Red Line (Montreal Metro)


The Red Line, also known as Line 3, was a proposed line of the Montreal Metro that never made it past its planning stage. The line was supposed to have 15 stations and end at Cartierville of Bordeaux-Cartierville, using CN tracks and Mount Royal Tunnel under Mount Royal. The line was cancelled because:
The line was still planned for construction as a "regional metro" line in the early 1980s, reduced to a total of 9 stations.
The tracks were used by the commuter rail Deux-Montagnes Line between 1995 and 2020, and will form the central section of the planned Réseau express métropolitain.

1982 list of planned stations

The following stations were planned for the line: