Stepney Power Station
Stepney Power Station was a small coal-fired power station situated by the Thames on the north side of Narrow Street, Limehouse, London.
History
began construction of the station at Blyth Wharf in 1907. A coaling jetty was built in 1923. The station supplied the boroughs of Stepney and Bethnal Green.New generating equipment was added as the demand for electricity increased. The generating capacity, maximum load, and electricity generated and sold was as follows:
Year | Generating capacity, MW | Maximum load, MW | Electricity generated, GWh | Electricity sold, GWh |
1903/4 | 1.72 | 1.266 | 2.745 | 2.53 |
1912/3 | 8.00 | 6.046 | 17.783 | 14.580 |
1918/9 | 16.50 | 9.720 | 28.812 | 25.383 |
1919/20 | 16.00 | 10.24 | 30.836 | 28.503 |
1923/4 | 32.00 | 17.501 | 50.053 | 42.140 |
1936/7 | 70.00 | 41.904 | 95.304 | 98.686 |
In 1923 the plant comprised one 1,500 kW, one 2,000 kW, two 5,000 kW, and one 10,000 kW turbo alternators, totalling 23,500 kW. The surplus of revenue over expenses in 1923 was £129,659.
Following pollution problems from the original chimneys a single tall brick chimney was constructed in 1937, dominating the area. In 1956 it was reported that the first Brown-Riley coal pulveriser had been installed at Stepney power station and having been in operation for some time was working with satisfactory results. At this time the equipment comprised: 1 × 34 MW Fraser & Chalmers-GEC; 1 × 19 MW Escher-Wyss-Oerlikon; 1 × 6.25 MW Escher-Wyss-Brown-Bovery; and 2 × 12.5 MW Metro-Vickers turbo-alternators.
During its final decade of operation the station comprised a single 34 MW generator. This was supplied with steam at a range of pressures and temperatures: 180/350 psi at 299/399/460°C. The steam capacity of the boilers was 753,000 lb/hr. The boilers comprised 3 × Stirling; 3 × Spearling; and 2 × Babcock & Wilcox. Electricity output from Stepney power station was as follows.
Stepney annual electricity output GWh.