North Luzon Expressway


The North Luzon Expressway, formerly known as the North Diversion Road and Manila North Expressway , is a 4 to 8-lane limited-access toll expressway that connects Metro Manila to the provinces of the Central Luzon region in the Philippines. It is a component of Expressway 1 of the Philippine expressway network, Circumferential Road 5 and Radial Road 8 of Manila's arterial road network. It was built in the 1960s.
The expressway begins in Quezon City at the Balintawak Interchange with EDSA as a continuation of Andres Bonifacio Avenue. It then passes through Caloocan and Valenzuela in Metro Manila, and the provinces of Bulacan and Pampanga in Central Luzon. It currently ends at Mabalacat and merges with the MacArthur Highway, which continues northward into the rest of Central and Northern Luzon. The segment between Santa Rita Exit in Guiguinto and the Balintawak Interchange in Quezon City is a part of the new alignment of the N1.
The expressway, including Andres Bonifacio Avenue, has total length of 88 kilometers. The expressway segment has a length of.
Originally controlled by the Philippine National Construction Corporation, operation and maintenance of the NLEx was transferred in 2005 to NLEX Corporation, a subsidiary of Metro Pacific Investments Corporation. A major upgrade and rehabilitation was completed in February 2005 with road now having similar qualities to a modern French tollway and other entities.

Route description

North Luzon Tollway/NLEX mainline

The North Luzon Tollway or the NLEX mainline cuts northwards from Manila to the provinces of Bulacan and Pampanga. The expressway parallels MacArthur Highway from Quezon City to Mabalacat in Pampanga. It has 8 lanes from Balintawak Interchange to Balagtas Interchange, 6 lanes from Balagtas Interchange to San Fernando Exit, and 4 lanes from San Fernando to Sta. Ines Exit. The expressways has bridges that cross seven rivers. Some portions of the expressway are lined with billboards, including its viaduct portion. Various high voltage overhead power lines, most notably the Hermosa–Duhat–Balintawak transmission line of National Grid Corporation of the Philippines from Smart Connect Interchange to San Fernando Exit, utilize the significant portion of the expressway route as the densely populated areas hinder acquisition of dedicated right of way.

Balintawak-Balagtas

The expressway starts at Balintawak Interchange as a physical continuation of Bonifacio Avenue. A few meters after the cloverleaf is Quirino Highway, with a northbound left exit ascending into a flyover to the northeast. Past this exit, Reparo Road parallels the expressway from Novaliches Exit to Eternal Gardens Memorial Park. The road approaches the Balintawak toll plaza, widening to 17 lanes only serving northbound traffic. The offices of NLEX Corporation is located near the toll plaza. A new toll plaza, opened in 2017, is built between the northbound and southbound lanes, servicing Class 1 vehicles,
The expressway reverts to four lanes, continues northward, crossing Tullahan River through the Tullahan Bridge, intersects with General T. De Leon Street, and passes the Smart Connect Interchange. It then passes through industrial areas and businesses within Valenzuela. The expressway's East Service Road starts paralleling the expressway before Paso de Blas exit. The road continues on a straight route, with a Caltex service area located near the Dulalia overpass, until it enters Bulacan.
It crosses Meycauayan River and after a few meters is the Meycauayan Exit to serve its town proper. Another service road named St. Francis Service Road runs beside the expressway's southbound lanes. It passes through residential areas and institutions within the municipality, intersects with Lias Road, and continues on a straight alignment. On Marilao, there is a Petron service area and after it are the Marilao River crossing and Marilao exit. It enters Bocaue after Marilao Exit, where Ciudad de Victoria and the Philippine Arena lies to the east. The road turns eastward to serve Bocaue toll plaza, where the southbound lanes widens to 22 lanes with 4 from a parallel road making a grand total of 26 lanes, and on the middle of it is a newly built toll plaza and road. It turns westward, passes through Bocaue Exit, Santa Maria River, and Taal Bridge, and continues on a straight alignment until Balagtas Interchange. Before it are the Petron for southbound and Shell for northbound traffic. Past the Shell service area is the Tabang Spur Road and Balagtas Interchange which was opened on March 20, 2012. This is the former terminus of the original segment of the expressway from 1967 to 1976 before it is extended to Dau.

Balagtas-San Fernando

The expressway narrows to three lanes per direction past Tabang Spur Road. It continues on a straight route, traversing paddy fields on the outskirts of Guiguinto, Malolos, and Pulilan. AH26 leaves NLEX at Santa Rita Exit, where it follows Maharlika Highway, also known as
Cagayan Valley Road, to Baliuag and Cabanatuan.
A few meters after Pulilan Exit is the Candaba Viaduct. The bridge traverses rice paddies and swampland in the municipalities of Pulilan, Calumpit, Bulacan and Apalit, Pampanga, and crosses Pampanga River before the viaduct ends. The expressway continues again on a straight alignment, passing through Apalit, San Simon, Santo Tomas, and San Fernando, and crosses Abacan and San Fernando rivers. At the vicinity of San Fernando Exit are two major malls, SM City Pampanga and Robinsons Starmills Pampanga.

