British Rail Class 710


The British Rail Class 710 is a type of electric multiple unit passenger train currently being built by Bombardier Transportation for use on the London Overground network. The trains are part of Bombardier's Aventra family. The contract to provide 45 four-car trains was awarded in July 2015 and the trains were originally due to enter service in May 2018, although introduction was delayed until May 2019.

History

Background and specifications

In 2012, TfL announced its intention to procure a fleet of new, longer DMUs, as the units then in service were unable to handle the passenger demand, causing overcrowding throughout the day. TfL issued a tender for manufacturers to supply eight three- or four-car trains. However, this proposal was subsequently shelved when the Government announced that the Gospel Oak to Barking line would be electrified, with proposals instead to purchase a fleet of new EMUs.
TfL invited expressions of interest for a total of 39 four-car EMUs in April 2014, with 30 required for the Enfield Town, Cheshunt and Chingford to Liverpool Street routes, eight for the Gospel Oak to Barking, and one for the Romford to Upminster - all to replace older Class 172, Class 315 and Class 317 trains. Since then the planned procurement was increased to 45 four-car EMUs, with the additional six units intended for the Watford DC Line. The intention is that the five-car trains currently used on the Watford route will be cascaded back to the North London and East London Lines to allow for strengthened services. TfL issued an Invitation to Tender in early 2015, and in June 2015 announced that Bombardier had been awarded the contract to build the new trains.
In July 2015, TfL announced that it had placed a £260m order for 45 four-car Bombardier Aventra EMUs,. These are similar to the Class 345s that will be used by Crossrail, for use on the West Anglia Routes and the Watford DC Line, GOBLIN and Romford to Upminster lines, from 2018, to be known as Class 710. The units will be delivered in two sub-classes; an AC-only version for use on the West Anglia and Romford–Upminster services, and a dual-voltage version for the Watford DC and GOBLIN services. Both versions will have all-longitudinal seating after the plan to have some transverse seats on the AC units was dropped. The AC only version will be maintained at Ilford TMD and the dual-voltage units at Willesden TMD.
In 2017, Transport for London put forward a proposal to procure nine additional Class 710 units to be used as capacity enhancers. These would cover 42 of the 249 additional vehicle options, and would be formed into three 4-car sets, one which would be for use on DC lines and two for the extended GOBLIN to, and six 5-car sets for use on the North London Line and West London Line, allowing a cascade of Class 378 units to increase services on the East London Line.

Introduction

On 25 April 2018, the Islington Gazette reported that the trains would be introduced three months later than scheduled due to delays in their testing.
On 20 June 2018 the Barking & Dagenham Post reported that the trains would be in service by November 2018, "almost 18 months later than planned".
In November 2018, TfL said that they hoped the units would be in service by December 2018, however, further delays prevented this.
In January 2019, TfL announced that three Class 378 trains would temporarily be deployed on the Gospel Oak to Barking line while continued problems with the Class 710 units were resolved, since leases on the existing Class 172 stock running on this line would come to an end before the 710's likely introduction into passenger service.
In April 2019, the Office of Rail and Road approved the use of the Class 710, with restrictions.
On 22 May 2019 TfL announced that approval had been gained for the Class 710s to enter passenger service. The first two units entered service on the Gospel Oak to Barking Line on Thursday 23 May 2019 and the remaining six were in service by August 2019, with the first unit entering service on the Watford DC line on 9 September 2019. The first units on the Lea Valley lines entered service on 3 March 2020 after a first attempt on 24 February 2020. The services on the Romford-Upminster line will start in 2020.

Fleet details

A total of 54 units totalling 222 carriages are to be built. This will consist of 48 4-carriage units and six 5-carriage units.
ClassOperatorNo. BuiltYear BuiltCars per SetUnit Nos.Description
710/1London Overground312017-204710101 - 710131AC only for Romford–Upminster line and Lea Valley lines.
710/2London Overground182017-204710256 - 710273Dual-voltage for Gospel Oak to Barking line and Watford DC lines.
710/2London Overground62017-205710274 - 710279Dual-voltage for North London line and West London line.