South London line
The South London line is an Inner London railway line. Passenger services are part of London Overground and run between and continuing toward via the East London line. The line consists of seven stations, one of which marks the crossover into the East London line network and is long. Most of the line was built on a high level viaduct above other transport infrastructure. Interchanges with the London Underground are at and the closest on its London Overground extension is. The line is in Travelcard Zone 2.
From the early 20th century until December 2012, a shorter precursor shuttle train service ran from the major terminus of Victoria in Westminster to the interchange station at London Bridge adjoining the City of London. Sections of the line are still in use by other passenger and freight railways, and a section of the line was also used by Eurostar trains when the London terminus was between 1994 and 2007.
History
The London, Chatham and Dover Railway was authorised to build the former route of the line by the South London Railway Act 1862. Designed and engineered under Frederick Banister, it re-used the Wandsworth Road to Brixton section built as part of the LCDR main line. The line was quadrupled and extended to London Bridge. The northern pair of tracks, without stations, was used by the LCDR to Kent; the southern were used by the London, Brighton and South Coast Railway into east Surrey parts of which became Greater London. Several stations were shared by the two companies.The LBSCR scheme, authorised in 1903, pioneered main-line rail electrification in the UK, and the first electric train ran on 1 December 1909. For the following three years, steam trains alternated with electrics, the latter operating every 15 minutes from 7.30am to midnight. Passenger numbers had fallen on introducing electric tramways in South London by 1.25 million in six months. In the first year of the rival line's electric operation passengers increased from 4 million to 7.5 million. The electrification used the overhead system at 6700 V AC, supplied by a power station at Deptford. After creation of the Big Four railway companies, the Southern Railway installed standard third-rail 660 V DC supply on 17 June 1928.
;Pre-extension route
The Southern service between London Victoria and London Bridge was axed in favour of joining to Clapham Junction and the London Overground's East London line leading to a reduction to peak-hour and Saturday services, adopting the west end of the old route.
East London line extension into South London line
In 2012 a diversion was made to the eastern end to join to the East London line, a former London Underground line which was reconverted to main line operation as part of Phase 2 of its extension project reinstating an alignment between Rotherhithe and Peckham that had been disused since 1911, via Old Kent Road station. This created the route from to via,,, and. Completion was scheduled for May 2012 in time for the London 2012 Summer Olympic and Paralympic Games, which was not achieved as the line opened on 9 December 2012.The East London line connects to the North London line at, completing an orbital rail route around Central London, fulfilling the Orbirail concept.
Services
Passenger rail services were provided post-privatisation in the 1991 until 2012 by Southern, as with continuing services on the eastern section from Peckham Rye to London Bridge. These services were part of the discontinued London Bridge - London Victoria service via Denmark Hill.Services along part of the line are operated by Southeastern on the Victoria-Dartford line and the Chatham Main Lines, calling only at Denmark Hill and Peckham Rye.
The London Overground also runs on this line as part of the Clapham Junction - Dalston Junction / Highbury & Islington service. Trains also call at Wandsworth Road and Clapham High Street stations.
Southern also operates regular services from London Bridge to Caterham and Beckenham Junction. These services run along a small portion of the line, joining up from the Sutton and Mole Valley Lines at Peckham Rye, until it diverges from the London Overground at Queen's Road as trains continue towards London Bridge.
From January 2015
The Thameslink Programme caused Southeastern to make these timetable modifications:Off-peak & Saturday
- 4tph between Clapham Junction and Highbury & Islington
- 2tph between London Victoria and Dartford via Bexleyheath
- 1tph between London Victoria and Dover Priory via Chatham
- 4tph between Clapham Junction & Highbury Islington
- 2tph between London Victoria & Dartford
- 1tph between London Victoria & Dover Priory via Chatham
- 4tph between Clapham Junction & Highbury Islington
- 2tph between London Victoria & Dartford
- 1tph between London Victoria & Dover Priory via Chatham
Addition of New Bermondsey station
Proposed developments
Victoria to Bellingham service
Speed of access of major destinations has changed as a result of the 2012 re-routing. The line since 2012 takes in Canada Water station, closely linked to Canary Wharf; similarly from Clapham Junction the West London line is made directly available.London Victoria and London Bridge since 2012 became indirectly linked — via Clapham Junction or Peckham respectively. A demonstration took place to restore the route during the month when the route changed. A survey by London Travelwatch found that 88% of passengers on the line felt they would be inconvenienced by the changes.
To compensate for the loss of services, it was proposed to introduce a Victoria- service. This would restore the old route to Peckham Rye and take in part of the Catford Loop Line, to Bellingham in south-east London. The proposal was abandoned due to funding issues.
Pressure groups and local MPs urged the Mayor to reconsider who secured funding in principle from the Secretary of State for Transport for greater line use or branches to be added. TfL compiled a shortlist of proposals to address the upset in commuting times.
Lobbying for additional stations
Between Denmark Hill and Clapham High Street, the line passes through Brixton, crossing over and stations but without its own stations. In 2004, concerns were raised by local politicians and residents that the Brixton area was not being served by the line and campaigners criticised the East London line Extension project for missing opportunities to create interchange stations with Thameslink and the London Underground Victoria line.Plans were not produced for such stations as the line is on high viaduct, increasing the costs prohibitively. The Mayor of London, Ken Livingstone, expressed doubts that any proposals to construct these stations would pass a cost-benefit analysis and that they would be unlikely to be approved. Lambeth Council and the East London line Group have expressed support for an interchange station at Brixton and have requested that this proposal be considered for future funding. Suggestions have been made that East Brixton station could be re-opened as an alternative.