DMAIC


DMAIC refers to a data-driven improvement cycle used for improving, optimizing and stabilizing business processes and designs. The DMAIC improvement cycle is the core tool used to drive Six Sigma projects. However, DMAIC is not exclusive to Six Sigma and can be used as the framework for other improvement applications.

Steps

DMAIC is an abbreviation of the five improvement steps it comprises: Define, Measure, Analyze, Improve and Control. All of the DMAIC process steps are required and always proceed in the given order.

Define

The purpose of this step is to clearly pronounce the business problem, goal, potential resources, project scope and high-level project timeline. This information is typically captured within project charter document. Write down what you currently know. Seek to clarify facts, set objectives and form the project team. Define the following:
The purpose of this step is to measure the specification of problem/goal. This is a data collection step, the purpose of which is to establish process performance baselines. The performance metric baseline from the Measure phase will be compared to the performance metric at the conclusion of the project to determine objectively whether significant improvement has been made. The team decides on what should be measured and how to measure it. It is usual for teams to invest a lot of effort into assessing the suitability of the proposed measurement systems. Good data is at the heart of the DMAIC process.

Analyze

The purpose of this step is to identify, validate and select root cause for elimination. A large number of potential root causes of the project problem are identified via root cause analysis. The top 3-4 potential root causes are selected using multi-voting or other consensus tool for further validation. A data collection plan is created and data are collected to establish the relative contribution of each root causes to the project metric, Y. This process is repeated until "valid" root causes can be identified. Within Six Sigma, often complex analysis tools are used. However, it is acceptable to use basic tools if these are appropriate. Of the "validated" root causes, all or some can be.
The purpose of this step is to identify, test and implement a solution to the problem; in part or in whole. This depends on the situation. Identify creative solutions to eliminate the key root causes in order to fix and prevent process problems. Use brainstorming or techniques like Six Thinking Hats and Random Word. Some projects can utilize complex analysis tools like DOE, but try to focus on obvious solutions if these are apparent. However, the purpose of this step can also be to find solutions without implementing them.
The purpose of this step is to embed the changes and ensure sustainability, this is sometimes referred to as making the change 'stick'. Control is the final stage within the DMAIC improvement method. In this step; Amend ways of working; Quantify and sign-off benefits; Track improvement; Officially close the project; Gain approval to release resources.
This is additional to the standard DMAIC steps but it should be considered. Think about replicating the changes in other processes. Share your new knowledge within and outside of your organization. It is very important to always provide positive morale support to team members in an effort to maximize the effectiveness of DMAIC.
Replicating the improvements, sharing your success and thanking your team members helps build buy-in for future DMAIC or improvement initiatives.

Additional Steps

Some organizations add a Recognize step at the beginning, which is to recognize the right problem to work on, thus yielding an RDMAIC methodology.