The Tabriz Metro is a rapid transit system serving the city of Tabriz, Iran. The first phase opened on 28 August 2015 with 7 km length and 6 stations. There is also one regional commuter line planned to Sahand.

Lines

Line 1

Its first phase opened on 27 August 2015.The 7 km route runs northwest from El Goli to Ostad Shahryar with four intermediate stations, including three in a tunnel excavated using TBMs.Services are operated with coupled pairs of five-car trainsets. There will be free-of-charge services from 11:00 to 13:00 for 3 months starting from Saturday 29 August 2015. The first phase is 7 km long and has 6 stations from El Goli Station to Ostad Shahriar Station. The frequency of the services right now is every 20 min. Its second phase will be opened some time in summer 2016 and will be from Ostad Shahriar Station and Meydan-e Sa'at Station. The east-west line 1 finally completed on February 2020 and now run for 17.2 km from El Goli to Nur with 18 stations.

Line 2

Line 2 which in currently under construction is approximately 22.4 km long, consisting of 20 stations starting from the quay lands, through Wahdat and Jaramalek Square and passing under Akhouni Street, Qods Street, Amin Road, Maidan. Daneshwara goes into Abbasi Street and extends to Shahid Fahmideh Square.

Line 3

Line 3 is currently in the planning stage. It will have a mostly north-south route, running from Tabriz International Airport to South Terminal. Along the way it will connect major passenger nodes such as North Terminal, central park, Bazaar District, Stadium military medical, Academia centers, and Yadgar-e-Emam Stadium. It will cross crowded slum districts, likely attracting more riders than the other lines. It will be 14.7 km long and have 14 stops, including 4 transfers to other lines.

Line 4

Line 4 of Tabriz metro will encircle the old city centre and intersect with all the other 3 lines. Tramway, with a length of 15.4 km, including 18 stations, starts circularly from the Azarbaijan field and crosses the Tabriz Highway to the Pasdaran Highway after crossing the Jihad and Abrasan Square. This line connects the other three lines.

Tabriz-Sahand Commuter Line (Line 5)

Line 5 of Tabriz metro is planned as a light rail train that connects Tabriz to its satellite city, Sahand. Tabriz-Sahand: At station 1, line 1 will have a common station and continue across the tractor to Sahand. Commuters will travel via tram.
Of these routes, only a portion of Line 2 is currently operating between elgoley Station and Clock Square Station.


Also a Tram Line is Proposed to feed the Metro.

Wagons characteristic

Tabriz subway trains with 3 wagons, including three motorized wagons and two trailer wagons, are intended for a length of 2 meters, with the length of the platforms for passengers and pedestrians having the same length of 5 meters. The specifications of Tabriz subway wagons are as follows:
Passenger capacity per car1 person standing, 2 people sitting. Totally 2 people
Train passenger capacity1 person for 1 person per square meter
Number of doors per car۸ The door
Maximum axial load1.5 tonnes
Minimum horizontal arc radius at stop1 m
Minimum horizontal arc radius on track1 m
The length of each car1 m
Car Width1mm
Wagon height1mm
Floor height1mm
The maximum slope of the line4.3 percent
Maximum acceleration when moving2 meters squared
Maximum train speed1000 km / h
average speed500 km / h

Gallery