Aditya (boat)
Aditya is a solar-powered ferry operating between Vaikkom and Thavanakkadavu in the Indian state of Kerala. The boat was inaugurated by Kerala Chief Minister Sri. Pinarayi Vijayan and Central Cabinet Minister for Power, Renewable Energy, Sri. Piyush Goyal on 12 January 2017.
It is India's first solar-powered ferry and the largest solar-powered boat in India. The vessel was designed and built by NavAlt Solar and Electric Boats in Kochi, India. NavAlt is a joint venture firm between Navgathi Marine Design and Constructions, Alternative Energies and EVE Systems.
Technical features
The 20-metre-long and 7-metre-wide boat is covered by of solar panels rated at 20 kW, which in turn connect to two electric motors of 20 kW, one in each hull. There are 700 kg of lithium-ion batteries in the ship's two hulls with a total capacity of 50 kWh. The catamaran hull and its shape allow it to reach speeds of up to 7.5 knots. This was verified by Indian Register of Shipping surveyor, Kerala Port surveyor and technical committee. The hull was designed based on extensive experience of Navgathi and AltEn and extensive computational fluid dynamics was done to determine its hydrodynamics. The boat is designed to be used as a passenger ferry to operate between Vaikom and Thavanakadavu.The normal operating speed is 5.5 knots to achieve a 15-minute travel time between Vaikom and Thavanakkadavu, a distance of 2.5 km on water. For achieving this speed, the power needed is about 16 kW. During manoeuvring, when leaving the jetty or approaching it, about 22 kW of power are needed. Hence, on an average about 20 kW power is needed. The total running time, neglecting the time in jetty for embarkation and disembarkation of passengers, is 5.5 hours on a sunny day.
Although the maximum power needed is a total of 22 kW during manoeuvring and 16 kW under cruise, more than double the power, a total of 40 kW, is provided in two motors of 20 kW each. The two systems on either side of the boat are electrically independent to ensure redundancy in case of system failure in one. Even if one system fails the power is available to safely cruise to shore with other. Also, unlike diesel engines, since efficiency does not drop with load, the electric motors can normally operate at 50% load and in emergencies at 100%.
For higher safety standards and reliability, the vessel is built under Indian Register of Shipping rules for inland vessels and operating conditions of the Vaikom – Thavanakkadavu route. The boat construction is complete and was tested by Technical committee, Indian Register of Shipping surveyor and Kerala Port surveyor on 16 November 2016, near in backwaters at Aroor. The boat is registered in Kodungallur Port under Kerala Ports.
The boat is remotely monitored and trouble shooting can also be done remotely. All the operating parameters of the boat are recorded and transmitted to the NavAlt Solar and Electric Boats server from where the technical experts can monitor the boat. The upgrades and settings in the software can also be performed remotely as if a computer is plugged on the boat. This makes the boat even more safe.
The project cost was US$370,000.
Awards
- Winner of the for the Best Electric Ferry in the World in memory of Gustave Trouvé.
- Efficient Solution Label as a profitable and eco-friendly solution.
- Listed in the Significant Small Ships in the World 2017, by , UK.
- FICCI Best R&D Project that can be scaled up 2017.
Safety features
- The boat is a catamaran and hence more stable than single hulled boats. The boat can safely carry 200 passengers and still meet the tough stability criteria of IMO sea-going ships.
- The propulsion battery is approved by DNV Class. These higher standards of safety are essential to ensure the risk of thermal runaway is minimal.
- The battery monitoring is on a cell level and hence risks are lower.
- There are three levels of safety warning - first being a warning that certain parameters are approaching the limit, second is the warning that limits have reached and hence need a slow down, and finally the warning that limits have breached upper limit and system need to shut down to protect it. The parameters include temperature of cells, motor, and many more.
- There are two independent power train that provides reliability and redundancy. A system fault in one power train does not affect the other since they are electrically independent. The boat satisfies the Indian Register of Shipping's safety requirement of being able to maintain cruise speed with one set of propulsion shut down.
Year 3 Statistics
- No. of Passengers - 10.6 Lakh
- Distance Travelled - 63,000 km
- Diesel saved - 1.05 Lakh litres
- Pollution avoided - 283 tonnes CO2, 3.9 tonnes NOx, 844 kg SOx, 106 kg Particulates
- OPEX savings - 75 Lakh rupees
Year 2 Statistics
- No. of Passengers - 6 Lakh
- Distance Travelled - 38,000 km
- Diesel saved - 58,000 litres
- OPEX savings - 45 Lakh rupees
Year 1 Statistics
- Propulsion energy per day for 22 trips – 72.8 kWh
- Propulsion energy per trip – 3.3 kWh
- Battery state of charge at end of day – 58%
- Grid charging cost per day – 2.6 US$
- OPEX savings - 25 Lakh rupees
Initial Days Operation
The first 150 days operation data shows that even rainy days during monsoon did not affect the schedule of the boat.- Propulsion energy per day for 22 trips – 73.7 kWh
- Propulsion energy per trip – 3.5 kWh
- Battery state of charge at end of day – 60%
- Grid charging cost per day – 2.5 US$
- Propulsion energy per day for 22 trips – 73.3 kWh
- Propulsion energy per trip – 3.33 kWh
- Battery state of charge at end of day – 65%
- Grid charging cost per day – 1.9 US$
Test and trials
- Optimisation Trials - to refine the settings in the internal software to ensure higher efficiency in the solar energy conversion and propulsion system, the tests was done on 13 and 14 November 2016 with the experts from France.
- Builders Trials - done on 15 November 2016, to ensure the systems was functioning as per specifications.
- IRS and Technical Committee Trials - done on 16 November 2016 to verify the operation, speed, safety of the boat. The maximum speed was noted as 7.4 knots @ 90% propulsive power. The power needed to move the boat at cruise speed of 5.5 knots was 15 kW. The boat was also tested for redundancy trials by shutting down one system and checked whether using one system the boat can still move at cruise speed of 5.5 knots. Other manoeuvring tests were also done.
- Client Trials - done on 25 November 2016, along with Transport Minister Sri. A. K. Saseendran, Aroor MLA Sri. A. M. Ariff, Vaikom MLA C. K. Asha. The performance was satisfactory for the dignitaries as well as the operators of the Kerala State Water Transport Department. The Transport Minister proclaimed that 14 more such ferries are planned this year.
- Site Trials - done at Vaikom to Thavanakkadavu route in presence of Technical committee, IRS and Kerala Port surveyor from morning to evening. As per the specifications, 22 trips was done with full load and it was satisfactory.
Tender specifications
A trip between the two boat points takes 15 minutes and it was estimated to need energy of 5 kWh. Hence a total of 22 trips would be made daily transporting 1,650 people daily, or 580,000 people every year without burning fuel.
Trips on average sunny day: 7:00 AM to 7:00 PM.
The below table describes the prediction for 22 trips in each column, and for each trip the start time and end time. It also list the break time at the end of each trip. In non-peak hours this is about 15 minutes, in peak time it is 10 minutes and around noon it is two hours. The energy from sun is cumulative at the end of the period and for an average sunny day it is about 72 kWh from 18 kW panels. The battery state of charge is shown at the beginning of trip and end of trip. At the end of the day, the battery has about 20% charge left. The energy use can be further optimised by adding one more trip so that end of day battery SOC can be 10%.
On a bright sunny day, the no. of trips can be increased by taking trips during 11:55 to 14:05 break. About four more trips can be made in this period.
On a cloudy day, the no. of trips is reduced and the break time is increased. If it is very cloudy in the break time, then shore charging can be done. This is a 32A charger and charges at 7 kW. Hence in the three hour break, it can charge battery by 21 kWh.
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | |
Vaikom | 7:00 | 7:45 | 8:00 | 8:40 | 8:50 | 9:30 | 9:40 | 10:25 | 10:40 | 11:25 | 13:35 | 14:20 | 14:35 | 15:20 | 15:35 | 16:20 | 16:30 | 17:10 | 17:20 | 18:00 | 18:15 | 19:00 |
Thavanakadavu | 7:15 | 7:30 | 8:15 | 8:25 | 9:05 | 9:15 | 9:55 | 10:10 | 10:55 | 11:10 | 13:50 | 14:05 | 14:50 | 15:05 | 15:50 | 16:05 | 16:45 | 16:55 | 17:35 | 17:45 | 18:30 | 18:45 |
Break | 0:15 | 0:15 | 0:10 | 0:10 | 0:10 | 0:10 | 0:15 | 0:15 | 0:15 | 2:10 | 0:15 | 0:15 | 0:15 | 0:15 | 0:15 | 0:10 | 0:10 | 0:10 | 0:10 | 0:15 | 0:15 | |
Total Time | 0:30 | 0:30 | 0:25 | 0:25 | 0:25 | 0:25 | 0:30 | 0:30 | 0:30 | 2:25 | 0:30 | 0:30 | 0:30 | 0:30 | 0:30 | 0:25 | 0:25 | 0:25 | 0:25 | 0:30 | 0:30 | 0:15 |
Battery SOC at start | 50 | 45 | 40 | 35.5 | 31.7 | 28.8 | 26.5 | 25.5 | 25.2 | 25.5 | 26.1 | 49.3 | 49.3 | 48.7 | 47.3 | 45 | 41.4 | 35.1 | 27.1 | 22.1 | 22.1 | 17.1 |
Sun Production | 0 | 0 | 0.5 | 1.7 | 3.8 | 6.5 | 10.5 | 15.2 | 20.5 | 26.1 | 54.3 | 59.3 | 63.7 | 67.3 | 70 | 71.4 | 72.1 | 72.1 | 72.1 | 72.1 | 72.1 | 72.1 |
Motor consumption | 5 | 10 | 15 | 20 | 25 | 30 | 35 | 40 | 45 | 50 | 55 | 60 | 65 | 70 | 75 | 80 | 85 | 90 | 95 | 100 | 105 | 110 |
Battery SOC at end | 45 | 40 | 35.2 | 31.1 | 27.9 | 25.3 | 23.4 | 22.8 | 22.8 | 23.3 | 24.1 | 46.8 | 46.6 | 45.6 | 43.8 | 40.9 | 36.9 | 32.1 | 27.1 | 22.1 | 17.1 | 12.1 |