Type 45 destroyer


The Type 45 destroyer, also known as the D or Daring class, is a class of six guided missile destroyers built for the United Kingdom's Royal Navy. The class is primarily designed for anti-aircraft and anti-missile warfare and is built around the PAAMS air-defence system utilizing the SAMPSON AESA and the S1850M long-range radars. The first three destroyers were assembled by BAE Systems Surface Fleet Solutions from partially prefabricated "blocks" built at different shipyards; the remaining three were built by BAE Systems Maritime – Naval Ships. The first ship in the Daring class, HMS Daring, was launched on 1 February 2006 and commissioned on 23 July 2009.
The Type 45 destroyers were built to replace the Type 42 destroyers that had served during the Falklands War, with the last Type 42 being decommissioned in 2013. The National Audit Office reported that, during an "intensive attack", a single Type 45 could simultaneously track, engage and destroy more targets than five Type 42 destroyers operating together. After the launch of Daring on 1 February 2006 Admiral Sir Alan West, a former First Sea Lord, stated that it would be the Royal Navy's most capable destroyer ever, as well as the world's best air-defence ship. The reduction in the number to be procured from twelve, then to eight, finally with only six confirmed was controversial.
In 2016 it was revealed that due to a design flaw on the Northrop Grumman intercooler which, when attached to the Rolls-Royce WR-21 gas turbines and functioning in the warm climate of the Persian Gulf, power availability was diminished considerably; and it quickly became apparent that the class was not operating as originally envisioned. A refit will take place from 2019-21 to fully resolve the problems with the six ships in the class.

Development

The UK had sought to procure a new class of air-defence guided missile destroyers in collaboration with seven other NATO nations under the NFR-90 project; the project collapsed due to varying requirements of the different countries involved. The UK then joined France and Italy in the programme; however, differing national requirements, workshare arguments and delays led to the UK withdrawing on 26 April 1999 and starting its own national project. On 23 November 1999 Marconi Electronic Systems was confirmed as prime contractor for the Type 45 project. Seven days later MES and British Aerospace merged to form BAE Systems, making the latter the prime contractor.
The Type 45 project has been criticised for rising costs and delays, with the six ships costing £6.46 billion, an increase of £1.5 billion on the original budget. The first ship entered service in 2010, rather than 2007 as initially planned. In 2007, the Defence Select Committee expressed its disappointment that the Ministry of Defence and BAE had failed to control rising costs.

Construction

The Type 45 destroyers take advantage of some Horizon development work and use the Sea Viper air-defence system and the SAMPSON radar. The ships are built by BAE Systems Maritime – Naval Ships, originally created as BVT Surface Fleet by the merger of the surface shipbuilding arms of BAE Systems and VT Group. These two companies previously built the ships in collaboration. BAE's two Glasgow shipyards and single Portsmouth shipyard are responsible for different "blocks". BAE's Govan yard is responsible for Block A. The Scotstoun yard builds Blocks B/C and Block D. BAE's Portsmouth shipyard is responsible for Blocks E/F and the funnels and masts. For ships 2 to 6 blocks A-D were assembled in the Ships Block and Outfit Hall of the Govan shipyard, and taken fully outfitted to the Scotstoun berth. The masts and funnels were also fitted before launch.
.
For the first-of-class, Block A was assembled at Govan and moved to Scotstoun, where it was mated to Block B/C, which was already fitted with the WR-21 turbines and machinery. Block D, also assembled at Scotstoun, was fitted to these three blocks. The bow sections were mated at Portsmouth and taken by barge to Scotstoun. These were the final blocks to be attached. At this point the hull was launched into the Clyde and towed to the Scotstoun Dry Dock where the masts and funnels were fitted. Once this is complete, the remaining equipment is fitted: radar arrays, bow-mounted sonar, propellers, missile equipment and 4.5-inch gun.
This modular construction arrangement was agreed in February 2002. However, when the original contract for three ships was signed in July 2000, BAE Systems Marine was to build the first and third ships, and Vosper Thornycroft was to build the second.
By the end of 2010, all six Type 45 destroyers had been launched, with the first two in commission and the remainder fitting out. By 2012, all destroyers were structurally complete and the production lines had been closed., the last of the Type 45 destroyers, was commissioned at Portsmouth Naval Base on 26 September 2013, and entered service in 2014 after trials and training.
The Daring class are the largest escorts ever built for the Royal Navy in terms of displacement.
In 2009 delivery of the ships' Aster missiles was delayed due to a manufacturing fault with a single batch of missiles identified during testing.

