Human Space Flight Centre
The Human Space Flight Centre is a body under Indian Space Research Organisation to coordinate Indian Human Spaceflight Programme. The agency will be responsible for implementation of the Gaganyaan project. The first crewed flight is planned for December 2021 on a home-grown GSLV-III rocket.
Before Gaganyaan mission announcement in August 2018, human spaceflight was not the priority for ISRO, though most of the required capability for it had been realised. ISRO has already developed most of the technologies for crewed flight and it performed a Crew Module Atmospheric Re-entry Experiment and a Pad Abort Test for the mission. The project will cost less than Rs. 10,000 crore. In December 2018, the government approved further 100 billion for a 7-days crewed flight of 3 astronauts to take place in December, 2021.
If completed on schedule, India will become world's fourth nation to conduct independent human spaceflight after the Soviet Union/Russia, United States and People's Republic of China. After conducting crewed spaceflights, the agency also intends to continue with efforts with a space station program and possibly a crewed lunar landing.
History
The trials for crewed space missions began in 2007 with the 600 kg Space Capsule Recovery Experiment, launched using the Polar Satellite Launch Vehicle rocket, and safely returned to earth 12 days later.Defence Food Research Laboratory has worked on the space food for crewed spaceflight and has been conducting trials on G-suit for astronauts as well. A prototype 'Advanced Crew Escape Suit' weighing 13 kg was built by Sure Safety Limited based on ISRO's requirements has been tested and performance verified.
On December 28, 2018, the Indian Union cabinet approved the funding for Indian Space Research Organisation's human spaceflight programme, under which a three-member crew will be sent to space for seven days and is expected to cost Rs 9,023 crore. The testing phase is expected to begin from December 2020 and the mission will be undertaken by 2022.
Spacecraft development
Flight type | Proposed month & year | Crew |
Test Flight 1 | 2020 - December | - |
Test Flight 2 | 2021 - July | - |
Crewed | 2021 - December | 3 |
The first phase of this programme is to develop and fly the 3.7-ton spaceship called Gaganyaan that will carry a 3-member crew to low Earth orbit and safely return to Earth after a mission duration of a few orbits to two days. The launch is planned for December 2021.
The extendable version of the spaceship will allow flights up to seven days, rendezvous and docking capability.
Enhancements in spacecraft will lead to development of a space habitat allowing spaceflight duration of 30–40 days at once in next phase. Further advances from experience will subsequently lead to development of a space station.
On October 7, 2016, Vikram Sarabhai Space Centre Director K. Sivan stated that ISRO was gearing up to conduct a critical 'crew bailout test' called ISRO Pad Abort Test to see how fast and effectively the crew module could be released safely in the event of an emergency. The tests were conducted successfully on 5 July 2018 at Satish Dhawan Space Centre, Sriharikota. This was the first test in a series of tests to qualify a crew escape system technology.
India will not use any animals for life support systems testing but robots resembling humans will be used. ISRO is targeting more than 99.8% reliability for its crew escape system.
As of August 2018, ISRO plans to launch its crewed orbiter Gaganyaan atop a Geosynchronous Satellite Launch Vehicle Mk III. About 16 minutes after lift-off, the rocket will inject the orbital vehicle into an orbit 300 to 400 km above Earth. The capsule would return for a splashdown in the Arabian Sea near the Gujarat coastline. As of May 2019, design of crew module has been completed. The spacecraft will be flown twice unmanned for validation before conducting actual human spaceflight.
Infrastructure development
Human-Rating of GSLV
Human-rating rates the system is capable of safely transporting humans. ISRO will be building and launching 2 missions to validate the human rating of the GSLV-MK III. Existing launch facilities will be upgraded to enable them to carry out launches under Indian Human Spaceflight campaign.Escape System
The escape system will boast of a recently included geometry. Work on parachute enlargement and new architecture are also going on.Astronaut training
Training for Gaganyaan programme
ISRO Chairman, K. Sivan, announced in January 2019 the creation of India's Human Space Flight Centre in Bangalore for training astronauts, also called vyomanauts. The centre will train the selected astronauts in rescue and recovery operations, operate in zero gravity environment, and monitoring of the radiation environment.In spring 2009 a full-scale mock-up of the crew capsule was built and delivered to Satish Dhawan Space Centre for training of astronauts. India will be short listing 200 Indian Air Force pilots for this purpose. The selection process would begin by the candidates having to complete an ISRO questionnaire, after which they would be subjected to physical and psychological analyses. Only 4 of the 200 applicants will be selected for the first space mission training. While two will fly, two shall act as reserve.
ISRO signed a memorandum of understanding in 2009 with the Indian Air Force's Institute of Aerospace Medicine to conduct preliminary research on psychological and physiological needs of crew and development of training facilities. ISRO is also discussing an agreement with Russia regarding some aspects of astronaut training.
Human Space Flight Centre and Glavcosmos, which is a subsidiary of the Russian state corporation Roscosmos, signed an agreement on July 1, 2019 for cooperation in the selection, support, medical examination and space training of Indian astronauts. An ISRO Technical Liaison Unit will be setup in Moscow to facilitate the development of some key technologies and establishment of special facilities which are essential to support life in space.
As of January 2020, 4 crews have been selected for the mission with astronaut training scheduled to begin in third week of January.
Planned facilities within India
An astronaut training facility will be established on proposed site of nearby Kempegowda International Airport in Devanahalli, Karnataka.Another such facility is proposed to be constructed in Challakere under a plan. It will be a facility spanning and will be the primary facility for astronaut training and other related activities. As of January 2020, it is planned to be completed in 3 years. Once completed, all activities related to the Indian Human Spaceflight Programme will be undertaken there.