Phutthayotfa Chulalok-class frigate


The Phutthayotfa Chulalok-class frigates are two of forty-six s originally laid down for the United States Navy as ocean escorts, but were all redesignated as frigates on 30 June 1975, in the USN 1975 ship reclassification and their hull designation changed from DE to FF. The Thai Navy acquired them between 1994 and 1996.

Description

The Phutthayotfa Chulalok class are long overall and at the waterline, with a beam of and a draft of, at a standard displacement of and at full load. The steam plant for these ships consists of two Combustion Engineering boilers each equipped with a high-pressure forced draught air supply system, with a plant working pressure of and superheat and rated at driving a Westinghouse geared turbine connected to a single screw. This gives them a speed of.
As built, they were equipped with one /54 caliber Mark 42 gun forward, an eight-round ASROC launcher abaft the gun and forward of the bridge, with four fixed Mark 32 anti-submarine torpedo tubes. A helicopter deck and hangar for operating the DASH drone helicopter was fitted aft. The helicopter facilities were expanded in the 1970s to accommodate the larger, manned, Kaman SH-2D Seasprite LAMP helicopter.

Service history

and were purchased by Thailand in 1996 and 1999. Thailand had initially leased Truett in 1994. Following refits and a service life extensions costing some $14 million each, Ouellet and Truett were commissioned by the Royal Thai Navy as Phutthaloetla Naphalai and Phutthayotfa Chulalok. Both are still in active service.
In 2013, it was reported that the ships of this class would be retired, Phutthayotfa Chulalok in 2015, and Phutthaloetla Naphalai in 2017.

Ships of the class

''Phutthayotfa Chulalok''

Phutthayotfa Chulalok. The ship is named after the first king of the Chakri Dynasty, King Phutthayotfa Chulaok the Great.
The Royal Thai Navy first leased the ship from the US Navy after she was decommissioned on 30 July 1994. The ship was eventually purchased on 9 December 1999.

''Phutthaloetla Naphalai''

Phutthaloetla Naphalai .
The Royal Thai Navy purchased the ship from the US Navy after she was decommissioned on 6 August 1993. The ship subsequently underwent a US $14M refit at the Cascade General Shipyard, Portland, Oregon, and arrived in Thailand in 1998.