River Subdivision (CSX Transportation)


The River Subdivision is a railroad line owned by CSX Transportation in the U.S. states of New Jersey and New York. The line runs from the North Bergen Yard in Hudson County, New Jersey, north to Ravena, New York, along the alignment of the West Shore Railroad, a former New York Central Railroad line.

History

The original line was opened in segments by a number of different companies from the 1860s to the opening of the full line in the 1880s, by which time it was known as the New York, West Shore and Buffalo Railway. Through mergers, leases, and takeovers, it became part of the New York Central Railroad and then Conrail in 1976. When the majority of Conrail was broken up in 1999, its River Line was assigned to CSX Transportation.

Current operation

The River Subdivision is a major north-south rail corridor located between Bogota, New Jersey and Ravena, New York, carries strictly freight trains and runs mostly along the shoreline or paralleling closely to the west bank of the Hudson River. The River Subdivision is part of the CSX Albany Division, which in turn is part of CSX's Northern Region of Operations.
The CSX designated subdivision code for the River Subdivision is "RI", with the River Subdivision falling under the "NI" dispatchers desk since March 8, 2009. It had been part of the "NJ" dispatchers desk until this date. Mileposts and locations along the River Subdivision are denoted by the CSX milepost prefix: "QR".

Trackage prior to 2008

Note: CP stands for Control Point, which denotes an interlocking, or the location of a track signal or other marker with which dispatchers can specify when controlling trains.
Prior to July 1, 2008, the section of track from QR 2.1 north to CP-QR 7, a point located in Bogota, New Jersey, was originally part of the CSX Bergen Subdivision / Baltimore Division prior to 2008, while the River Subdivision began at CP-QR 7 and continued north to Selkirk.

On July 1, 2008, the segment from QR 2.1 to CP-QR 7 ; was incorporated into the River Subdivision, and the Bergen Subdivision was abolished. Also taking place at this same time, was the River Subdivision being extended south to QR 1.6, adding 5/10th of a mile to the route.

Trackage 2008 - present

The section of track south of QR 1.6 at the south end of North Bergen Yard is now owned by Conrail Shared Assets Operation and is part of the North New Jersey Operational Area River Line. As such, the River Subdivision now connects directly to the River Line at MP QR 1.6 and the first "Controlled Point" on the River Subdivision is now CP-QR 3.

Points of interest

Major points of interest along the River Subdivision route listed below. MP is the abbreviation for MilePost. Mileposts progress numerically from south to north. These points are of major interest to railfans and rail photographers.
The area around Bear Mountain, north to West Point, often called the "Hudson Water Gap", is possibly one of the most scenic areas of the Northeast. One of the most popular locations on this route is Iona Island. Iona Island is a public access nature reserve, and the River Subdivision transects the island. Being public access, it allows railfans to photograph and observe trains without trespassing on railroad property. 2 miles north, Mine Dock Park, in Fort Montgomery, is also bisected by the tracks, and has views of not only CP43 and the tunnel, but also across the Hudson to the MNCR/Amtrak line on the opposite shoreline. Mine Dock Park opened in 2012.
Also in Bear Mountain State Park by using the pool entrance and going under the CSX bridge offers views of both the CSX trains which you can walk right up to on the public embankment. As well as the Metro North and Amtrak Trains with the mountains behind them on the other side of the Hudson.
Bergenfield, NJ is also a popular railfanning location especially for signal fans, as some of the crossings have signals dating back to the Penn Central era, with rare bells and heavy traffic at the same time.
While not part of the River Subdivision, the Poughkeepsie Bridge "Walkway over the Hudson" crosses over the River Subdivision. This location offers a vantage point overlooking the River SD trackage, and as a backdrop when photographing the River Subdivision from the ground in and around the vicinity of MP QR 72. The views are spectacular to the north, and with a good zoom lens, a series of s-curves can be photographed.
At Selkirk, NY; the River Subdivision ends at "CP-SK" where it curves west and merges into the Castleton Subdivision, and of which this location is the extreme eastern end of Selkirk Yard.
Also at this point CP-SK, the Port Subdivision branches north towards Albany off the Castleton Subdivision. The Port Subdivision ends 7 miles north of CP-SK in South Albany, NY at the Kenwood Yard of the Canadian Pacific Railway.
Also at CP-SK, an eastbound connector from the River Subdivision is available for trains to progress east onto the Castleton Subdivision and over the Hudson River. The Castleton Sub was originally built as part of a bypass for through trains around Albany.
The configuration of the track work at CP-SK between the River Subdivision, Castleton Subdivision including the "east wye track", form a triangle: a "wye" in railroad parlance; on which locomotives can be turned if need be.

Radio frequencies

Radio transmissions between trains and dispatcher operating upon the CSX River Subdivision is assigned to the CSX 'NI' Dispatcher Desk, and can be heard on the following frequencies:
Also, if in close proximity to them, "Hot Box", High Wide "HIWI" or Defect Detectors can be heard relaying train info to the train on the aforementioned road channel.
Location - Milepost


- New Jersey -
- New York -

Freight traffic

Traffic on the River Subdivision consists mostly of long distance trains composed of intermodal, TOFC, unit, and mixed commodity trains.
Traffic density varies, but on weekdays, one can expect to see 15 to 20 trains during daylight hours. Saturdays can provide 18-24 trains during the day, Sundays may only have 8-14 trains.
One can expect to see 2-5 oil trains and 1-2 ethanol trains per day.
Local trains delivering freight to businesses and industries located along the River Subdivision operate out of yards located at North Bergen, NJ; Kingston, NY and Selkirk, NY.
Train symbols operating on this line are:
On rare occasions, a Z prefix may appear on this route, usually detour trains from the NYS&W.
A vast majority of the intermodal traffic originating in the various ports in New Jersey and destined for Chicago, IL and points west from that rail hub, travel north via the River Subdivision to Selkirk, NY; where they turn west.

Bakken oil

The one is used for the transport of Bakken oil. The line uses rail cars that are considered inadequate and a safety hazard calling for more regulations and oversight by the towns which The River Line passes through. In February 2016, competitive federal funding for rail improvements was not awarded to the line. Bridges used for traffic near Port of Albany have not been satisfactorily inspected.

Future freight operations, proposals, and improvements

Plans have been proposed to add sidings and supersidings along portions of the River Subdivision, as rail traffic along this route has increased due to escalating fuel prices, deteriorating and / or congested arterial highways.
The original River line as constructed by the West Shore Railroad was double track main, that is one track assigned to southbound trains and one assigned for northbound trains. With the advent of Centralized Traffic Control a/k/a "CTC", the River line was reduced to single track main with passing sidings at strategic locations.
Several recent proposals put forth plans to either install supersidings permitting trains to pass one another at speed without stopping; or reverting to complete double tracking from North Bergen to Selkirk.
As of 2008, the original signalled siding between CP-QR 76 and CP-QR 78 which was 12,500 feet in length, was extended to 24,000 feet with the extension of the original siding with another siding from CP-QR 78 to CP-QR 80 with crossovers at CP-QR 78. This extension, known as "West Park Siding" makes the entire length from CP-QR 76 to CP-QR 80 a supersiding.
As learned from , page 9 of this document shows one new siding and one supersiding are now proposed to further alleviate rail traffic congestion:
Should CSX decide to double track the entire line, this could be accomplished with minimal difficulty as the River Subdivision was originally double track operation. As the width of the right of way is already graded for double track, with bridges and trestles already in place that had been constructed as double track, only the re-installation of the second main tracks, turnouts and signals need to be installed.
One area of engineering slightly hinders this double tracking, yet it is not insurmountable as it has been done on other railroads and routes. Upon the installation of CTC, one of the two main line tracks was removed, and the remaining main line track was realigned down the center of the some of the tunnels. When use of double stack container trains became prevalent, only the center portion of the tunnel roof or 'ceiling' directly over the track was raised to permit tall double stack intermodal / container trains to use that tunnel. The part of the ceiling where the roof meets the sidewall was not raised.
If double tracking is reinstated, the existing track down the center would need to be realigned to one side of the tunnel to permit the other track to be re-installed. This would now require either the entire width of the tunnel roof to be raised, or the full width of the roadbed lowered to permit double stack intermodal / container trains to use these tunnels.

New Jersey Transit commuter rail proposal

While the Northern Branch Corridor Project has proceeded to the EIS Stage, the West Shore Route is still proposed.
The route holds great promise since it travels through the heart of New Jersey Transit Bus Operations Midtown "commutershed", with four bus routes running well beyond capacity.
The right-of-way has space for four tracks from Croxton Yard northwards to Dumont. Issues in starting commuter rail service are:
With these considerable construction issues, as well as no available space in New York Penn Station for West Shore Line trains, this proposal was put on hold until capacity into New York is increased.