Ferrocarriles Argentinos
Ferrocarriles Argentinos was a state-owned company that managed the entire Argentine railway system for nearly 45 years. It was formed in 1948 when all the private railway companies were nationalised during Juan Perón's first presidential term, and transformed into the Empresa de Ferrocarriles del Estado Argentino .
FA managed both, passenger and freight services, including long-distance and commuter rail trains in the metropolitan area of Buenos Aires.
The company was broken up under the government of Carlos Menem following the privatisation of the railways; however in 2015 the government of Cristina Kirchner revived the brand for use on state-owned railways.
Beginning
In April 1946 some British companies executives, such as Reginald Leeper and Wilfred Eady, representative of several railway companies in Argentina, started to make the arrangements for the sale of their companies to the Argentine state. A commission led by Eady arrived in Buenos Aires during the winter of 1946. The Argentine Government approved the creation of a joint company to operate British railways, reestablishing the tax exemptions that had been in force during Law n° 5,315, also named "Mitre Law".On December 17, 1946, a contract was signed by Miguel Miranda, president of Instituto Argentino de Promoción del Intercambio and the ambassador Wladimir D'Ormesson for the sale of French companies in Argentina at a global price of A$ 182,796,173. That included Compañía General de Buenos Aires, Province of Santa Fe and Rosario and Pto. Belgrano Railways.
Two weeks after the agreement signed with French companies, the Government made an offer of £ 125 million to British companies although the railways were finally acquired at £150 million. The acquisition would be paid by Argentina with exports of meat and cereal to Great Britain, which would transfer the money to the former owners of the rail companies. On March 1, 1948, the Argentine government led by president Juan Perón took over the British railways. The acquisition of the foreign railways was shown by the government as an act of sovereignty that would contribute to development of Argentine industry.
After the nationalisation, the Argentine network continued expansion until 1954, when it reached a peak of length, the most in its history. The Argentine network was also the biggest in Latin America.
Divisions
After the nationalisation all the Argentine network was grouped into six railway divisions named after distinguished Argentine presidents and national heroes according to their track gauge and locality. Apart from former British and French companies, Argentine ones also became part of "Ferrocarriles Argentinos", the state-owned company specifically created after the nationalisation to manage the entire railway network.The list of divisions that Ferrocarriles Argentinos was divided into was as follows:
Division | Provinces covered |
La Rioja, Catamarca, Córdoba, Tucumán, Formosa, Chaco, Santiago del Estero, Salta, Jujuy, Mendoza | |
Buenos Aires, Santa Fe, Córdoba, Sgo. del Estero, Tucumán | |
Buenos Aires, Santa Fe, Entre Ríos, Corrientes, Misiones | |
Buenos Aires, La Pampa, Río Negro, Neuquén, Chubut, Santa Cruz | |
Buenos Aires, Santa Fe, Córdoba, Mendoza, San Luis, San Juan | |
Buenos Aires, La Pampa, Córdoba, San Luis, Mendoza |
Reorganisation
After the nationalisation, the Midland and Compañía General rail lines became part of Belgrano Railway while the Province of Buenos Aires Railway was transferred to the state in December 1951, operating as an independent unit until 1953 when it was finally added to Belgrano network.On January 1, 1954, a new state-owned company, "Ferrocarril Nacional Provincia de Buenos Aires" was establishing, with the infrastructure and rolling stock from former French companies. The railway network formerly operated by Midland became "M" line, while the Compañía General line became "G" line.
On May 14, 1949, the Argentine state acquired the Buenos Aires Central Railway, owned by the Lacroze Brothers, adding it to the standard gauge General Urquiza Railway network. In 1954 the new General Urquiza railway terminus in Buenos Aires was inaugurated, naming it "Federico Lacroze". The narrow gauge "Ferrocarril Depietri" railway would be later added in November 1949.
Nevertheless, trains would be never run again on the line because the Provincial Railway did not show interest in the 68-km length line. The recently created Belgrano Railway did not take over the line. Therefore, the Argentine state returned the line to "Ferrocarriles y Elevadores Depietri" company. Depietri decided to bid the railway infrastructure as scrap. The state finally compensated Depietri for the deterioration of the line and the stolen material in 1975.
