Northern line


The Northern line is a London Underground line that runs from south-west to north-west London, with two branches through central London and three in north London. It runs northwards from its southern terminus at in the borough of Merton to in Southwark, where it divides into two central branches, one via in the West End and the other via in the City. The central branches re-join at where the line again divides into two branches, one to and the other to in the borough of Barnet. The High Barnet branch has an additional single-station spur at with a shuttle train to.
For most of its length it is a deep-level tube line. The portion between and opened in 1890 and is the oldest section of deep-level tube line on the Underground network. About 294 million passenger journeys were recorded in 2016/17 on the Northern line, making it the busiest on the Underground. It is unique in having two different routes through central London and two northern branches. Despite its name, it does not serve the northernmost stations on the network, though it does serve the southernmost station,, as well as 16 of the system's 29 stations south of the River Thames. There are 50 stations in total on the line, of which 36 have platforms below ground.
The line has a complicated history, and the current complex arrangement of two main northern branches, two central branches and the southern route reflects its genesis as three separate railways, combined in the 1920s and 1930s. An extension in the 1920s used a route originally planned by a fourth company. Abandoned plans from the 1920s to extend the line further southwards, and then northwards in the 1930s, would have incorporated parts of the routes of two further companies. From the 1930s to the 1970s, the tracks of a seventh company were also managed as a branch of the Northern line. An extension of the Charing Cross branch from Kennington to Battersea is currently under construction, which may either give the Northern line a second southern branch or may see it split into separate distinct lines with their own identities. It is coloured black on the current Tube map.

History

Formation

The core of the Northern line evolved from two railway companies: the City & South London Railway and the Charing Cross, Euston & Hampstead Railway.
The C&SLR, London's first deep-level tube railway, was built under the supervision of James Henry Greathead, who had been responsible, with Peter W. Barlow, for the Tower Subway. It was the first of the Underground's lines to be constructed by boring deep below the surface and the first to be operated by electric traction. The railway opened in November 1890 from Stockwell to a now-disused station at King William Street. This was inconveniently placed and unable to cope with the company's traffic so, in 1900, a new route to Moorgate via Bank was opened. By 1907 the C&SLR had been further extended at both ends to run from Clapham Common to Euston.
The CCE&HR was opened in 1907 and ran from Charing Cross via Euston and Camden Town to Golders Green and Highgate. It was extended south by one stop to Embankment in 1914 to form an interchange with the Bakerloo and District lines. In 1913, the Underground Electric Railways Company of London, owner of the CCE&HR, took over the C&SLR, although they remained separate companies.

Integration

During the early 1920s, a series of works was carried out to connect the C&SLR and CCE&HR tunnels to enable an integrated service to be operated. The first of these new tunnels, between the C&SLR's Euston station and the CCE&HR's station at Camden Town, had originally been planned in 1912, but had been delayed by World War I. Construction began in 1922 and it opened in 1924. The second connection linking the CCE&HR's Embankment and C&SLR's Kennington stations opened in 1926. It provided a new intermediate station at Waterloo to connect to the main line station there and the Bakerloo line. The smaller-diameter tunnels of the C&SLR were also enlarged to match the standard diameter of the CCE&HR and the other deep tube lines.

Extensions

In conjunction with the works to integrate the two lines, two major extensions were undertaken: northwards to Edgware in Middlesex and southwards to Morden in Surrey.

Edgware Extension

The Edgware extension used plans dating back to 1901 for the Edgware and Hampstead Railway which the UERL's subsidiary, the London Electric Railway, had taken over in 1912. It extended the CCE&HR line from its terminus at Golders Green to Edgware in two stages: to Hendon Central in 1923 and to Edgware in 1924. The line crossed open countryside and ran mostly on viaduct from Golders Green to Brent and then on the surface, apart from a short tunnel north of Hendon Central. Five new stations were built to pavilion-style designs by Stanley Heaps, head of the Underground's Architects Office, stimulating the rapid northward expansion of suburban developments in the following years.

Morden Extension

The engineering of the Morden extension of the C&SLR from Clapham Common to Morden was more demanding, running in tunnels to a point just north of Morden station, which was constructed in a cutting. The line then runs under the wide station forecourt and public road outside the station, to the depot. The extension was initially planned to continue to Sutton over part of the route for the unbuilt Wimbledon and Sutton Railway, in which the UERL held a stake, but agreements were made with the Southern Railway to end the extension at Morden. The Southern Railway later built the surface line from Wimbledon to Sutton, via South Merton and St. Helier. The tube extension opened in 1926, with seven new stations, all designed by Charles Holden in a modern style. Originally, Stanley Heaps was to design the stations, but after seeing these designs Frank Pick, Assistant Joint Manager of the UERL, decided Holden should take over the project.
With the exception of Morden and Clapham South, where more land was available, the new stations were built on confined corner sites at main road junctions in areas that had been already developed. Holden made good use of this limited space and designed impressive buildings. The street-level structures are of white Portland stone with tall double-height ticket halls, with the London Underground roundel made up in coloured glass panels in large glazed screens. The stone columns framing the glass screens are surmounted by a capital formed as a three-dimensional version of the roundel. The large expanses of glass above the entrances ensure that the ticket halls are bright and, lit from within at night, welcoming. The first and last new stations on the extension, Clapham South and Morden, include a parade of shops and were designed with structures capable of being built above. Clapham South was extended upwards soon after its construction with a block of apartments; Morden was extended upwards in the 1960s with a block of offices. All the stations on the extension, except Morden itself, are Grade II listed buildings.

Great Northern & City Railway

After the UERL and the Metropolitan Railway were brought under public control in the form of the London Passenger Transport Board in 1933, the MR's subsidiary, the Great Northern & City Railway, which ran underground from Moorgate to Finsbury Park, became part of the Underground as the Northern City Line. In preparation for the Northern Heights Plan, it was operated as part of the Northern line, although it was never connected to the rest of the line.

Naming

The resulting line became known as the Morden–Edgware line, although a number of alternative names were also mooted in the fashion of the contraction of Baker Street & Waterloo Railway to "Bakerloo", such as "Edgmor", "Mordenware", "Medgeway" and "Edgmorden". With Egyptology very much in fashion after the discovery of the tomb of Tutankhamun in 1922, there was also a proposal to call the line the Tootancamden Line as it passed through both Tooting and Camden. It was eventually named the Northern line from 28 August 1937, reflecting the planned addition of the Northern Heights lines.

Northern Heights plan

In June 1935, the LPTB announced the New Works Programme, an ambitious plan to expand the Underground network which included the integration of a complex of existing London and North Eastern Railway lines north of Highgate through the Northern Heights. These lines, built in the 1860s and 1870s by the Edgware, Highgate and London Railway and its successors, ran from Finsbury Park to Edgware via Highgate, with branches to Alexandra Palace and High Barnet. The line taken over would be extended beyond Edgware to Brockley Hill, Elstree South and Bushey Heath with a new depot at Aldenham. The extension's route was that planned for the unbuilt Watford and Edgware Railway, using rights obtained from the earlier purchase of the W&ER. This also provided the potential for further extension in the future; Bushey's town planners reserved space in Bushey village for a future station and Bushey Heath station's design was revised several times to ensure this option would remain available in the future.
The project involved electrification of the surface lines, the doubling of the original single-line section between Finchley Central and the proposed junction with the Edgware branch of the Northern line, and the construction of three new linking sections of track: a connection between Northern City Line and Finsbury Park station on the surface; an extension from Archway to the LNER line near East Finchley via new deep-level platforms below Highgate station; and a short diversion from just before the LNER's Edgware station to the Underground's station of the same name.

Intended service levels

The peak-hour service pattern was to be 21 trains an hour each way on the High Barnet branch north of Camden Town, 14 of them via the Charing Cross branch and seven via the Bank branch. 14 would have continued on beyond Finchley Central, seven each on the High Barnet and Edgware branches. An additional seven trains an hour would have served the High Barnet branch, but continued via Highgate High-Level and Finsbury Park to Moorgate, a slightly shorter route to the City. It does not seem to have been intended to run through trains to the ex-Northern City branch from Edgware via Finchley Central. Seven trains an hour would have served the Alexandra Palace branch, to/from Moorgate via Highgate High-Level. In addition to the 14 through trains described, the ex-Northern City branch would have had 14 four-car shuttle trains an hour.

