engines and 36-passenger wooden railcars. As SP began introducing diesel locomotives on its long-distance routes, steam engines were moved into Peninsula Commute service, culminating in the use of the large "General Service" 4-8-4 locomotives which served the Peninsula Corridor through 1957. Diesel-electric Fairbanks-Morse Train Masters had been running in Peninsula Commute service since 1954. Fairbanks-Morse and, later, EMD diesels served the Peninsula Commute past 1980, when the state-run CalTrain began assuming financial responsibility for the service, and were not retired until 1985, when the state purchased new EMD F40PH locomotives. One of the factors driving the purchase of new locomotives was the dramatic increase in annual lease costs in 1985.Locomotives
;SteamBuilder | Model/Class | Locomotive Numbers | Years of Service | Notes | Photograph |
Various | 4-4-0 "Eight Wheel" or "American" | 1870-1900s | |||
Various | 2-6-0 "Mogul" | 1870-1900s | |||
Various | 4-4-2 "Atlantic" | 1870-1900s | |||
Various | 4-6-0 "Ten Wheel" | c.1900s-1950s | |||
American Locomotive Company | 4-6-2 "Pacific" | 2400–2404 | c.1923/24–1954 | Built 1904; displaced from main-line passenger service by 4-8-2 locomotives. | |
Baldwin | 4-6-2 "Pacific" | 2405–2427 | c.1923/24–1954 | Built 1906–1907; displaced from main-line passenger service by 4-8-2 locomotives. | |
Schenectady | 4-8-2 "Mountain" | 4300–4327 | c.1945–1954 | Built 1923–1924; displaced from main-line passenger service by 4-8-4. | |
Baldwin | 4-8-4 GS-1 | 4400–4409 | c.1950–1957 | "General Service" or "Golden State" class built 1930; displaced from main-line passenger service by diesel-electric locomotives. | |
Lima | 4-8-4 GS-2 thru GS-6 | 4410–4469 | c.1950–1957 | Built starting 1937 | |
- | - | - | c.1950–1957 | - | - |
With population growth on the Peninsula, the initial mix of 4-4-0, 2-6-0, and 4-4-2 locomotives were replaced by 4-6-0s. Older locomotives were redesignated to Commute service after they were displaced by newer locomotives assuming main-line passenger service. Pacific-type 4-6-2s were used on peak-hour commutes by the 1930s and 1940s, displacing 4-6-0s, and more 4-6-2s were made available for the Commute by the introduction of 4-8-2s in main-line service; by 1945, the 4-8-2s were displacing 4-6-2s on peak-hour trains, 4-6-2s were moved to off-peak service, and 4-6-0s were used on weekend trains. By the early 1950s, peak-hour trains were pulling up to seventeen cars in a single consist, requiring the use of the "General Service" class 4-8-4s.
After gaining experience with diesel engines in main-line service, SP began testing various diesel locomotives for the Peninsula Commute, finally selecting the Fairbanks-Morse H-24-66 "Train Master" because the relatively short distance between stations meant acceleration was the paramount priority. The final steam-led Peninsula Commute train departed San Francisco for San Jose on January 22, 1957, led by 4-8-4 No. 4430. However, 4-6-2 No. 2472 was moved from San Francisco to San Jose at the head of Caltrain #74 on December 16, 1994; #2472 was to lead a special charity excursion train back to San Francisco the next day. While coupled to Caltrain #74, though, #2472 was used to help accelerate the train out of each station, so it was not just a cosmetic appearance. #2472 has since been used occasionally along the Peninsula Corridor for special service, but not while providing revenue passenger service.
;Diesel
Builder | Model | Locomotive Numbers | Years of Service | Notes | Photograph |
EMD | EMD GP9 | 3186–3196 | 1954–1985 | Initially built as 5600–5603, 5622–5625, 5893–5895; renumbered to 3000–3010 in 1965-66; renumbered to 3186–3196 in 1975. Reverted to SP control in 1985 after lease expired. At least two survived: 5623 and 3194. | 1982 "Rainbow" scheme |
Fairbanks Morse | FM H-24-66 | 3020–3035 | 1954–1975 | Delivered as 4800–4815; 4800 and 4801 were the F-M "western" demonstrators TM-3 and TM-4. Renumbered to 3020–3035 in 1966. All retired and scrapped once major rebuilds were required. | |
EMD | EMD SDP45 | 3200–3209 | 1971–1985 | Moved from long-distance service after Amtrak takeover in 1971. Replaced F-M H-24-66 as they were retired. Pulled from duty in 1978–79. Reverted to SP control in 1985. | |
EMD | EMD SD9 | 4450 Huff and 4451 Puff | 1973/74–85 | 4450 was scrapped in Portola, California, after featuring for years in the collection of the Golden Gate Railway Museum. 4451 still survives in 2017, in derelict condition, at Schellville, California. | |
EMD | EMD GP40P-2 | 3197-3199 | 1974–1985 | Supplemented SDP45s. Reverted to SP control in 1985. Rebuilt as GP40-2 to remove steam generators for passenger car heating once leases reverted to SP. Currently in service: Union Pacific 1373, 1375; Indiana Harbor Belt 4010. | |
GE Transportation Systems | GE P30CH | Amtrak 7xx | 1978–79 | Leased to SP for 1978–79 after SP SDP45s were pulled from passenger service under an ICC order to return offline freight cars. |
The first diesel on the Peninsula Commute ran on September 28, 1953, using SP Locomotive No. 5325, an EMD SD7 equipped with a steam boiler; it left the shortly thereafter, as the SD7 was unable to match the performance of the 4-6-2 steam locomotives then being used for off-peak and weekend service.
