Ganatchio Trail


The Ganatchio Trail is a bike trail in Windsor, Ontario, the second to be built in the city. Construction on the trail started upon the closure of Clairview Avenue. The trail currently extends over 5.3 km, and passes through several neighbourhoods, such as Riverside and Little River, and serves Sandpoint Beach and Stop 26 Beach and Park. It was the first major trail constructed, aside from the Riverfront Bike Trail, with extensions east towards Tecumseh built in stages. The trail has a posted speed limit of 20 km/h. One feature found only on the Riverfront Bike Trail and the Ganatchio Trail is that the trail is wide enough for two "lanes" each way, meaning two bicycles can ride abreast in each direction without worrying about a collision.
The Ganatchio Trail and Little River Extension see a great deal of traffic in the summer, but nowhere near as much as the Riverfront Bike Trail. The Ganatchio Trail has special commemorative signs from its beginning to its end, along with a special roundabout/traffic circle where the Ganatchio intersects with the Little River Extension, with a commemorative sign depicting its length, map location, and a sign for the Lions Club International and Rotary International, who funded the trail's construction in 1996.
The Ganatchio Trail was built in 1971, incorporating much of Clairview Street, a narrow and rarely used residential street, into its route. The road was sealed off at some parts, and rerouted or truncated at other intersecting streets. The trail runs along Clairview in the parts that were left intact, but many intersecting streets, such as Watson Avenue, were closed off, allowing only pedestrians and cyclists to go through. Clairview Avenue was also a boulevard from Watson to Genevieve Avenue. Its second carriageway was transformed into the bike trail, and a few parts were converted entirely into greenways with the trail. Clairview Street also serves the Riverside Sportsman's Club. The remainder of the trail was built in 1979 and rehabilitated/upgraded in 1983.
The trail's name comes from the Native American/First Nations name for Lake St. Clair.

Upgrades

In May 2007, part of the Ganatchio Trail was relocated to travel just south of a parking lot at Sandpoint Beach. The trail then continues due west with a spur heading straight to meet the Little River Extension, while the main trail branches north again, towards the roundabout with the Little River Extension.
The Little River Extension trail, headed south, now runs through a tunnel under Wyandotte Street that was built in late 2007. The tunnel is well lit, but has the tendency to flood when it rains. A few more minor shifts in the trail have taken place between this bridge and Suicide Hill as well.

Recent talks of expansion

, Windsor City Council has been in talks with CN Rail and Hiram Walker Distillery on buying a spur line and converting the railroad tracks into a rail trail, for easy connection to the Riverfront Bike Trail in Downtown and the west end. This is boosted by the fact that the Via Rail train station downtown is old and over-crowded. The city even has several plans in the event of a relocation of railways:
The City of Windsor has expressed intentions of creating a bike trail, bike lane, and signed-route/Bike-Friendly Street "beltway" around Windsor, using pre-existing routes, lanes, and trails, and adding new ones to streets. The trail would use the Riverfront Bike Trail and Ganatchio Trail to the north, the West Windsor Recreationway to the west, and a new alignment following Cabana Road to the Devonwood Conservation Area. The Loop would also follow the current Devonwood Bike Trail, following along North Service Road and E.C. Row Expressway to the subdivision of Forest Glade, where it would turn north on Lauzon Road, and follow the current signed route and path along Hawthorne Drive, to the Little River Extension, before meeting back up with the Ganatchio Trail at the roundabout/traffic circle. This route has not been completed yet, but several segments are already in place. The loop has a couple crossings at E.C. Row interchanges, which are extremely busy, and could pose a potential safety hazard to cyclists. The city hopes to finish the Loop "within the next 20 years".