The company's name was DNSW when it was founded in 2012 and derived from the route network, the diesel network southwest, whose cornerstones are the Rhineland-Palatinate cities of Mainz, Koblenz, Worms, Kaiserslautern and Idar-Oberstein as well as Saarbrücken in the Saarland and Frankfurt am Main in Hesse. On weekends in the summer season there is also a train pair to Wissembourg in Alsace. with a vlexx-train From the outset, the DNSW name was intended only as a temporary solution. In a name competition in January 2014, the public was able to participate in the naming process. In order to underline a regional reference of the company, a suitable name was sought. The choice fell on vlexx, der Vier-Länder-Express .
At the end of February 2012, the Regentalbahn was selected by the Zweckverband Schienenpersonennahverkehr Rheinland-Pfalz Süd as the winner of the Dieselnetz Südwest - Los 2 tender. Since the 2014/2015 regular timetable change on 14 December 2014, the company has been operating the Mainz-Alzey-Kirchheimbolanden, Frankfurt-Mainz-Bad Kreuznach-Idar-Oberstein-Saarbrücken, Mainz-Bad Kreuznach-Kaiserslautern and Mainz-Idar-Oberstein-Baumholder/Neubrücke lines for 22.5 years until June 2037. In December 2016, an additional Regional-Express line was introduced on the Kaiserslautern-Bad Kreuznach-Bingen-Koblenz route, which means that 6.4 million train-kilometres per year now have to be covered. The diesel network southwest contains non-electrified main and secondary railways in Rhineland-Palatinate and connects the Rhenish Hesse, Nahe, Western Palatinate and Saarland regions in particular with the Rhine-Main region and the centres of Mainz, Rüsselsheim am Main and Frankfurt am Main as well as Frankfurt Airport. A total of 63 LINT 54 and LINT 81 diesel railcars are used for train services. In the meantime, Regentalbahn founded DNSW, a subsidiary to which the provision of services was transferred. The DNSW was later renamed vlexx as part of a competition. The first new vlexx trains have been running since July 2014 on the future operating routes on a trial basis.
Problems during the start of operations
On 27 November 2014 it became known that vlexx did not have enough train drivers to operate all train services at the timetable change 2014/2015. The former operator of the train services, DB Regio, was therefore commissioned by vlexx to operate individual train services. When the operation started on 15 December 2014, there were massive train cancellations and, in some cases, delays lasting several hours. As a result, an emergency timetable was published on 17 December with which only about 50% of all train services were served. In addition, the managing directors were dismissed and replaced by Arnulf Schuchmann, the managing director of ODEG, which is also partly owned by Netinera. On 6 January 2015, the emergency timetable was extended in stages so that from 12 January about 90% of all train services could be served again. Since the beginning of March 2015, all contractually agreed connections have been served. This includes in particular the reactivated line between Heimbach and Baumholder, which was only served by a replacement bus. After Vlexx took over the last service from DB Regio on 1 July 2015 with a six-month delay, train cancellations occurred again due to a lack of personnel. This affected five connections that were taken over by DB Regio and Transregio during the summer holidays in Rhineland-Palatinate or were completely cancelled.
Tender of the E-Netz Saar
On January 9, 2017, the Ministry of Economy, Labour, Energy and Transport of the Saarland announced that vlexx had won Los 2 of the E-Netz Saar-RB, comprising 2.3 million train kilometers. The RB lines Saarbrücken-Neubrücke, Saarbrücken-Neunkirchen -Homburg and Homburg-Illingen will then be operated by the company. These are to be served by 21 Talent 3 electric railcars. The currently still non-electrified line from Saarbrücken to Lebach-Jabach is also included in the tender lot. This line will initially be operated with Desiro Classic diesel railcars, electrification is planned for 2024, and from then on Talent 3 electric railcars will also be operated there. As an alternative, the use of a battery electric multiple-unit train based on the Talent 3 is planned.
Network
Excursion trains
Contracting authorities and transport associations
The contracting authorities and transport associations of Vlexx for these services are: