Talbot Avenue is an MBTA Commuter Rail station in Boston, Massachusetts. It serves the Fairmount Line. It is located near Codman Square in the Dorchester neighborhood. The station includes two full-length high-level platforms located north of Talbot Avenue, which are also accessible from Park Street and West Park Street. The station opened on November 12, 2012 as the first of four new stations on the Fairmount Line. Talbot Avenue was the first completely new rail station to open in the City of Boston since Yawkey opened in 1988.

History

Previous service

Service on the Fairmount Line began in 1855 and lasted until 1944. Stations were located at Harvard Street and Dorcester, which are one quarter-mile to the north and south, of the new station site. The new station is the first station on the line located at Talbot Avenue.

Restoration and plans

Temporary shuttle service resumed on the Fairmount Line in 1979 during Southwest Corridor construction, with stops at Uphams Corner, Morton Street, and Fairmount. The MBTA planned to drop the shuttle after service resumed on the Southwest Corridor in 1987, but the service was locally popular and the Fairmount Line became a permanent part of the system. A plan called the Indigo Line was later advanced by community activists in which the line would add stations and more frequent service to closely resemble a conventional rapid transit line. The Indigo Line plan was not adopted, but elements of it were included when the Commonwealth of Massachusetts agreed in 2005 to make improvements on the Fairmount Line part of its legally binding commitment to mitigate increased air pollution from the Big Dig. Among the selected improvements in the Fairmount Line Improvements project were four new commuter rail stations on the line, including one at Talbot Avenue as well as Newmarket, Four Corners/Geneva, and Blue Hill Avenue. The stations were originally to be completed by the end of 2011.

Talbot Avenue station

A $15.9 million contract for construction of the station and the replacement of the adjacent Talbot Avenue overpass was awarded in August 2010. Construction began in November 2010, with a footbridge connecting Park Street to West Park Street removed in December. An official groundbreaking was held in June 2011. The bridge over Talbot Avenue was replaced during the third weekend of December 2011, using techniques developed in MassDOT's Fast 14 highway bridge replacement program.
The station was 80% complete by April 2012. By September, the station was 92% finished, with only minor cosmetic work remaining. On September 13, the MBTA announced that the station was planned to open in October 2012. The station did not open in October; on November 7, the MBTA announced the opening date. The station opened on schedule on November 12, 2012. In April 2013, a 6-foot fence on both platforms was erected in response to privacy concerns from residents of abutting properties. Ribbon-cutting ceremonies were held at Newmarket, Four Corners/Geneva, and Talbot Avenue on July 17, 2013.