Tumut Two Dam


Tumut Two Dam or Tumut Two is a major ungated concrete gravity dam across the upper reaches of the Tumut River in the Snowy Mountains of New South Wales, Australia. The dam's main purpose is for the generation of hydro-power and is one of the sixteen major dams that comprise the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.
The impounded reservoir is called the Tumut Two Reservoir, or less formally, the Tumut Two Pondage.

Location and features

Completed in 1961, Tumut Two Dam is a major dam, located approximately west of Cabramurra. The dam was constructed by a consortium comprising Kaiser-Walsh-Perini-Raymond based on engineering plans developed by the Snowy Mountains Hydroelectric Authority and the United States Bureau of Reclamation under contract from the Snowy Mountains Hydroelectric Authority.
The dam wall comprising of concrete is high and long. At 100% capacity the dam wall holds back of water. The surface area of Tumut Two Reservoir is and the catchment area is. The spillway is capable of discharging.

Power generation

Downstream of the dam wall and located underground is Tumut 2, a conventional hydroelectric power station, that has four turbine generators, with a generating capacity of of electricity; and a net generation of per annum. The power station has rated hydraulic head. The underground powerhouse is located below ground level.

Tumut Two Reservoir

Tumut Two Reservoir or Tumut Two Pondage is formed by the Tumut Two Dam. Snowmelt and other runoff enter the reservoir from the upper Tumut River and the dam impounds the river's natural flow above the Tumut Pond Dam wall and the Tumut Pond Reservoir.
Water from the reservoir, after passing over the spillway of the Tumut Pond Dam, flows downstream, above the underground Tumut 1 Power Station, and into the impounded waters of Talbingo Reservoir, formed by the Talbingo Dam; past Tumut 3 Power Station, into Jounama Pondage, formed by Jounama Dam; and then into Blowering Reservoir, formed by Blowering Dam, passing through Blowering Power Stations. The natural flow of the Tumut River continues into the Riverina region.