Smøla Wind Farm


Smøla Wind Farm is a 68 turbine wind farm located in Smøla Municipality in Møre og Romsdal county, Norway. The farm is located southeast of the village of Dyrnes on the island of Smøla. It is operated by Statkraft and covers an area of.
Total installed effect is 20 x 2.0 MW plus 48 x 2.3 MW. The maximum production capacity is 150 MW and total generating capacity is in average 450 GWh per year, making Smøla one of the largest wind farm in the country.
The first stage was opened by King Harald V of Norway on 5 September 2002. Phase two opened in September 2005.