The Veligonda Project is an irrigation project located in Markapur, Prakasam district in Andhra Pradesh, India. When completed, the project will provide irrigational facilities to 459,000 acres and drinking water to 1.5 million people in 29 Mandals of fluoride and drought affected areas in Prakasam district, Nellore district and Kadapa district by diverting 43.5 TMC of floodwater from the Krishna River from foreshore of Srisailam Reservoir near Kollamvagu and proposed to store in Nallamalasagar Reservoir.
The water for the project is drawn through two 18.8 km long tunnels across Nallamala hills. The project has been renamed to the 'Poola Subbaiah Irrigation Project'.
The construction includes two parallel tunnels of 18.8 km with 9.2 m and 7 m internal diameter and 21.6 km Flood flow canal for the water transmission system linking with Srisailam Reservoir up to Guntur-Kurnool road. The project is being implemented by a double shielded tunnel boring machine to make the tunnel without disturbing wildlife in the Nagarjunsagar-Srisailam Tiger Reserve.

Status

Forest clearance was pending for the Veligonda project and the N. Chandrababu Naidu government got the necessary permissions of environmental clearance from the Centre in August 2017. As of January 2020, 17.2 km of tunnel digging had been completed for the first tunnel, and 11.02 km for the second tunnel. The first tunnel is planned to be completed by August 2020.

Expected completion

Project construction was not satisfactory as planned in the first ten years by contractors citing equipment problems and payment issues with the government. Re-tendering of incomplete works is being done by terminating earlier contracts for both tunnels. Completion of first phase works are expected before June 2020.