Progress of works

Work began in the late 1930s, and was in progress on all fronts by the outbreak of World War II. The tunnelling northwards from the original Highgate station had been completed, and the service to the rebuilt surface station at East Finchley started on 3 July 1939, but without the opening of the intermediate Highgate Station, at the site of the LNER's station of the same name. Further progress was disrupted by the start of the war, though enough had been made to complete the electrification of the High Barnet branch onwards from East Finchley over which tube services started on 14 April 1940; the new Highgate station opened on 19 January 1941. The single track LNER line to Edgware was electrified as far as Mill Hill East, including the Dollis Brook Viaduct, opening as a tube service on 18 May 1941 to serve the barracks there, thus forming the Northern line as it is today. The new depot at Aldenham had already been built and was used to build Halifax bombers. Work on the other elements of the plan was suspended late in 1939.
Work on the extension from Edgware to Bushey Heath including work on a viaduct and a tunnel started in June 1939, but was stopped after war broke out. After the war, the area beyond Edgware was made part of the Metropolitan Green Belt, largely preventing the anticipated residential development in the area, and the potential demand for services from Bushey Heath thus vanished. Passenger numbers also dropped on the then-BR's Mill Hill and Alexandra Palace branches, so it was useless to electrify them. Available funds were directed towards completing the eastern extension of the Central line instead, and the Northern Heights plan was dropped on 9 February 1954. Aldenham depot was converted into an overhaul facility for buses.
The implemented service from High Barnet branch gave good access both to the West End and the City. This appears to have undermined traffic on the Alexandra Palace branch, still run with steam haulage to Kings Cross via Finsbury Park, as Highgate was but a short bus ride away and car traffic was much lighter than it would become later. Consequently, the line from Finsbury Park to Muswell Hill and Alexandra Palace via the surface platforms at Highgate was closed altogether to passenger traffic in 1954. This contrasts with the decision to electrify the Epping-Ongar branch of the Central line, another remnant of the New Works programme, run as a tube-train shuttle from 1957. A local pressure group, the Muswell Hill Metro Group, campaigns to reopen this route as a light-rail service. So far there is no sign of movement on this issue: the route, now the Parkland Walk, is highly valued by walkers and cyclists, and suggestions in the 1990s that it could, in part, become a road were met with fierce opposition. Another pressure group has proposed using the track bed further north, as part of the North and West London Light Railway. The connection between Drayton Park and the surface platforms at Finsbury Park was opened in 1976, when the Northern City Line became part of British Rail.

1990s refurbishment and upgrade

By the early 1990s, the line had deteriorated due to years of under-investment and the use of old rolling stock, most of which dated back to the early 1960s. The line gained the nickname "Misery Line" due to its perceived unreliability. In 1995, a comprehensive refurbishment of the line began - including track replacement, power upgrades, station modernisation and the replacement of older rolling stock with new 1995 Stock thanks to a PPP deal with Alstom.

Recent developments

The Northern line was originally scheduled to switch to automatic train operation in 2012, using the same SelTrac S40 system as used since 2009 on the Jubilee line and for a number of years on the Docklands Light Railway. Originally the work was to follow on from the Jubilee line so as to benefit from the experience of installing it there, but that project was not completed until spring 2011. Work on the Northern line was contracted to be completed before the 2012 Olympics. It is now being undertaken in-house, and TfL predicted the upgrade would be complete by the end of 2014. The first section of the line was transferred to the new signalling system on 26 February 2013 and the line became fully automated on 1 June 2014 with the Chalk Farm to Edgware via Golders Green section being the last part of the line to switch to ATO.
In January 2018, Transport for London announced that it would double the period during which it runs peak evening services in the central London section to tackle overcrowding. There would now be 24 trains an hour on both central London branches and the northern branches, as well as 30 trains an hour on the Kennington to Morden section between 5pm and 7pm.

24-hour weekend service

Since the mid-autumn of 2016 a 24-hour "Night Tube" service has run on Friday and Saturday nights from Edgware and High Barnet to Morden via the Charing Cross branch; service is suspended on the Bank branch during these times. Trains run every 8 minutes between Morden and Camden Town and every 15/16 minutes between Camden Town and Edgware/High Barnet. Labour disputes delayed the planned start date of September 2015.

Services

Peak

As of 2015, morning peak southbound services are:
This gives 24 tph service on all parts of the Northern Line except between Kennington and Morden, where services run at 28 tph, and between Mill Hill East and Finchley Central.

Off-peak

As of 2015, off-peak services are the same as peak services, minus the four hourly trains that run from Morden to the northern branches via Charing Cross:
This gives a 20 tph service on all parts of the line except between Mill Hill East and Finchley Central.

Night

Since 2016, the Northern line has operated Night Tube service on Friday and Saturday nights between Morden and Edgware/High Barnet via Charing Cross. Trains run every 15 minutes on the northern branches, for four trains per hour, combining for a frequency of eight trains per hour between Camden Town and Morden. Service is suspended on the Bank branch and the Mill Hill East shuttle during Night Tube operations.