In Patagonia region there were only a bunch of rail lines built and managed by the state but not connect between. They were FC Viedma-Nahuel Huapi, Comodoro Rivadavia Railway, Puerto Deseado Railway, all of them of broad gauge. Other railways were of narrow gauge, such as La Trochita, Gral. Vintter to Gral. Conesa and Central Chubut Railway that connected Puerto Madryn with Playa Unión and Alto Las Plumas.
Those lines were managed by state-owned Ferrocarriles Patagónicos with the exception of Viedma-Bariloche and Jacobbacci-Esquel that had become part of General Roca Railway after nationalisation. The rest of the network would be added in 1956.
Likewise, other branches were closed, such as the 1,9-km length to Basilica of Our Lady of Luján, where thousand of pilgrims arrived each December 8. to celebrate Solemnity of the Virgin Mary. Services were cancelled in 1955 and the station demolished, while its tracks were lifted a year later. The Municipality of Luján built a park on the same land where the station stood.
Rolling stock improvement
National manufacturers impulse
At the moment of being nationalised, most part of Argentine railways' locomotives still were steam-powered and long-distance trips were in wooden coaches. It was not until the 1950s when the Government acquired brand new diesel locomotives produced in the United States, more specifically General Motors and Baldwin-Lima-Hamilton and Budd Company coaches that would be used in El Marplatense, an express service from Constitución to Mar del Plata with multiple luxury services.Despite the success of El Marplatense, FA did not acquired new material from Budd Co., being Dutch company Werkspoor the new locomotives and coaches supplier. The Werskpoor rolling stock was used for services to Mendoza, Córdoba and Tucumán.
During those years the first diesel locomotive manufactured in Argentina was launched in October 1951 by President Perón and its designer and builder, engineer Pedro Sacaggio. That locomotive started to run in the summer of 1952-53 serving in El Marplatense and completing the 400-km length in only 4 hours. The CM1 was also used for services to Bariloche and Mendoza at an average speed of 90 km/h.
The second model by FADEL was the CM2 La Argentina, powered with diesel engines by Italian manufacturers FIAT Ferroviaria and Cantieri Riuniti Dell Adriático. Nevertheless, the project to produce 600 locomotives was aborted by the Revolución Libertadora that took the Government in 1955. FADEL was subsequently closed and the plan of construction dismissed.
After the closure of FADEL, Ferrocarriles Argentinos committed a company the manufacturing of 280 locomotives that would be powered with the 280 engines that had been acquired to FIAT, originally intended to be used in the FADEL machines to built. The new manufacturer was a local Italian-Argentine consortium named "Gruppo Aziende Italiane e Argentine". The first 80 units and their engines were totally manufactured in Italy and the remaining 200 were built in Argentina between 1964 and 1970, using mostly national components. Despite the efforts to make a reliable locomotive for the Argentine railways, the GAIA machines did not satisfy the expectations and many units would be removed from circulations, remaining only a few locomotives serving at FA.
In 1958 Sociedad Material Ferroviario was established by Fiat Ferroviaria, through Fiat Concord, a consortium formed by many FIAT subsidiaries operating in Argentina. The company built a factory to manufacture rolling stock in the country to provide goods for FA.
That same year the Ministry of Transport of Argentina signed an agreement with Fiat Ferroviaria to acquire 210 brand-new railcars. Those machines were formed by 2 units powered by a FIAT diesel engine at 660 HP. The railcars could reach speeds of 115 km/h. Their low weight made them suitable to run on any railway line. The vehicles also had two driver cabins, one on each end of the car, which reduced the time of manoeuvres at termini stations, particularly in urban services.
Railcars were built in the FIAT factories of Turin, Decauville and Córdoba. Although the first railcars were manufactured in Italy and France, most of them were made in Argentina, in a factory specially designed for that assignment located in Ferreyra, Córdoba and named "Materfer". In 1962, the 7131, a railcar manufactured by FIAT Concord, made its debut in the Villa Ballester-Zárate and Victoria-Capilla del Señor sections of General Mitre Railway, then managed by Ferrocarriles Argentinos. Those light cars replaced Ganz Works railcars that had been run on those lines since 1938.
Materfer also produced coaches that looked like Werkspoor's that were used for long-distance services to Bariloche, Tucumán, Posadas, Mendoza with international connections with Chile and the Expreso del Sur.
