RMS St Helena (1989)


RMS St Helena was a cargo liner that served the British overseas territory of Saint Helena. She sailed between Cape Town and Saint Helena with regular shuttles continuing to Ascension Island. Some voyages also served Walvis Bay en route to and from, or occasionally instead of, Cape Town. She visited Portland, Dorset twice a year with normal calls in the Spanish ports of Vigo and Tenerife until 14 October 2011, when she set sail on her final voyage from the English port.
On 10 February 2018 she departed for her last trip from St Helena to Cape Town. At the time of her retirement from St Helena service she was one of only four ships in the world still carrying the status of Royal Mail Ship. Locals including local press have usually called her
the RMS, in order not to confuse her with the island itself.
In April 2018 she was purchased by MNG Maritime and renamed
MNG Tahiti
to act as a vessel-based armoury licensed by the UK Department for International Trade in the Gulf of Oman. In October 2018 MNG sold the ship and she returned to the UK renamed St Helena once more.

Background

Formerly, Saint Helena island was occasionally served by ships of the Union-Castle Line, which ran between the UK and South Africa. By the 1970s the number of ships taking this route had declined significantly and Union-Castle withdrew from the route completely at the end of 1977. As Saint Helena lacked an airfield, the British government had to purchase a ship to service the remote island and its dependencies from Cape Town.
The British government purchased the part passenger, part cargo ship Northland Prince to fulfil the role of servicing Saint Helena, and after being refitted and renamed this became the first RMS St Helena. Originally built in 1963, this converted 3,150 ton ship had room to carry 76 passengers and supplies. The ship was used by the Royal Navy during the Falklands War as a minesweeper support ship. By the 1980s it was becoming apparent that the ship was too small for the island's needs, resulting in the new St Helena, built in 1989.
The island lacks a port suitable for large ships, so the RMS anchored near the island, and loaded and unloaded cargo to and from lighters.

Characteristics

The new RMS St Helena was built by Hall, Russell & Company in Aberdeen, and entered service in 1990. St Helena was a British registered Class 1 passenger/cargo ship, and operated with 56 officers and crew. St Helena was equipped to carry a wide range of cargo, including liquids, to meet the needs of the population of Saint Helena. She also had berths for 155 passengers and associated facilities including a swimming pool, shop, and lounges. She also had well-equipped medical facilities and an on-board doctor. The ship's capacity was extended in 2012 by the addition of 24 extra cabin berths, and a new gym was installed.
When she converted to a vessel-based armoury, in May 2018, a rigid inflatable boat davit was fitted on the port side, and additional bunks installed, taking the capacity to 30 crew and 250 passengers.
Some sources state that she had the nickname "Betty Blue Bucket".
AW Ship Management had a package deal where passengers could travel in one direction on the RMS and in the other by taking British Royal Air Force flights to or from RAF Ascension Island and RAF Brize Norton in Brize Norton, England.
By the 2010s many construction workers building the airport and South African tourists were passengers. The shipboard culture had been inherited from previous Union Castle lines although formality became relaxed due to changes to overall culture and the customer base.

Incidents

In November 1999, St Helena broke down en route to the island and was forced into the French port of Brest to undergo repairs. Many people were left stranded on the island with no way in or out whilst the ship was being repaired. Panic-buying ensued as islanders became concerned about the non-delivery of vital supplies. This incident intensified calls for the island to be provided with an airport.
On 25 August 2000, St Helena suffered a minor engine room fire while sailing from Cardiff to Tenerife on the first leg of her journey to the island. No one was injured and there was no significant damage.
In March and April 2017 a number of Cape Town – Saint Helena voyages were cancelled because of technical problems with the propellers, making the island isolated as the airport was still not operational.

Recent history

In 2005 the British government announced plans to construct an airport on Saint Helena, which would lead to the withdrawal from service of the RMS St Helena. The airport was initially expected to be operational by 2010. However, it was not approved until October 2011, with work commencing in 2012. The estimated cost on the project is £240 million and the airport was due to open in the first quarter of 2016. However, due to concerns about wind shear, on 26 April 2016 the St. Helena Government announced an indefinite postponement to the opening of Saint Helena Airport. RMS St Helena had been placed for disposal via London shipbrokers CW Kellock, but was subsequently restored to service.
The voyage originally intended as her final one began on 14 June 2016 from the UK and ended on 15 July in Cape Town, calling at Tenerife, Ascension Island and St Helena. As part of its farewell voyage, Royal Mail organised a letter exchange with pupils from Cardiff and St Helena. However, due to the postponed opening of the airport, the schedule of RMS St Helena was extended as an interim measure. The ship was initially scheduled to run until July 2017, and then February 2018. After the opening of Saint Helena Airport to scheduled passenger flights on 14 October 2017, RMS St Helena was withdrawn from service, and her last sailing from St Helena Island was on 10 February 2018.
Freight services for the Saint Helena island have been taken over by the MV Helena cargo ship, which does carry a limited number of passengers, and mail and other express freight by the passenger aircraft. The first passenger on the MV Helena stated that unlike the RMS St Helena, the new ship, with a lower capacity, is strictly geared towards cargo although some former RMS employees had become crew on the new ship.
In April 2018, RMS was purchased by MNG Maritime and entered service as a vessel-based armoury in the Gulf of Oman named MNG Tahiti to supply weaponry to ships travelling through the High Risk Area of heightened pirate activity in the Indian Ocean. In October 2018 the vessel was resold to St Helena LLC, Jersey and in 2019 the ship will be refitted to act as a mobile hub for the race events of the Extreme E electric SUV racing series.