SP began testing Fairbanks-Morse "Train Master" H-24-66 locomotives in late 1953, and purchased two of the four demonstrator models for use on the Peninsula Commute service. Because the existing "Suburban" and "Harriman" passenger cars then prevalent in the fleet took steam heat from the locomotive boiler, SP passenger diesel engines were equipped with steam generators. The diesel era of the Peninsula Commute began on August 25, 1954, when two Train Masters went into test service. The Train Masters, which used the unique opposed-piston two-stroke 38 8-1/8 prime mover developed by F-M for American diesel-electric submarines in World War II, were the most powerful diesel-electric locomotives available at a nominal, and had performance comparable to the 4-8-4s for peak service: while the starting tractive effort of the "General Service" class 4-8-4 ranged from, the Train Master was rated at.
The Train Masters were complemented by a fleet of EMD GP9s fitted with steam generators; while peak-hour trains required one Train Master or two GP9s, off-peak and weekend trains could more economically use a single GP9. Switching duties were handled by an ALCO RS-32, or an ALCO S-4. When Amtrak took over inter-city service in 1971, the SP EMD SDP45s then in main-line use were reassigned to Commute service, and three unique passenger-equipped EMD GP40P-2 engines were delivered in 1974, allowing SP to retire all of the Train Masters by 1975. The fleet of EMD GP9s, SDP45s, and GP40P-2s were used by SP to run the Peninsula Commute.
In 1978, SP pulled the SDP45s from Peninsula Commute service to comply with an ICC order to return freight cars. Amtrak leased fifteen GE P30CH locomotives to SP to keep the commuter rail service running, but none of the GE engines were equipped with steam generators. After 1980, the SP fleet continued in leased service to the nascent state-run CalTrain service until the state of California ordered new EMD F40PH locomotives, which were delivered in 1985. Shortly after the introduction of the F40PHs in 1985, a brake issue was discovered, forcing the F40PHs to briefly run in tandem with an SP locomotive.
Passenger cars
The earlier wooden and steel-framed coaches were replaced with the all-steel 72-seat "Harriman" coaches starting in approximately 1900. SP introduced slightly longer all-steel 96-seat "Suburban" coaches in 1924, and continued to run them until the introduction of new state-owned equipment in 1985. The 1980 lease agreement between SP and the State of California showed a total of 83 passenger cars in revenue service: 27 operable "Suburbans", 10 "Suburbans" suitable for parts, and 46 "Gallery" cars., several "Harriman" and "Suburban" coaches survive ; thirteen "Suburbans" are still in revenue service for the Grand Canyon Railway, while others are in use on the Niles Canyon Railway, Sacramento Southern Railroad, Western Railway Museum, among others.SP rolled out Pullman-built "Gallery" cars with two passenger decks in 1955; passengers on the upper deck sat on two balconies along the sides of the car, and the center aisle was open to allow conductors to check tickets on both levels without having to ascend stairs.
A Streamline coach from the Daylight service was converted for Commute use in 1965 by adding five-abreast seating for a total of 122 seats. It was not popular and was sold to the Stockton Terminal & Eastern in 1971. Instead, to increase passenger capacity, SP purchased a third flight of "Gallery" cars, delivered in 1968, which may be distinguished from the 1955/57 Gallery cars by a different window configuration.
"Gallery" and "Subs" could be mixed to make up multi-car consists. In 1978, a Commute train had from one to nine cars, and were always led by a locomotive, meaning the locomotive needed to be turned at each terminal. With the introduction of new state-owned locomotives and rolling stock in 1985 capable of push-pull service, locomotives no longer needed to be turned.
Fares
Peninsula residents clamored for lower fares as early as 1908; SP officials replied by pointing out rates were already cheaper than similar services in New York, Boston, Philadelphia, Chicago, and Baltimore. A discount 10-ride ticket was introduced in 1909 to partially defray rates for frequent commuters. In 1910, SP added that rates across the Bay were comparable, and maintenance of the line between San Francisco and San Jose, partially paid by fares, was expensive. Although SP purchased the electric railway connecting Palo Alto and San Jose, bringing hope that it would be extended further north, it turned out the purchase was merely a strategy to eliminate competition.When fares began to be regulated in 1912, associations in Peninsula cities and Santa Clara County filed complaints against SP, citing rates that were significantly higher than fares to Alameda County destinations of similar distance. The higher rates to Peninsula destinations was believed to cause slow growth of properties on the Peninsula. The suit was heard on August 26, 1912, and after it became clear that many cities felt the rates were excessive and that a rate cut would happen, SP asked for a continuance to put together a compromise.
Also in 1912, SP proposed that private club cars be provided on several morning trains to allow commuters to "enjoy a shave or shampoo and indulge in convival highball while making their daily trips to San Francisco."