Tui mine


The Tui mine is an abandoned mine on the western slopes of Mount Te Aroha in the Kaimai Range of New Zealand. It was considered to be the most contaminated site in the country, following the cleanup of the former Fruitgrowers Chemical Company site at Mapua, Nelson.

History

In the 1960s, the Tui mine extracted copper, lead and zinc sulphides. The mine was abandoned in 1973, after the mining company Norpac Mining went bankrupt. Waste, rock ore dumps and mine tailings were left behind. The tailings have significant amounts of zinc and cadmium. The mine tailings are stored behind a dam in a large pool-like area which has an oxidised, solid surface layer. The dam contains over 100,000 cubic metres of very acidic, sulphide-rich tailings. In 1997, there had been no natural plant recolonisation on the tailings for more than 20 years.

Environmental issues

The tailings dam was considered to be unstable and is leaching various minerals, including heavy metals, into neighbouring waterways and this adversely affected the stream ecology. According to Environment Waikato, the Tui mine had three major environmental impacts;
  1. The heavy metals lead and cadmium were leaching from the tailings dam into the Tunakohoia stream, which flows through land managed by the Department of Conservation and through the centre of the town of Te Aroha. Four years after the mine closed, the Te Aroha town water supply was found to be contaminated with heavy metals leaching from the tailings.
  2. The separate Tui catchment was also contaminated with heavy metals from the tailings dam.
  3. The abandoned mine tailings dam in the Tui catchment was at risk of collapsing in a moderate seismic event or an extreme weather event. That could have caused 90,000 cubic metres of mine waste to liquefy and to flow down the Tui stream near to Te Aroha.

    Remediation

In 2007, the New Zealand Government announced that $9.88 million will be made available to clean up the site with the work scheduled to be completed by 2010. In April 2010 it was reported that the estimated cost of the clean-up would be $17.4 million and in 2011 a sum of $16.2 million was allocated to the cleanup with most of the funding from central government. Remediation of the mine site was completed in 2013, at a total cost of $21.7 million.