VIII Corps Troops, Royal Engineers
VIII Corps Troops, Royal Engineers was a battalion-sized unit of Royal Engineers attached to the British Army's VIII Corps Headquarters in World War II. It served with 21st Army Group during the. It built the first British bridges across the Rhine and the Elbe after the assault crossings in March and April 1945 and continued in British Army of the Rhine after the end of the war.
Organisation
When VIII Corps Headquarters was re-established in Southern Command in June 1940, its Corps Troops Royal Engineers were provided by companies drawn from the Devon & Cornwall Fortress Engineers:- 570 Corps Field Park Company
- 571 Army Field Company
- 572 Army Field Company
- 573 Army Field Company
- 264 Field Company – joined from XII CTRE; part of the War Office Reserve
- 508 Field Park Company – joined from London defences
- 579 Army Field Company – joined from Hampshire CTRE
- 100 Field Company – joined from 77th Division ca January 1943
- 101 Field Company – joined from 77th Division ca January 1943
- 224 Field Company – joined from 48th Division March 1943
- 264 Field Company – transferred to 2nd GHQTRE July 1942
- 508 Field Park Company – left September 1942; returned February 1943; included a Light Aid Detachment of the Royal Electrical and Mechanical Engineers
- 579 Field Company – transferred to 1st Army TRE July 1942
- 752 Army Field Company – joined ca February 1941; left 13 December 1941
Normandy
VIII Corps was a follow-up formation after D Day, completing its concentration in Normandy on 26 June 1944. It then mounted a three-division attack west of Caen to seize a bridgehead over the River Odon. The divisional and corps engineers were employed largely on clearing minefields and rubble-blocked village roads. 15th Division succeeded in advancing a few thousand yards, and then defended the resulting salient against counter-attacks. After the battle ended on 1 July the sappers were involved in burying dead cattle strewn across the fields that constituted a health hazard. VIII Corps HQ was then shifted east of Caen to undertake an armoured assault. All available engineers were employed in clearing passages through minefields and developing routes so that the armour could move up and deploy. The attack was launched on 18 July and advanced some, but was halted by resolute German defence.In late July VIII Corps HQ was again sent west of Caen to command part of the southward thrust from Caumont through Bocage country during the breakout from the Normandy bridgehead. The main initial problem was German minefields. As 21st Army Group advanced rapidly over Northern France after the breakout, a large number of bridges were hastily erected. Operating on the right flank of XXX Corps' thrust towards Arnhem in Operation Market Garden, VIII Corps had to cross innumerable canals and rivers, which meant a heavy workload for all the engineer units. Later the bridges on the major lines of communication had to be replaced or strengthened, and new ones built. VIII Corps TRE built a noteworthy Class 70 bridge over the Seine at Mantes-Gassicourt.
Low Countries
After the failure of Market Garden, VIII Corps was given the task of clearing German forces from the west bank of the River Maas. This operation proceeded through November, with numerous waterways to cross, and the sappers laying miles of Sommerfeld Tracking and brushwood across the Peel marshes to enable vehicles to move forward. VIII Corps broke through the German second defence line covering Venlo on 22 November and on 3 December 15th Division captured Blerick, the last German bridgehead on the Maas.Rhine crossing
VIII Corps was not directly involved in the operations to clear the Reichswald in early 1945, nor was it scheduled to take part in the assault crossing of the Rhine, but the most direct route to the assault position crossed the Maas in VIII Corps' sector, so it was given responsibility for developing the necessary roads in the weeks beforehand. The corps was assigned a large number of RE units for these tasks, of which its own VIII CTRE was given the job of building a Class 9 Folding Boat Equipment bridge at Venlo.For the Rhine crossing, VIII CTRE was assigned to XII Corps. Under the command of Lieutenant-Colonel J.E. Marsh, the three field companies of VIII CTRE had the job of building a Class 9 FBE bridge codenamed 'Twist' opposite Wolfskath. The assault crossing on XII Corps' front by 15th Division began at 02.00 on 24 March, and by 09.00 10th Battalion Highland Light Infantry had cleared Wolfskath after bitter fighting. Lieutenant-Col Marsh called forward his first bridging vehicles at 06.00, but because of enemy fire they did not begin to arrive on site until 13.00. 'Twist' with its of approaches was opened for traffic 10 hours later – the first British-built bridge across the river. During the night of 24/25 March a traffic jam built up and broke the bridge, 22 bays being half-sunk and displaced downstream; however, it was repaired and reopened 13 hours later.
Germany
As VIII Corps advanced into Germany, VIII CTRE built three Class 40 Bailey bridges over the River Lippe to enable the troops of Ninth US Army to debouch from Wesel, and by 30 March VIII CTRE and 16th Airfield Construction Group RE had provided three more bridges on the main axes of advance. By 5 April the corps had advanced from the Rhine and 6th Airborne Division had secured two small bridgeheads over the River Weser. The divisional RE built a Class 9 FBE bridge during the morning of 6 April, and a company of VIII CTRE, assisted in the later stages by 3rd Parachute Squadron, RE, completed a Class 40 Bailey pontoon bridge shortly after midnight on 6/7 April. These bridges were of vital importance, because 11th Armoured Division's bridging efforts further north were abandoned after accurate bombing raids and shellfire. Eventually 15th Division's RE widened the bridgehead to the south by building another bridge with the help of VIII CTRE.On 21 April the leading troops of VIII Corps reached the River Elbe: during the advance from the Weser the RE under this corps had to build over 30 major bridges and strengthen another dozen, while the dumps of bridging supplies were still back on the other side of the Rhine. Crossing the Elbe, however, was a bigger proposition, requiring planning and the collection of engineering stores. Field Marshal Bernard Montgomery decided that VIII Corps would again provide the crossing for XII Corps, with 15th Division making the assault crossing. VIII CTRE would support the operation by building a Class 9 FBE bridge across to Lauenburg, as well as maintaining a DUKW ferry and providing booms to protect the bridges. H Hour for the assault was 02.00 on 29 April, but there was considerable congestion in the streets of Artlenburg, and it was not until 08.30–10.00 that the RE parties were able to begin work. From 11.00 enemy shelling of the bridging sites became accurate and intense, and there were frequent attacks by enemy aircraft. VIII CTRE suffered badly during one attack by low-flying jet aircraft at 13.15, losing eight killed and 22 wounded. Bomb craters in the bridge approaches caused further delay, but the FBE bridge was opened at 20.15, only a quarter of an hour later than scheduled. The following day the Luftwaffe continued its attempts to destroy the bridges, but RAF jet fighters were now providing air cover. The Germans also sent frogmen in an unsuccessful attempt to sabotage the bridges, one of whom was captured by VIII CTRE.
XII Corps passed through the bridgehead provided by VIII Corps and continued the advance against collapsing opposition, but on 4 May came the German surrender at Lüneburg Heath. This did not end the work for the sappers: for many months they were engaged in repair and restoration of essential services behind the armies and in the occupied zone of Germany.
Postwar
In August 1946, VIII CTRE was merged with 43rd Divisional Engineers to form 29th Army Troops Royal Engineers in British Army of the Rhine, with the following organisation:- 562 Field Company – from 100 Field Company
- 563 Field Park Company – from 207 Field Park Company
- 564 Field Company – from 101 Field Company
- 565 Field Company – from 204 Field Company