ISRO Pad Abort Test


ISRO Pad Abort Test was an Indian Space Research Organisation launch escape system test of its crew module as part of Indian Human Spaceflight Programme. The successful test took place on 5 July 2018.
A Pad Abort Test is a trial run for the spacecraft's launch abort system. This system is designed to quickly get the crew and spacecraft away from the rocket in the event of a potential failure. It is similar to an ejection seat for a fighter pilot, but instead of ejecting the pilot out of the spacecraft, the entire spacecraft is "ejected" away from the launch vehicle. The technology developed is expected to be applied to the first Indian crewed spacecraft called Gaganyaan, scheduled to be launched in 2021.

Flight

The countdown for the test started at 2:00 am on 5 July 2018. At 7:00 am The Crew Escape System with crew module successfully lifted-off from Satish Dhawan Space Centre. The crew module was accelerated to 10 g and reached a highest altitude of, it later safely parachuted down and floated in the Bay of Bengal away from its launch site. It was carried skyward using seven solid-fueled rocket motors keeping within the safe g-force limits. Later recovery boats were sent to recover the crew module. The total duration of the test mission was 259 seconds. The test launch process was recorded by around 300 sensors. Main objectives of test were nominal 20 second ascent and 200 seconds of descent, not including the splashdown. Chute detachment was a scheduled event occurring around 259.4 seconds after launch as intended.
TimeEvent
T0 - 30 minutesGrid fins deployed
T0 - 8 secondsSeparation from launchpad
T0Ignition of High Altitude Escape Motor and Low Altitude Escape Motor
T0 + 0.9 secondsIgnition of Pitch Motor
T0 + 2 secondsBurnout of Pitch Motor
T0 + 5 secondsBurnout of High Altitude Escape Motor
T0 + 8 secondsBurnout of Low Altitude Escape Motor
T0 + 18 secondsCrew Escape System/Crew Module aft link separation
T0 + 20 secondsCrew Escape System/Crew Module separation, jettisoning motor ignition
T0 + 29 secondsParachute deployment
T0 + 265 secondsCrew Module Splashdown.