Imported rolling stock
In 1955, 30 Werkspoor locomotives made in The Netherlands were acquired for the Belgrano Norte line. As a result, FA sent the old Ganz Works vehicles to Córdoba to serve regional railways. Four years later, a fleet of 21 English Electric locomotives arrived to replace Whitcomb and Werkspoor machines. In 1964, 27 coaches built by Aerfer, a subsidiary of FIAT Ferroviaria, were added to the line. Four years later, the fleet size was increased with the addition of 20 coaches built by local company Materfer, which replaced the old ones made in Tafí Viejo. Therefore, the English Electric locomotives worked with the Aerfer and Werkspoor coaches from then on.In 1962, the 7131, a railcar manufactured by FIAT Concord, made its debut in the Villa Ballester-Zárate and Victoria-Capilla del Señor sections of Mitre Railway. Those light cars replaced Ganz Works railcars that had been run on those lines since 1938.
Modernisation included the purchase of brand-new diesel locomotives by American company Whitcomb in 1951 for the Belgrano Sur line. In the late 1960s and early 1970s railcars by Hungarian company Ganz Works were sent to the Belgrano Sur. They had been acquired by the Argentine State Railway decades earlier and had been running in Northern Argentine railways since 1936. Some of them were used for local services to Libertad and the rest for the long-distance service to Carhué, departing from Buenos Aires station.
At the beginning of the 1960s, FA acquired brand new Hitachi electric multiple units, equipped with air conditioning for the metropolitan section of Mitre Railway.
Railway rationalisation: The Larkin Plan
By 1955 the reduction of the network was implemented through the so-called "Larkin Plan" several lines and branches were closed continuing during the presidency of Arturo Frondizi. As a result, by 1959 the operative railway network had decreased to 44,000 km. i.e. 4,000 km of tracks and at least 6 workshops were closed and 6,000 workers laid off. Tracks were lifted and lands and infrastructure sold. Some of the lines closed were the Belgrano Norte's Don Torcuato-Campo de Mayo branch and the B. Mitre-Delta.Although the Larkin Plan was not completely implemented due to a strike that lasted 42 days in 1961, a high number of lines and branches were closed such as the lines between Etcheverry and Mira Pampa and Carlos Beguerie to Azul and Olavarría, together with their respective branch lines, all of them part of Province of Buenos Aires Railway. About 200,000 workers gave their support to the strike on October 30, with several acts of riot along the country. The government committed workers to get back to work threatening them with being imprisoned. President Frondizi threatened that strikers could be judged by military courts.
De Marchi era: 1968–71
After the coup d'état that overthrew president Arturo Illia, General Juan Carlos De Marchi was named president of Ferrocarriles Argentinos. Marchi carried out a plan of modernisation and investments for the railway network that included to invest US$850 million within five years. During Marchi's administration the rolling stock was renewed, acquiring EMD GT22 and G22 diesel locomotives from the US and units by Materfer manufactured in Córdoba. The EMD locomotives have been running on several railway lines of Argentina until today, such as Belgrano Norte and Belgrano Sur metropolitan services, Roca and Mitre railways long-distance services among others. In 1968 De Marchi was elected secretary of the Latin America Railway Association. In the early 1970s, FA acquired 128 electric units to Japanese consortium Marubeni to be used in Urquiza Railway metropolitan services. The units ran for the first time in 1974, replacing old trams that had been used until then.Nevertheless, some railways were closed during those years, such as Ferrocarril Económico Correntino
Decline
By 1976, 3,000 km had been suppressed from the Argentine network, with a total extension of 41,400 km. That same year the military dictatorship led by Jorge Videla overthrew president Isabel Perón beginning the National Reorganization Process. During those years, other 6,300 km would be closed, apart from suppressing a 50% of passenger services and firing 40% of railway workers. 1,000 stations were closed over a total of 2,400. The railway network went from 41,400 km to 31,110 in 1980.Some of the railway lines during that period were Comodoro Rivadavia, Puerto Deseado and lines from Carlos Beguerie to Mira Pampa and Avellaneda to La Plata of Province of Buenos Aires railways.
After the rationalisation, the total extension of each railway division was as follows:
Division | Extension |
Sarmiento | 4,058 |
Mitre | 5,490 |
Roca | 6,827 |
San Martín | 4,523 |
Urquiza | 2,741 |
Belgrano | 10,474 |
The following democratic Raúl Alfonsín's administration keep the services active but the critical economic situation caused FA entered into recession. One of the achievements during Alfonsín's government was the electrification of Roca suburban branches from Constitución to Ezeiza and Glew. In addition, the entire fleet of trains was renewed, acquiring EMU by Japanese companies Nippon Sharyo, Kinki Sharyo, Tokyu Car, Kawasaki and Hitachi. The electrified rail system was opened to public in November, 1985. After being electrified, the number of passengers carried increased considerably.