Characteristics

General specifications

The Type 45 destroyers are in length, with a beam of, a draught of and a displacement of approximately. This makes them significantly larger than the Type 42 they replace. The Type 45 destroyers are the first British warships built to meet the Lloyd's Register's Naval Ship Rules for hull structure requiring design approval by Lloyd's Register for the principal structural arrangements of the vessel. BAE Systems is the Design Authority for the Type 45, a role traditionally held by the UK Ministry of Defence. The design of the Type 45 brings new levels of radar signature reduction to the Royal Navy. Deck equipment and life rafts are concealed behind the ship's superstructure panels, producing a very "clean" superstructure, somewhat similar to that of the French s. The mast is also sparingly equipped externally. Speculation by the press suggests that this design gives the ship the radar cross-section of a small fishing boat.
The Daring class is notable for being the first Royal Navy vessels to include gender-neutral living spaces to accommodate male and female crew members; communal shower and heads facilities have given way to individual cubicles, and six-person berths for junior ratings are far more flexible in accommodating a mixture of male and female sailors. Men and women will continue to sleep in separate spaces, in common with most other navies.

Propulsion and power

The Type 45 is fitted with an advanced and innovative integrated electric propulsion system. Historically, electric-drive ships have supplied power to their electric motors using DC, and ship's electrical load, where necessary at all, was either separately supplied or was supplied as DC with a large range of acceptable voltage. Integrated electric propulsion seeks to supply all propulsion and ship's electrical load using alternating current at a high quality of voltage and frequency. This is achieved by computerised control, high quality transformation, and electrical filtering. Two Rolls-Royce WR-21 gas turbines drive GE alternators and along with two Wärtsilä 12V200 diesel generators provide electrical power at 4,160 volts to a GE high voltage system. The high voltage supply is then used to provide power to two GE Power Conversion advanced induction motors with outputs of each. Ship's services, including hotel load and weapons system power supplies, are supplied via transformers from the high voltage supply at 440 V and 115 V. The benefits of integrated electric propulsion are cited as:
The key to the efficient use of a single prime mover is the choice of a gas turbine that provides efficiency over a large load range; the WR-21 gas turbine incorporates compressor intercooling and exhaust heat recovery, making it significantly more efficient than previous marine gas turbines, especially at low and medium load. The combination of greater efficiency and high fuel capacity gives an endurance of at. High power density and the hydrodynamic efficiency of a longer hull form allow high speeds to be sustained. It has been reported that Daring reached her design speed of in 70 seconds and achieved a speed of in 120 seconds during sea trials in August 2007.

Engine trouble

In January 2016, the Ministry of Defence acknowledged that the Northrop Grumman intercooler in the propulsion system was unreliable. A staggered refit was also announced, which will involve cutting into the ship's hulls and fitting additional diesel generation capacity. On occasion there have been near-complete power generation failures, temporarily disabling propulsion, power generation for weapons, navigational systems and other purposes, leaving the ships vulnerable to "total electric failure".
In June 2016, defence chiefs stated that the Northrop Grumman intercooler could not cope with the warm waters of the Gulf. The manufacturers, Rolls-Royce, said that while the engines for the WR-21 had been built as specified by the Ministry of Defence, the conditions in the Middle East were not "in line with the specs of the intercooler". The First Sea Lord, Admiral Philip Jones, clarified that the "WR-21 gas turbines were designed in extreme hot weather conditions to what we call "gracefully degrade" in their performance, until you get to the point where it goes beyond the temperature at which they would operate... we found that the resilience of the diesel generators and the WR-21 in the ship at the moment was not degrading gracefully; it was degrading catastrophically, so that is what we have had to address".
While the Ministry of Defence does not release detailed information related to the number of problems experienced by the class, including total engine failure, several such occasions have been reported in the media. Daring broke down in November 2010 and April 2012, Dauntless in February 2014 and Duncan in November 2016.
On 23 November 2017, The Register, a British technology news and opinion website, quoting The Times, reported that a Type 45 destroyer had been recalled to Britain with propeller problems, leaving the Royal Navy's traditional "east of Suez" deployment without proper warship cover. It was stated that "HMS Diamond is on her way back to the UK after a propeller problem proved too much for the ship's crew to repair on their own. The problem is not linked to the Type 45's notoriously unreliable WR-21 engines. Rumours have swirled that Diamond is a testbed for an interim fix before a proper solution is rolled out in 2019... the withdrawal of Diamond from her planned nine-month deployment leaves naval planners in a very difficult situation. While the RN does have a permanent presence in the Middle East, at the moment it is down to four minesweepers and their lightly armed support ship."
On 21 March 2018, it was announced that each ship would have their two diesel engines replaced by three new ones at Cammell Laird in Birkenhead as part of the "Power Improvement Project".

