Tronador is a series of Argentine rockets, including the Tronador I and Tronador II vehicles, to develop a liquid-propellant rocket expendable launch system called ISCUL.
The Tronador I is an unguided liquid-fueled rocket used for sub-orbital spaceflight test flights. Its development led to the larger VEx test rocket, testing technologies needed for the Tronador II, which has a guidance system and would be capable of reaching low Earth orbit. Development of the satellite launch vehicle has cost more than 600 million dollars over several years.

Tronador I

The Tronador I is an unguided liquid-fueled rocket used for sub-orbital spaceflight test flights.

Tronador I (T1)

The Tronador I vehicle was flown successfully on June 6, 2007 from Puerto Belgrano Naval Base near Bahía Blanca, in the south east of the Buenos Aires Province. This was the first flight of a technology demonstrator vehicle for the program.

Characteristics

The Tronador Ib vehicle was flown successfully on August 5, 2008 from Puerto Belgrano Naval Base. This was the second technology demonstrator vehicle flown for the program.

Characteristics

This was the first cooperative test flight between Comisión Nacional de Actividades Espaciales and Brazilian Space Agency; it was successfully flown in December 2007. The payload built by CONAE, carried several experiments to validate subsystems for the program such as: IMU, GPS receptor, all integrated into the on-board computer, and an attitude control system via cold-gas thrusters. The payload unit completed a suborbital flight carried by an AEB-built VS-30 solid-propellant rocket booster, and was then recovered from the sea after landing with parachutes.

Characteristics

Tronador II's maiden orbital launch is expected to fly in 2019, from Puerto Belgrano Naval Base.

Characteristics

As of June 2016, the proposed Tronador II configuration:
The initial proposal was for a 3-stage rocket. In early 2015, an evolved configuration was presented at the 52nd Committee on Peaceful Uses of Ultra-Terrestrial Space meeting and at the Punta Indio test launch pad.

T4000

The T4000 test rocket is related to the project, as it is the basis of the 3rd stage of the Tronador II. Specifically, it was intended to house the attitude control system. The first launch attempt in 2011 failed.
;Characteristics
The recent strategy was to fly separately several suborbital experimental subsystems, called "VEx", before they are incorporated in the prototype of the Tronador II rocket. After a few launches, it was decided in 2017 to stop the experimental Vex series as enough data was obtained to go ahead with a prototype rocket.
VEx-1A
In March 2014, a suborbital prototype named VEx-1A failed during launch from Pipinas, Punta Indio Partido. It had only one stage, weigh 2.8 tonnes, thrust of 4 ton, 60 seconds mission duration, expected apogee of 2 km. VEx-1A first launch attempt was postponed in December 2013 due to ground support equipment fail. The second attempt failed on February 26, 2014. It was discovered that the failure was caused by interferences between the launch pad and the rocket, which prevented the vehicle from elevating more than 2m off the ground. The engine control mechanism shut off the fuel valve, preventing an explosion, and the rocket fell down next to the pad.
VEx-1B
The first flight of this suborbital vehicle was on 15 August 2014 from Pipinas, Punta Indio Partido. It successfully tested propulsion, control, and navigation subsystems. 2,200 m apogee, 27 seconds flight time. It landed in the sea assisted by the recovery parachutes. The vehicle was recovered and examined to determine whether further VEx-1 test rockets are required or if a VEx-2 flight should be implemented.
VEx-5A
VEx-5A was a two stage suborbital rocket that was destroyed upon launch. The T-10 first stage is capable of producing 11t of thrust, while the T-4 second stage is capable of 4t of thrust. The rocket was 18 meters long and 1.5 meters diameter, with a total launch weight of 8500 kg. The rocket would have separated from the first stage at 15 km altitude and the second stage would have continued, reaching up to 30 km altitude using hydrazine/nitric acid. The vehicle would have tested several technologies, new fuels, and for the first time, the separation of two stages rocket, and the ignition of the second stage in flight. The rocket was completed in mid 2015 and scheduled to launch in October 2015, and then November 2016. The test flight finally occurred on 21 April 2017, 18:00 local time from Pipinas, Punta Indio Partido. The rocket climbed up from its pad, but eight seconds later the first stage rocket engine shut down due to abrupt flow in its fuel lines. Several seconds later, the rocket fell and impacted the launch pad, causing a fiery explosion. The ill-fated launch was announced officially by CONAE several hours after the launch and footage from several angles were made available.
VEx-5B
Test flight - single stage 30t thrust engine rocket - it was projected for a 2018 launch from Pipinas, Punta Indio Partido. The mission was cancelled in 2017.
VEx-5C
Test flight - two stage test rocket. First stage 30t thrust engine, second stage VEx-1 engine - it was projected for a 2019 launch from Puerto Belgrano Naval Base. The mission was cancelled in 2017.

Tronador III

The proposed Tronador III would have the same diameter as Tronador II, but would have a length of. The fueled rocket would weight 89 metric tons, and capable of delivering a ton of payload into polar orbit.