Urengoy–Pomary–Uzhhorod pipeline


The Urengoy–Pomary–Uzhhorod pipeline is one of Russia's main natural gas export pipelines, partially owned and operated by Ukraine.

History

The pipeline project was proposed in 1978 as an export pipeline from Yamburg gas field, but was later changed to the pipeline from Urengoy field, which was already in use. In July 1981, a consortium of German banks, led by Deutsche Bank, and the AKA Ausfuhrkredit GmbH agreed to provide 3.4 billion Deutsche Mark in credits for the compressor stations. Later finance agreements were negotiated with a group of French banks and the Japan Export-Import Bank. In 1981-1982, contracts were signed with compressors and pipes suppliers Creusot-Loire, John Brown Engineering, Nuovo Pignone, AEG-Telefunken, Mannesmann, Dresser Industries, and Japan Steel Works. Pipe-layers were bought from Caterpillar Inc. and Komatsu.
The pipeline was constructed in 1982-1984. It complemented the transcontinental gas transportation system Western Siberia-Western Europe which existed since 1973. The official inauguration ceremony took place in France.
On 19 July 2011, UkrTransGaz started modernization of the pipeline.

Route

The pipeline runs from Siberia's Urengoy gas field through compressor plants in Pomar, Mari El to Uzhhorod in Western Ukraine. From there, the natural gas is transported to Central and Western European countries. Together with Soyuz and Progres pipelines it forms the western transit corridor in Ukraine. It crosses the Russian–Ukrainian border north of Sumy. In Ukraine, it takes gas to the Uzhhorod pumping station on the Ukrainian border with Slovakia and to smaller pumping stations on the Hungarian and Romanian borders. The pipeline crossed the Ural Carpathian mountains and more than 600 rivers including Ob, Volga, Don and Dnepr rivers.

Technical features

The pipeline is long, of which is in Ukraine. Its diameter is. The original annual capacity of the pipeline was of natural gas per year. By 2009, the factual annual capacity was. It has 42 compressor stations, of which nine are in Ukraine.
The telecommunications and cathodic protection systems of the pipeline were installed by Alcatel of France. The pipeline utilizes 85 dual CCTV stations for telecommunications.

Operators

The Russian section of this pipeline is operated by Gazprom and the Ukrainian section is operated by UkrTransGaz.

Controversies

Disagreement among the allies

The Soviet plans to build the pipeline were strongly opposed by the Reagan administration. Americans were afraid that Western Europe would become dependent on the Soviet gas supplies, giving an energy leverage to the Soviet Union. They also feared the Kremlin would use the export revenue for military purposes. In December 1981, the US implemented sanctions preventing American companies from exporting oil and gas technologies - necessary for the pipeline construction - to the Soviet Union. In June 1982, these sanctions were expanded to cover subsidiaries of US companies in Europe.
Washington's Western European allies, however, refused to boycott the pipeline. The foreign ministers of the European Economic Community called extension of the American sanctions illegal and sent a formal note of protest. From the European perspective, participation in the pipeline project was seen as an opportunity for the depressed steel and engineering industry in Europe and as a way to diversify from the OPEC oil supplies. Therefore Western European governments insisted that contracts already signed between the Soviets and European companies needed to be honored. This led to several European companies being sanctioned by the US. Reagan reportedly said: "Well, they can have their damned pipeline. But not with American equipment and not with American technology." The efforts by the US to prevent the construction of the pipeline, and its export embargo of supplies needed to build it, constituted one of the most severe transatlantic crises of the Cold War.

Forced labor

The construction of the pipeline was also subject to a United States Congressional hearing investigating the use of imported Vietnamese labor from re-education camps to build the pipeline.

Accidents

The pipeline's first accident occurred even before the project began. On 15 December 1983, a fire broke out at a compressor station in Urengoy, destroying electronic monitoring devices and control panels, but no one was injured.
On 7 May 2007, the pipeline exploded near the village of Luka, Tarashcha Raion of Kiev Oblast, damaging a section. Another explosion happened on 6 December 2007 near the village of Tiahun.
A terrorist explosion damaged the pipeline in Rozhniativ district in Ivano-Frankivsk Oblast in May 2014. According to the Russian government owned radio station Voice of Russia terrorist threats against the pipeline were made by Right Sector leader Dmytro Yarosh in March 2014. Another section of the pipeline exploded in the Poltava region on June 17, 2014, one day after Russia limited the supply of gas to Ukrainian customers due to non-payment. Ukraine's Interior Minister Arsen Avakov said the next day, that the explosion had been caused by a bomb.