Advanced air-defence

The Type 45 destroyers are primarily designed for anti-air warfare with the capability to defend against targets such as fighter aircraft and drones as well as highly maneuverable sea skimming anti-ship missiles travelling at supersonic speeds. The Royal Navy describes the destroyers' mission as being "to shield the Fleet from air attack".
aboard HMS Daring
The Type 45 destroyer is equipped with the Sea Viper air-defence system utilizing the SAMPSON active electronically scanned array multi-function radar and the S1850M long-range radar. PAAMS is able to track over 2,000 targets and simultaneously control and coordinate multiple missiles in the air at once, allowing a large number of tracks to be intercepted and destroyed at any given time. This makes it particularly difficult to swamp PAAMS during a saturation attack, even if the attacking elements are supersonic. The US Naval War College has suggested that the SAMPSON radar is capable of tracking 1,000 objects the size of a cricket ball travelling at three times the speed of sound, emphasising the system's capabilities against high performance stealth targets.
on Daring
A core component of PAAMS is the Aster missile, comprising Aster 15 and Aster 30. MBDA describe Aster as a "hit-to-kill" anti-missile missile capable of intercepting all types of high performance air threats at a maximum range of 120 km. The Aster missile is autonomously guided and equipped with an active RF seeker enabling it to cope with "saturated attacks" thanks to a "multiple engagement capability" and a "high rate of fire". Presently the Daring-class destroyers are equipped with a 48-cell A50 Sylver Vertical Launching System allowing for a mix of up to 48 Aster 15 and 30 missiles.
In addition to its anti-air warfare role, PAAMS offers additional ballistic missile defence capabilities. In March 2013 the United States Naval Institute reported that the Royal Navy along with the United States Missile Defense Agency will explore the potential of the Daring class to provide ballistic missile defence in Europe along with United States Navy Aegis equipped destroyers. In May 2014, it was reported by Jane's Information Group that the United Kingdom is committing more funds to explore the capabilities of the SAMPSON multi-function radar and the Type 45 destroyer in a ballistic missile defence role. This followed a successful live firing event hundreds of miles north of Kwajalein Atoll in the Western Pacific Ocean, where Daring demonstrated the ability to "detect at the earliest opportunity" and track "through to intercept" two medium-range ballistic missiles. BAE systems reportedly told Jane's that the SAMPSON multi-function radar "exceeded expectations in all respects". An "Experiment Concurrency and Cueing " event for the Type 45 was planned for late 2015.
Because of the marked increase in capabilities delivered by the Type 45 destroyers in relation to their predecessors, the exceptionally high price per ship, and the large amount of public attention they have attracted, defence analysts and correspondents commonly refer to the Daring class as being the "most advanced" or "most powerful" air-defence destroyers in the world. Likewise, the ships' builders BAE Systems claim: "Able to detect and track hundreds of targets simultaneously, the Type 45 Destroyer is recognised as the most advanced anti-air warfare vessel in the world." Nick Brown, the editor-in-chief of Jane's International Defence Review, was quoted by The Huffington Post saying, "It's certainly one of the most advanced air defence ships in the world... The US Aegis system is similar, but Sea Viper is more advanced."

Weapons, countermeasures, capabilities and sensors

Anti-air warfare

The Sea Viper air-defence system:
A 48-cell A50 Sylver Vertical Launching System for a mix of up to 48:
The Type 45 does not have a formal theatre ballistic missile defence capability but its potential for such a role is being assessed. Land-based Aster 30 Block 1 missiles have intercepted short-range ballistic missiles and trials of a land-based SAMPSON modified for BMD were planned for early 2012. The Ministry of Defence announced in 2013 that the first ship, Daring, would take part in ballistic defence trials with the US Missile Defence Agency as part of a major research and development programme. In March 2016 Britain and France announced a joint procurement programme with the intention of France acquiring Brimstone missiles to equip the Tiger Mk3 helicopter and Britain acquiring Aster Block 1NT missiles capable of intercepting medium range ballistic missiles of range. A block 2 version of the Aster 30 NT is under development by France and Italy capable of intercepting range missiles.
MBDA are the prime contractor for both the weapons systems and the Samson radar with BAE systems as the secondary contractor reporting to MBDA.