Break-up and privatisation
Background
Following a prolonged period of hyperinflation in the 1980s, accompanied by a steep increase in fiscal deficit and a sharp fall in reserves, the Argentine government, under the presidency of Carlos Menem from 1989, initiated a series of neoliberal reforms which included the privatisation of public utility companies together with the entire railway network.The plan was to break up the network into segments and to grant concessions to private companies for their operation through competitive bidding. Freight and passenger services were separated and, since most of the intercity passenger services were not commercially attractive to the private sector, the government offered these to the provinces. The remaining passenger services in the city of Buenos Aires, including the five lines of the Metro, were potentially more viable and were treated separately.
Metropolitan services
By Decree n° 520/91, in 1991 a new state-owned company, Ferrocarriles Metropolitanos S.A. was create to operate metropolitan services in the city and suburbs of Buenos Aires Province until the privatisation process was carried out. Since then on, Ferrocarriles Argentinos only operated freight and passenger services until they were granted in concession to private companies.Projects not only included Buenos Aires but cities of Córdoba, Rosario and Mendoza with the idea of establishing urban services that included rapid transit transport. In the case of Córdoba, the plan foresaw to unify the two stations in the city and to connect Ferreyra and Argüello districts. The project for Mendoza foresaw to build a new terminal near the El Plumerillo Airport. Nevertheless, the plans were never carried out.
Freight trains
Privatisation began with the granting of long-term concessions to six companies for the operation of freight services. These companies were responsible for all operations and maintenance and for the implementation of the investment programme detailed in their bid. The fixed assets remained the property of the state and the operators had to pay for their use and to rent rolling stock. Freight tariffs were deregulated but were subject to state approval. The concessionaires were expected to hire as many FA employees as were required and redundancies were financed by the government with the help of the World Bank.Initially no bids were received for the Belgrano railway, and in October 1993 the government created a new state-owned corporation to continue its operation and to undertake improvements likely to make it a more attractive commercial proposition for a private buyer. Privatisation followed six years later when Belgrano Cargas took over the line.
Long-distance services closure
The only rail line catalogued as "profitable" was the Constitución-Mar del Plata section.On March 10, 1993, president Menem signed the decree for which all the long-distance passenger services were definitely closed. Some of the provinces that lost their connection with Buenos Aires were Salta, Jujuy, Entre Ríos, Corrientes, Misiones, Mendoza, San Juan, San Luis, Catamarca and La Rioja.
The closure caused many villages became isolated from the main cities of Argentina and younger inhabitants departed from their born towns looking for better opportunities. This happened in cities such as La Banda, Laguna Paiva, San Cristóbal, Navarro, Las Marianas among many others. While in 1960 trains had carried 539 million of passengers, thirty years after the number decreased to 264 million. Between 1991 and 1992 urban and inter-city services were cancelled due to lack of locomotives to run. In San Martín and Roca lines trains had only two coaches in poor conditions. In addition, railway unions made sudden strikes that left passengers abandoned midway. During the last year of state administration there were 239,000 services cancelled or delayed.
After the closure the National government offered the provinces to reactivate railway lines at their own expense. Provinces that reached an agreement with the central government to operate their services were Buenos Aires, Tucumán, Río Negro, Córdoba, La Pampa and Chubut. Likewise, the government also transferred some branches to the provinces, such as Viedma-Bariloche and Ingeniero Jacobbaci-Esquel to Río Negro and Chubut ; Córdoba-Cruz del Eje to Córdoba Province. Salta received the Tren a las Nubes and Mendoza took over Transandine Railway. In all the cases, the procedures were ruled by Law n° 2.873.
Winding-up
On July 7, 1995, the company was declared into a state of liquidation by decree n° 2394/92, ceasing operations that same day.After FA disappeared, the railway infrastructure of Argentina was taken over by a new agency, "Ente Nacional de Administración de Bienes Ferroviarios", then renamed "Organismo Nacional de Administración de Bienes del Estado" until 2008 when the "Administración de Infraestructuras Ferroviarias S.E." replaced ONABE as administrator. ADIFSE's headquarters set up in the former FA building in Avenida del Libertador and Av. Ramos Mejía in Retiro, Buenos Aires.