Phnom Penh International Airport , is the busiest and largest airport in Cambodia, occupying a land area of 386.5 hectares. It is located in the Pou Senchey District, west of Phnom Penh, the nation's capital.

History

Phnom Penh airport's former name was Pochentong International Airport. On 6 July 1995, the Royal Government of Cambodia signed a concession agreement with the French–Malaysian joint venture company Société Concessionaire d'Aéroport, to operate Phnom Penh – Pochentong International Airport. In return for a 20-year concession, SCA—70 per cent owned by Groupe GTM and 30 per cent by Muhibbah Masterron of Malaysia—committed to a $100 million improvement program that includes the construction of a new runway, terminal and cargo buildings, hangars, installation of a Cat III level Instrument Landing System and associated approach lighting. The Berger Group was selected by the RGC to provide independent engineering services during the concession, to audit the design and to advise on the practicality and cost of the concession's proposed improvements. The Berger team also supervised the initial works to accommodate widebody aircraft such as 747s, including asphalt concrete runway overlays; installation of new ILS, metrological equipment, runway lighting and generator and power systems; and construction of a new fire station, taxiway and turn-pad extensions. Following the successful completion of the initial works, the Berger team provided design review and independent engineering services for the construction of a new terminal building to accommodate growing tourist traffic. The $20 million terminal building includes four mobile aerobridges, over 1000 auto parking spaces and VIP and CIP facilities.

Facilities

Overview

The airport is at an elevation of above mean sea level. It has one runway designated 05/23 with an asphalt surface measuring. The airport has two terminal buildings – one for international and one for domestic operations. Recently, it added a new facility for VIP service. The international terminal has four aerobridges built in 2003. Three more aerobridges were added during the passenger terminal expansion in 2016–2017. The airport's design capacity is 5 million people per year.

Expansion

In 2014, Cambodia Airports announced a $100 million project to expand the passenger terminals at Phnom Penh and Siem Reap international airports to accommodate continued strong passenger growth. The project saw the extension of the parking lots and terminals, more check-in and immigration counters, and new baggage handling systems. Additionally, the commercial areas were enlarged to allow for more retail shops, new restaurants and food and beverage outlets, and mezzanine lounges to cater to first class and business travellers. The expansions will allow the airport to double its capacity to handle 5 million passengers a year from 2.5 million passengers.

Airlines and destinations

Passenger

Cargo

Statistics

Ground transportation

There are a few options to transfer to or from Phnom Penh International Airport and the city. Outside the arrival hall, passengers can take a taxi provided by the Airport Taxi Association or book a ride from Grab, a ride-hailing app. In April 2018, trains operated by Royal Railway Cambodia began running express from Phnom Penh International Airport to Phnom Penh Railway Station. Trains run every 30 minutes and the journey takes roughly 30 minutes. A one-way trip costs USD$2.50. There is also the city bus and an airport express bus.

Accidents and incidents

In January 2018, the Cambodian government approved a proposal to build a new airport to serve Phnom Penh that will cost an estimated US$1.5 billion. The new international airport will replace the existing Phnom Penh International Airport, with initial plans having the facilities being constructed on partially reclaimed land adjacent to Boueng Cheung Loung, a large lake in Kandal province about 30 kilometres south of Phnom Penh.
Cambodia Airport Investment, a joint venture 90 percent owned by Overseas Cambodia Investment Corporation, one of the country’s largest real estate developers, and 10 percent by the government’s State Secretariat of Civil Aviation, plans to invest the $1.5 billion to construct the new airport. The OCIC will invest US$280 million, while unspecified "foreign banks" will provide US$1.1 billion in funding. The OCIC will own 90 per cent of the shares in the completed airport, with the rest going to the SSCA While the construction plans are still in the early stages of development, the 4F class airport will be capable of handling large long-haul aircraft and will reportedly cover an area of around 2,600 hectares, which would make it one of the largest airports in the world.