Götalandsbanan


Götalandsbanan is a planned high-speed railway planned to be built between Södertälje and Gothenburg in Sweden, past Linköping and Jönköping. The planned length is about. The speed is planned to be.
It will, if built, be used for passenger trains going between Gothenburg-Stockholm, Gothenburg-Borås, Malmö-Linköping-Stockholm, Linköping-Stockholm and more connections. The travel time Gothenburg-Stockholm is expected to be 2:00 to 2:15 compared to 2:45 to 3:00 today. The travel time Linköping-Stockholm would be cut by 40 min, Jönköping-Borås by 40 min and Gothenburg-Borås by 20 min. A more dense schedule is possible as well. It is also planned to have railway stations at the Göteborg Landvetter Airport and the Stockholm-Skavsta Airport. The disadvantage with the project is the big cost.

Current planning stage

The railway has a detailed plan between Gothenburg-Borås, and between Linköping-Södertälje. Detailed planning is being done between Borås-Linköping. It was announced in August 2012 that the Swedish government had decided to proceed with Ostlänken. The announcement also contained details of the proposed double-tracking upgrade between Mölnlycke and Bollebygd as part of the programme, though the announcement didn't say what has happened to the original plan to build a station on the presumably-discontinued section of high-speed line between Mölnlycke and Bollebygd serving Göteborg Landvetter Airport.
The railway is covered under Sverigeförhandlingen, a government negotiation process providing funding for high-speed rail projects in Sweden.

Gothenburg–Borås

The Gothenburg–Borås railway has been divided into three sections: Almedal–Mölnlycke, Mölnlycke–Bollebygd, and Bollebygd–Borås. The total cost of the project is expected to be 33 billion SEK at 2015 price levels.
, a strategic choice of measures study for the Borås–Linköping section is expected to be finished in early 2018. An advance copy of the study was released on 15 February 2017.
Europabanan, the high-speed line to Malmö, is planned to branch from Götalandsbanan in Jönköping. In Jönköping, the railway will pass south of the city centre, where a new station will be built.

Linköping–Södertälje (–Stockholm)

, an up to wide corridor, in which the East Link will run, has been selected. A railway plan is being drafted. Construction is expected to begin in November 2017, with the Kardon Line, a new freight line connecting Norrköping Harbour with the Southern Main Line, since the East Link will cut off the old connection. Full construction is expected to commence in 2021, with operation in 2033–2035.