Automatic train operation
Automatic train operation is an operational safety enhancement device used to help automate the operation of trains. The degree of automation is indicated by the Grade of Automation, up to GoA level 4. ATO is primarily used on automated guideway transit and rapid transit systems where it is easier to ensure the safety of humans. On most systems, there is a driver present to mitigate risks associated with failures or emergencies.
Many modern systems are linked with automatic train control and, in many cases, automatic train protection where normal signaller operations such as route setting and train regulation are carried out by the system. The ATO and ATC/ATP systems will work together to maintain a train within a defined tolerance of its timetable. The combined system will marginally adjust operating parameters such as the ratio of power to coast when moving and station dwell time in order to adhere to a defined timetable.
Types of train automation
According to the International Association of Public Transport, there are five Grades of Automation of trains:Grade of automation | Train operation | Description |
GoA 0 | On-sight | Similar to a tram running in street traffic |
GoA 1 | Manual | A train driver controls starting and stopping, operation of doors and handling of emergencies or sudden diversions. |
GoA 2 | Semi-automatic | Starting and stopping are automated, but a driver operates the doors, drives the train if needed and handles emergencies. Many ATO systems are GoA 2. |
GoA 3 | Driverless | Starting and stopping are automated, but a train attendant operates the doors and drives the train in case of emergencies. |
GoA 4 | Unattended train operation | Starting and stopping, operation of doors and handling of emergencies are all fully automated without any on-train staff. |
Operation of ATO
Whereas ATP is the safety system which ensures a safe spacing between trains and provides sufficient warning as to when to stop, ATO is the "non-safety" part of train operation related to station stops and starts, and indicates the stopping position for the train once the ATP has confirmed that the line is clear.The train approaches the station under clear signals, so it can do a normal run-in. When it reaches the first beacon – originally a looped cable, now usually a fixed transponder – a station brake command is received by the train. The on-board computer calculates the braking curve to enable it to stop at the correct point, and as the train runs in towards the platform, the curve is updated a number of times to ensure accuracy.
When the train has stopped, it verifies that its brakes are applied and checks that it has stopped within the door-enabling loops. These loops verify the position of the train relative to the platform and which side the doors should open. Once all this is complete, the ATO will open the doors. After a set time, predetermined or varied by the control centre as required, the ATO will close the doors and automatically restart the train if the door closed proving circuit is complete. Some systems have platform screen doors as well. ATO will also provide a signal for these to open once it has completed the on-board checking procedure. Although described here as an ATO function, door enabling at stations is often incorporated as part of the ATP equipment because it is regarded as a "vital" system and requires the same safety validation processes as ATP.
Once door operation is completed, ATO will accelerate the train to its cruising speed, allow it to coast to the next station brake command beacon and then brake into the next station, assuming no intervention by the ATP system.
Notable examples
Urban passenger railways
- The Victoria line of the London Underground opened in 1968 as the world's first full scale automatic railway and has since become the first to have an ATO system replaced. The Central, Northern, and Jubilee lines have also been upgraded to run with ATO. The Circle, District, Hammersmith & City and Metropolitan lines are currently being modernised with a brand new automatic train control system.
- The PATCO Speedline between Philadelphia, Pennsylvania and Lindenwold, New Jersey, opened its first segment in 1969 as the first ATO line in the United States.
- Bay Area Rapid Transit, opened in 1972, was the first new metro system with multiple lines built with ATO.
- The Montreal Metro Green, Orange and Blue lines have been using ATO since 1977.
- On the MTR Network in Hong Kong, all lines operated by MTR Corporation have run with ATO since 1979. The former KCR East Rail Line network has used ATO since 2002.
- The Glasgow Subway has used ATO since 1980.
- Many trains in Japan use some level of ATO. A notable example is the Yurikamome line in Tokyo, which is GoA 4.
- The French Véhicule Automatique Léger system, initially implemented on the Lille Metro in 1983, is a fully automated GoA 4 system. Its ATO system is also used with conventional heavy rolling stock on the Paris Métro Line 14, Line 1 and Lausanne Métro line 2.
- The Vancouver SkyTrain in Vancouver, British Columbia, is an automated and driverless system commissioned in 1985.
- On the Mass Rapid Transit, all lines operating currently run with ATO since 1987.
- All of the lines on the Docklands Light Railway in London have used ATO since it opened in 1987.
- On the Nuremberg U-Bahn, existing U2 and new U3 lines were converted to ATO in 2008, with one-year mix service.