Stations

Open stations

High Barnet branch

Edgware branch

Camden Town

Charing Cross branch

Bank branch

Kennington

Main line

Closed stations

Permanently closed stations

Northern Heights stations not transferred from LNER
Bushey Extension stations not constructed

Rolling stock

When the line opened, it was served by 1906 Stock. These were replaced by 1938 stock as part of the New Works Programme, later supplemented with identical 1949 Stock. When the Piccadilly line was extended to Heathrow Airport in the 1970s, its 1959 Stock and 1956 Stock trains were transferred to the Northern line. As there were not enough 1956 and 1959 Stock trains to replace the Northern line's 1938 Stock fleet, they were supplemented with newly built 1972 Mark 1 Stock trains, which all served the line at the same time. A few 1972 Mark 2 stock trains also ran on this line until going to the Jubilee and now the Bakerloo where they remain in service. The few 1956 Stock trains were briefly replaced by 1962 Stock transferred from the Central line in 1995, before the entire Northern line fleet was replaced with 1995 Stock between 1997 and 1999.
Today, all Northern line trains consist of 1995 Stock in the Underground livery of red, white and blue. In common with the other deep-level lines, the trains are the smaller of the two loading gauges used on the system. 1995 stock has automated announcements and quick-close doors. If the [|proposed split] of the line takes place, 19 new trains will be added to the existing fleet of 106 trains, though additional trains beyond the extra 19 trains may be required to provide a full service for the new Battersea extension.

Tunnels

Although two other London Underground lines operate fully underground, the Northern line is unusual in that it is a deep-level tube line that serves the outer suburbs of South London yet there is only one station above ground while the rest of this part of the line is deep below ground. The short section to Morden depot is also above ground. This is partly because its southern extension into the outer suburbs was not done by taking over an existing surface line as was generally the case with routes like the Central, Jubilee and Piccadilly lines. Apart from the core central underground tunnels, part of the section between Hendon and Colindale is also underground. As bicycles are not allowed in tunnel sections as they would hinder evacuation, they are limited to High Barnet – East Finchley, the Mill Hill East branch, Edgware – Colindale and Hendon Central – Golders Green. There are also time-based restrictions for the sections where bicycles are allowed.
The tunnel from Morden to East Finchley via Bank, 17 miles 528 yards, was for a time the longest in the world. The Channel Tunnel linking the UK and France together is now longer.

Depots

The Northern line is serviced by four depots. The main one is at Golders Green, adjacent to Golders Green tube station, while the second, at Morden, is south of Morden tube station and is the larger of the two. The other two are at Edgware and Highgate. The Highgate depot is on the former LNER branch to Alexandra Palace. There was originally a depot at Stockwell but it closed in 1915. There are sidings at High Barnet for stabling trains overnight.

Future

Battersea extension

The Northern line is currently being extended to serve the redevelopment of Battersea Power Station. Partially funded by private developers, the £1.2bn project will extend the Charing Cross branch of the line for from Kennington to Battersea Power Station, with an intermediate stop at Nine Elms. Approved by Wandsworth Council in 2010, and Transport for London in 2014, the construction of the line began in 2015. Tunnelling for the project was completed in 2017, with the extension estimated to open in 2020.
Provision will be made for a future onward connection to Clapham Junction railway station by reserving a path running beneath Battersea Park.

Northern line split

TfL has long aspired to split the Northern line into two separate routes. Running trains between all combinations of branches and the two central sections, as at present, means only 24 trains an hour can run through each of the central sections at peak times, because merging trains have to wait for each other at the junctions at Camden Town and Kennington. Completely segregating the routes could allow 36 trains an hour on all parts of the line. TfL has already separated the Charing Cross and Bank branches during off-peak periods; however, four trains per hour still run to and from Morden via Charing Cross in the peak; the northern branches to Edgware and High Barnet cannot be separated until Camden Town station is upgraded to cope with the numbers of passengers changing trains.
In 2005 London Underground failed to secure planning permission for a comprehensive upgrade plan for Camden Town tube station that would have involved demolition of the existing station entrance and several other surface-level buildings, all within a conservation area. New plans were submitted in 2015, which avoid the existing station entrance and the conservation area by building a second entrance and interchange tunnels to the north, mostly on the site of a subsequently vacated Infant school. If the approval is given, the upgrading work is expected to begin in 2020 and complete in 2024.

Incidents and accidents

In October 2003, a train derailed at Camden Town. Although no one was hurt, points, signals and carriages were damaged. Concern was raised around the safety of the Tube, given the derailment at Chancery Lane earlier in 2003. A joint report by the Underground and its maintenance contractor Tube Lines concluded that poor track geometry was the main cause, and therefore extra friction arising out of striations on a newly installed set of points had allowed the leading wheel of the last carriage to climb the rail and derail. The track geometry at the derailment site is a very tight bend and tight tunnel bore, which precludes the normal solution for this sort of geometry of canting the track by raising the height of one rail relative to the other.
In August 2010, a defective rail grinding train caused disruption on the Charing Cross branch, after it travelled four miles in 13 minutes without a driver. The train was being towed to the depot after becoming faulty. At Archway station, the defective train became detached and ran driverless until coming to a stop at an incline near Warren Street station. This caused morning rush-hour services to be suspended on this branch. All passenger trains were diverted via the Bank branch, with several not stopping at stations until they were safely on the Bank branch.