In 1872, the standard gaugeBödelibahn railway opened from Därligen, on Lake Thun, to Interlaken, as Interlaken West station was then known. Two years later it was extended to Bönigen, on Lake Brienz, via a new station that was at first known as Interlaken Zollhaus. Initially this line was unconnected to the rest of the Swiss railway system, and merely served as a link between the steamships on both lakes. In 1893, the line reached Thun, with onward connections to Bern and beyond, eventually becoming part of the BLS. In 1890, the metre gaugeBerner Oberland railway opened, adopting Interlaken Zollhaus as the terminus of its route to the tourist destinations of Lauterbrunnen and Grindelwald. As a consequence, Interlaken Zollhaus became more important, and was renamed Interlaken Ost. At the same time the original Interlaken station became Interlaken West. Meanwhile, in 1888, the metre gauge Brünig railway had opened between Brienz, on Lake Brienz, and Alpnachstad, on Lake Lucerne, thus providing a through steamer and rail connection from Interlaken to Lucerne. By 1916 the Brünig railway had reached Interlaken Ost from Brienz, and, together an earlier extension at its eastern end, provided a through rail route to Lucerne. Standard gauge passenger service between Interlaken Ost and Bönigen ceased in 1969, although much of the line still exists in order to provide access to the BLS workshops as described above.
Operation
Layout
The station is notable in that although lines converge on it from three directions, it is the terminus of every passenger service which enters it. There are no through services due to incompatibilities in gauge and electrical systems. The Thunersee line is standard gauge while the BOB and Brünig tracks are metre gauge. Additionally, there are two electrical systems; 1500 V DC for the BOB services and 15 kV AC for all the rest. The platforms used by the Brünig line and BOB are terminal platforms and no metre gauge track exists west of the station. Whilst no standard gauge passenger trains now run to the east of the station, that section of the station is configured for through traffic, and the tracks continue for about to the east in order to provide access to the BLS workshops at Bönigen. None of the eightplatform tracks are dual-gauge or dual-system, from the south side of the station, where the station building is located, the first three platform tracks are used by the BOB, the next two by the Brünig line, and the final three by the Thunersee line.