Sevastopol Shipyard


Sevastopol Shipyard is a shipyard located in Sevastopol, Crimea, founded as a dockyard for the Imperial Russian Navy in 1783.
The shipyard has mostly been used to repair and maintain warships throughout its history, although it has occasionally also built ships.

History

The Sevastopol Shipyard was founded in 1783 on the south side of Sevastopol Bay to maintain the ships of the Black Sea Fleet. It occasionally built frigates and smaller sailing ships between 1813 and 1851. The Sevastopol Shipyard Lazarevskoe Admiralteystvo Ltd. company was named after Admiral Lazarev who was assigned as the general commander of the Black Sea Ports and fleet in 1834. He was a major contributor to the development of the Black Sea Fleet and to the building and development of Sevastopol itself. The dockyard was transferred to the Russian Steam Navigation and Trading Company in 1858 after the damage caused by the Crimean War of 1854–55 was repaired. It was nationalized on 16 August 1897.
The Soviets separated it from the naval base in 1919 and named it the Sevastopol Shipyard, Engineering and Electromechanical Works. The dockyard was renamed the Sevastopol Naval Shipyard on either 13 January 1921 or January 1930. It was again renamed Shipyard No. 201 on 30 December 1936 and became Shipyard in the name of Sergo Ordzhonikidze No. 201 on 15 May 1940.

After the annexation of Crimea

Under Ukrainian law, the shipyard is part of the Sevastopol Marine Plant joint stock company. As of 2017 the shipyard is under the ownership of Zvezdochka Shipyard, a subsidiary of United Shipbuilding Corporation. On January 31, 2018, the government of Russia transferred control of the shipyard to the Russian government under the control of the Ministry of Industry and Trade.
The shipyard is building two special catamarans, each one from two barges to move on places railway and highway of Crimean Bridge arcs, also tankers and other vessels.

Facilities and Services

The shipyard operates three dry docks, a slipway for the assembly of floating crane hulls and ships, specialized shops and production sections, large warehouses, fitting-out embankments, and every other facility to secure the ship's vital systems and units.
LengthBeamDraftPortal crane, lifting capacity
Dock #11 × 80; 1 × 10; 1 × 30; 1 × 16
Dock #22 × 10
Dock #31 × 10; 1 × 16

List of Products

s, Fishing boats, Pontoons, Barges, Repair, else.
Pontoons and Barges related to the building of the Kerch Bridge.

NameClass and typePlant №LaidLaunched
ChersonesosSails boat, repaired Chersonesosndbuilt 10/06/1988 at Gdansk Shipyard, repaired from 09/10 11 10/12 2015 to 11/06/2016
ndndndnd
nstwo "Catamaran" based on two Barges each, to transport Crimean Bridge Highway lanes und Railway arcs, from Kerch site to the fairway bridge on the Sea Passage and also pontoons related to that work.ndmost likely near or past the half 2015 through 2016 and as today since
ndndndnd