LNER Class ES1


Class ES1 was a class of two electric locomotives commissioned by the North Eastern Railway in 1902. They were of steeplecab design.
Both locomotives passed to the London and North Eastern Railway in 1923 and then to British Railways in 1948, but both were withdrawn before TOPS.

History

The North Eastern Railway was an enthusiastic and relatively early adopter of electric traction for railways. As part of a 1902 scheme to electrify the suburban railway networks in the Tyneside area, the NER's Chief Mechanical Engineer, Wilson Worsdell, also wished to electrify a, horseshoe-shaped freight line that went from Trafalgar Yard in Manors to Newcastle Quayside Yard. Passing through three tunnels, this line had gradients as steep as 1:27 and a number of sharp curves: it presented a formidable challenge for steam traction. Working conditions inside the tunnels were atrocious because the locomotives had to work exceptionally hard to manage the gradients which meant they produced vast quantities of choking fumes that could not disperse from the tunnels; the sparks they produced were a constant fire risk to the flammable packing materials in the yards. Electrification was the obvious answer.
The specification for new electric locomotives demanded that they be able to start a train of 150 tons on the steepest gradient, while on the level they were expected to be able to haul at. The end-to-end journey on the branch was to be completed in 4.5 minutes.
In 1900 General Electric and Thomson-Houston designed and built a locomotive of the steeplecab type for the Milan-Varese railway in Italy, electrified at 650 V DC using the third rail system. That railway opened in 1901, and the locomotive design proved successful. The North Eastern Railway's ES1s were derived from that American design, although they were designed from the start for both third rail and overhead operation: the Newcastle Quay branch used both systems—third rail in the tunnels, and overhead lines on the rest of the line.
A contract was signed with the British Thomson-Houston company on 15 December 1902, for delivery by the end of the following year. British Thomson-Houston sub-contracted the mechanical parts to Brush Electrical Engineering Co.
The electrified line was operational from 5 June 1905 and in the following year both locomotives performed exceptionally well. In 1906 they were fitted with electric heaters, the men having complained they were too cold on wintry mornings. A few years later, the bow collectors originally fitted on their bonnets were removed and a pantograph installed on the roof instead. With few other changes, they remained in operation until the line was de-electrified and they were replaced with diesel locomotives on 29 February 1964. The line was closed five years later.
Early photographs show the locomotives with "CLASS ELECTRIC 1" painted on the bufferbeams but this does not appear in official records. In common with other LNER electric locomotives, no classification was given to these locomotives until 4 October 1945, when nos. 1 & 2 were classified ES1. No. 1 exchanged numbers with class D3 steam locomotive no. 4075 on 30 September 1944, but after the steam locomotive was again renumbered, the electric locomotive was able to resume its original number on 24 October 1944. On 14 June 1946, nos. 1 & 2 were renumbered to 6480/1; and under British Railways, they became nos. 26500/1 in April 1948.

Preservation

From 1968 ES1 was transferred to Leicester Railway Museum. After that closed, in 1977 it was taken into the National Collection of the National Railway Museum, and is currently on display at Locomotion, Shildon.