Guns

The flight deck of the Type 45 is large enough to accommodate aircraft up to the size of a Chinook helicopter. It has hangar space for either one Merlin HM1 or two Lynx helicopters. The Merlin HM2 has a dipping sonar, sonobuoys and radar; the Merlin carries four anti-submarine Sting Ray torpedoes whilst the smaller Lynx HMA8 carried either two Sting Ray or four Sea Skua anti-ship missiles. From 2015 the Lynx has been replaced in RN service by the AW159 Wildcat whose weapons will include the Lightweight Multirole Missile and FASGW missile. The Wildcat is reliant on ship's sensors to prosecute submarine targets, since in RN service it currently has no dipping sonar or sonobuoys of its own.

Anti-ship, submarine and land-attack

Six ships have been ordered, and transfer of custody of the first happened on 10 December 2008. The MoD's initial planning assumption was to procure twelve ships, with the size of the second batch to be determined between 2005 and 2010. However this was reduced to eight ships in the 2003 defence white paper entitled Delivering Security in a Changing World: Future Capabilities, following a strategic refocusing on "small to medium-scale operations" and expeditionary land operations. It was reported in December 2006 that the last two could be cut. In July 2007, Ministry of Defence officials stated that they "still planned to build eight Type 45 destroyers" and that "the extra two ships were still included in planning assumptions". This plan was officially abandoned on 19 June 2008 when the Minister for the Armed Forces, Bob Ainsworth, announced in Parliament that options for the seventh and eighth destroyers would not be taken up. The continual scaling back of the project, first from twelve to eight, and subsequently to six ships, has been criticised for leaving the Royal Navy with insufficient ships to meet its requirements.
On 9 March 2007, The Independent reported that Saudi Arabia was considering buying "two or three" Type 45s. On 7 September 2007 it was reported that Saudi Arabian officials had been invited to observe Darings sea trials.
In 2009 the House of Commons Public Accounts Committee conducted an enquiry into the procurement. Its main conclusions were that despite the destroyer being based on 80% new technology, there was a failure to take sufficient account of technical risk, over-optimism, and an inappropriate too-early fixed price project entered into before many elements had been specified. This resulted in a difficult commercial relationship until a contract renegotiation in 2007. It noted that the MoD believed six ships would still enable it to meet the operational requirement of having five ships at sea, with only a small risk of failing to meet that requirement.
In July 2016, it was reported that all six of the class were docked in Portsmouth. The Ministry of Defence said it was "unusual but not unprecedented" and that "All Type 45 destroyers are currently in port as they have either just returned from operations, or are about to be deployed, are conducting training or carrying out maintenance or are home for crew to take summer leave."
In an interview with the Sunday Times, former Rear Admiral Chris Parry claimed that the Type 45 destroyers are noisy ships which can be heard away by submarines.
The entire class is based at HMNB Portsmouth.
NamePennant No.BuilderFirst steel cutLaunchedDate of commissionStatus
D32BAE Systems Surface Ships28 March 20031 February 200623 July 2009, laid up since 2017 and now under refit.
D33BAE Systems Surface Ships26 August 200423 January 20073 June 2010Since Feb 2016, she had been relegated to a Harbour Training Ship at HMNB Portsmouth., undergoing refit in Birkenhead at Cammell Laird for the first PIP, due to return to service 2021
D34BAE Systems Surface Ships25 February 200527 November 20076 May 2011In active service
D35BAE Systems Surface Ships19 December 200517 November 200820 April 2012In active service
D36BAE Systems Surface Ships31 July 200621 October 200921 March 2013In active service
D37BAE Systems Surface Ships26 January 200711 October 201026 September 2013As of May 2020, undergoing refit

Only three ships of the Type 45 Daring class carry the same names as members of the previous s of 1949; these are:, and. These names had been used for the D-class destroyers of the 1930s, with the addition of, which was also one of the Type 14 frigates in the 1950s. The remaining Type 45 names, and, were previously carried by D-class cruisers of 1918, which served until 1945.

Footnotes