- On the Barcelona Metro, the L9, L10 and L11 run with ATO.
- The Tren Urbano, which serves the San Juan metropolitan area, has a Siemens ATC system that allows for fully automatic operation.
- On the Milan Metro, the M1 Red Line and the M3 Yellow Line run with ATO.
- The Washington Metro is possibly the first system in the world to revert to manual operation from ATO, following a crash in 2009. However, GoA 2 is still installed on all lines and is planned to be used again in the future.
- The Prague Metro historically operated GoA 1 system ARS on all lines. GoA 2 is available on line C and line A. As of 2020, line B is transitioning from ARS to LZA. The projected line D should operate unattended.
- São Paulo Metrô, Line 4 was opened in 2010 as the first system operating GoA 4 in South America.
- On the New York City Subway, the BMT Canarsie Line began full ATO operation using CBTC in June 2012. IRT Flushing Line similarly underwent track and signal modernization, with full ATO operation beginning in November 2018.
- The trains on Dubai Metro don't have a driver, neither do the trains on AnsaldoBreda Driverless Metro and on Line C of the Rome Metro
- The trains on Doha Metro recently started operation, running automatically in ATO without a driver
- Aerotrain in Kuala Lumpur, Malaysia uses a GoA 4 ATO system.
- On the Los Angeles Metro system, the Red Line, Purple Line, and Green Line use the GoA 2 ATO system.
- Indonesia's capital city, Jakarta, recently introduced public transport that uses the ATO with GoA 2 Level.
- New South Wales's capital city Sydney in Australia, has the Sydney Metro which opened in 2019 and operates with GoA Level 4. Sydney is also in the process of upgrading older lines in the network to eventually enable GoA 2 and higher in the future.
Freight railways
- The Rio Tinto Group "AutoHaul" system on its iron ore railways in the Pilbara. This system is GoA 4 capable, able to run trains without a single person aboard for the entire trip out to the mines and back to the port. In October 2017 the first fully autonomous test took place over a section. The group was granted accreditation by Australia's Office of the National Rail Safety Regulator, approving the autonomous operation of iron ore trains in the Pilbara region of Western Australia.
- The Iron Ore Company of Canada uses nine automated GMD SW1200MG electric locomotives. This railroad is GoA4 capable, able to run trains without a single person aboard for the entire trip out to a processing plant and back to the mine in Labrador City.
- The Navajo Mine Railroad uses four remote-controlled GE E60 electric locomotives. This railroad is GoA2 capable, able to run a train without any person on board for the entire trip out to the Four Corners Generating Station and back to the mines.
Mainline operation
- The Czech railways have used GoA2 operation since 1991. Currently, about 400 vehicles are equipped with on-board units. 1500 km of lines are equipped with lineside part of ATO, next 1500 km are covered by data for GPS localisation.
- In the United Kingdom, the Thameslink core section through Central London between and became the first ATO route on the National Rail network in 2018.
High speed rails
- CR400BF-C 'Fuxing Hao', a variant of CR400 Fuxing series, running on Beijing–Zhangjiakou intercity railway is the world first high-speed rail service capable of driverless automation in commercial operations. The specific Grade of Automation was not announced.
Future
The U-Bahn in Vienna will be equipped with ATO in 2023 on the new U5 line.
All lines being built for the new Sydney Metro will feature driverless operation without any staff in attendance.
Since 2012, the Toronto subway has been undergoing signal upgrades in order to use ATO and ATC over the next decade. Work has been completed on the Yonge–University line, supplanting pointing and calling. Other lines, however, rely on the practice to ensure trains are correctly positioned at stations. The underground portion of Line 5 Eglinton will be equipped with ATC and ATO in 2022. The underground portion will use a GoA2 system while the Eglinton Maintenance and Storage Facility will use a GoA4 system and travel driverless around the yard. The Ontario Line is proposed have a GoA4 driverless system and will open in 2027.
ATO is in everyday operation on Czech Railways lines with :de:Allgemeiner Vertrag für die Verwendung von Güterwagen|AVV since 1991, and in test operation with ETCS since 2008.
Delhi Metro officials have stated that driverless trains with advanced features will run on the Botanical Garden – Kalkaji corridor, with trial runs planned for the last week of July 2016 and the trains being operated on the route from August 2016 onwards. Initially, drivers will be deputed to operate the trains but will be gradually withdrawn, said a metro official.