Tyholt Tunnel


The Tyholt Tunnel is a railway tunnel which runs between Lerkendal and Lademoen on the Stavne–Leangen Line in Trondheim, Norway. The line takes its name for passing under the neighborhood of Tyholt and only sees regular freight traffic.
Construction began by the Wehrmacht during the German occupation of Norway from 1940 to 1945, but the project was never completed. The Norwegian State Railways resumed the work in the 1950s. Part of the tunnel was built using cut-and-cover, part using a tunneling shield and most of it was blasted. It opened on 1 June 1957.

Specifications

The Tyholt Tunnel is a un-electrified, single track, standard gauge railway tunnel. It constitutes nearly half of the Stavne–Leangen Line, which acts as a bypass around Trondheim. The tunnel is owned by the Norwegian National Rail Administration. From the south end, the first is a culvert, the next run through sediments and the final are in bedrock.

History

During the German occupation of Norway as part of the Second World War, the Wehrmacht wanted a railway route past Trondheim which was guarded against sabotage. They decided that the best way to do this was to build a tunnel under the neighborhood of Tyholt. However, construction of the tunnel took much longer than expected, so instead the Wehrmacht started laying railway tracks in the streets in Trondheim. However, neither of the two lines were completed by the time of German capitulation on 8 May 1945.
The Norwegian State Railways regained interest in the line during the 1950s and resumed construction. The Tyholt Tunnel was among the first attempts in Norway to build a tunnel through sediments. The southern-most were built using a cut-and-cover method. The next were built through sediments using a tunneling shield. It measured in length and had a diameter of. The shield was moved forward with twenty hydraulic pumps, moving it at a time. The tunnel received an outer precast concrete shell and an inner ring cast with formwork.
The main concern was the up to thick layer of quick clay, which would stick to the shield. When the shield advanced, it would drag with it some of the clay, creating holes which had to be filled with concrete. After an overpressure was required, and a section of tunnel was sealed off. At first a pressure of 0.9 km/cm3 was used, later increasing to 1.8 km/cm3. The remainder of the tunnel was blasted.
The line and tunnel were officially opened on 1 June 1957 and revenue traffic started the following day. The tunnel was originally only used for freight trains, although it was occasionally used by passenger trains, especially when there was maintenance work on bridges. Ownership of the tunnel passed to the Norwegian National Rail Administration from 1 December 1996. NSB launched a now abandoned proposal in 2002 to establish an urban train service in Trondheim, which would have included passenger trains running in a loop through the tunnel. It would have required investments of 120 million Norwegian krone, including a connection for trains to be able to run from the east end of the line and westwards on the Nordland Line, and investments to noise insulate the Tyholt Tunnel.