SM City Iloilo is a four-level complex namely lower ground floor, upper ground floor, second floor with a Total retail floor area of 181,657 sq.m. located at Mandurriao, Iloilo City. The mall features 8 cinemas, food hall, food court and a cyberzone. The SM Foodcourt on the Lower Ground Level of the Main Building, SM Cyberzone at the Third Level of the Northpoint, SM Foodhall at the 2nd Floor of the Northpoint.
History
The mall complex was designed by Palafox Associates with D.A. Abcede & Associates as consultants and Young Builders Corporation as the contractor. Built on the same design template of SM City Fairview and SM City Bacoor at the height of Asian Financial Crisis, its interior, and the external facade has a resemblance to the two other malls. SM City Iloilo was opened to the public on June 11, 1999. The mall features main anchors like The SM Store, SM Supermarket, SM Cinemas, SM Foodhall and SM Foodcourt. The mall underwent a major renovation in the 2nd quarter of 2008 and was completed in the 1st quarter of 2009. TeleTech Customer Care Management Philippines Inc., a BPO company occupies the entire 3rd level of the mall. In 2009, an annex with a floor area of, adjacent to the main mall building was built to house some food-based tenants. In 2015, the new expansion wing was opened on the north side of the mall to accommodate more than 165 local and international shops and restaurants. It also featured the third SM Food Hall in the country after SM Megamall and SM Aura and a larger Cyberzone in the 3rd Level. The expansion is seamlessly connected to the main building. On November 11, 2016, the SouthPoint Expansion opened and is located near the south entrance of the main mall. The area was formerly occupied by a parking area. It was built to house additional food-based tenants. The SouthPoint Expansion is connected to the Main Mall through a bridge. It also has a mini park with the fountain court.
SM Strata BPO Tower
SM Strata,a hotel and parking garage is located at the northeastern side facing the main mall. The first 6 parking levels were opened on November 11, 2017 with a connection from the footbridge in the 2nd floor. It will have 18 floors, the ground level will serve as a transportation terminal, the 2nd to 5th floors serves as a parking area for SM Clients, and the 6th to 18th floors will be reserved for the BPO offices. It will also have a GFA of 45,000 sqm. Together with the BPO tower, a new 10-storeys Park Inn by Radisson Blu hotel has already been built next to the Southpoint Expansion. Currently, ongoing ground works is underway for the construction of SM Style Residences. A five 16-storeys condominium building that is target to be completed by 2022.