San Fernando-Sta.Ines

After San Fernando Exit, the expressway narrows into two lanes, both northbound and southbound. It continues as a straight roadway, passing through the rural areas of Mexico, crossing Abacan and Quitangil rivers, and traversing the eastern parts of Angeles and Mabalacat. NLEX connects with Subic–Clark–Tarlac Expressway via Clark Spur Road before the main line terminates at Santa Ines Interchange, with a toll plaza serving the exit. The segment between SCTEX and Santa Ines Exit used to be a two-lane road but has since widened into four lanes with a grass median.

Tabang Spur Road

Tabang Spur Road is a four-lane, spur road in Bulacan that branches off the NLEX mainline at Tabang Exit in Balagtas and terminates at a partial cloverleaf interchange with MacArthur Highway and Maharlika Highway at Guiguinto Exit in Guiguinto. It carried the final leg of NLEX until the present route was extended to Angeles.
The road spurs off the main line at Tabang Exit in Balagtas. It then crosses the abandoned Philippine National Railways line to Cabanatuan, traverses Barangays Tuktukan, Tabe, and Malis in Guiguinto, and crosses the Guiguinto River. It then approaches the Tabang Toll Plaza, where the road expands to 12 lanes for both westbound and eastbound motorists. The operations and management offices of Tollways Management Corporation is located near the toll plaza. A Shell station is also found next to the offices, serving eastbound motorists. At the nearby unsignalized intersection past the toll plaza, it meets St. Francis Street, which serves as an alternate route to MacArthur Highway. It ends at the partial cloverleaf interchange with MacArthur Highway and Maharlika Highway and continues to the west towards Malolos as the former.

NLEX Connect

Segments 8.1 and 9

Segment 8.1 is a four-lane, spur road that runs from the Smart Connect Interchange to Mindanao Avenue in Valenzuela City. It begins at the Smart Connect Interchange with the NLEX mainline, picking-up from where Segment 9 left off. It lies on the ground level east of the interchange. It then enters Barangay Ugong in Valenzuela, where it approaches the Mindanao Avenue toll plaza, widening to 6 lanes only serving westbound traffics, and terminates at Mindanao Avenue near the city boundary with Quezon City.
On the other hand, Segment 9 is a four-lane, spur road that runs from Smart Connect Interchange to MacArthur Highway in Karuhatan in Valenzuela City. It is the first segment of the NLEX Harbor Link project. It begins at the Smart Connect Interchange with the NLEX mainline, picking-up from where Segment 8.1 left off. Lying on the ground level west of the interchange, it then traverses Barangays Gen. T. De Leon, Parada, and Maysan. It then enters Barangay Karuhatan, where it approaches the Karuhatan Toll Plaza, exclusively for eastbound vehicles, and Segment 10 and finally terminates at MacArthur Highway.
Both Segments 8.1 and 9 are components of Circumferential Road 5 of the Metro Manila arterial road system.

Segment 10 (Harbor Link)

NLEX Harbor Link, also named NLEX Segment 10, is a four-lane, fully elevated expressway which connects with the Karuhatan Link at Valenzuela to C-3 Road in Caloocan, where two ramps carry it to the west for another and ends at Radial Road 10 in Navotas. It is the second phase of the NLEX Harbor Link project. It is designated to provide access between Port of Manila and northern Luzon. Most of the road utilizes the existing railway right of way through Caloocan, Malabon, and Valenzuela, with the road rising as high as to provide necessary clearance for the elevated Manila–Clark Railway of the Philippine National Railways.
NLEX Harbor Link begins at Karuhatan Exit with Segment 9. The section near the northern terminus traverses an industrial and residential area, which necessitated the demolition of numerous houses, buildings, and warehouses. It soon follows the railway right-of-way where it rises up to provide necessary ground clearance for the viaduct carrying the future Manila–Clark Railway. Past Samson Road and the PNR rolling stock shops in Caloocan, NLEX Harbor Link shifts to the right of the railway right of way, which also required demolition of numerous houses and buildings, including a local wet market. The expressway ends at an interchange with C-3 Road, with completed stubs to connect with the C3–R10 spur alignment which is under construction, and the future NLEX-SLEX Connector Road.
Its original stretch from Karuhatan to C-3 Road was first opened to traffic on February 28, 2019. Its C3–R10 Section was then partially opened on February 21, 2020 up to the Malabon Exit ramp to Dagat-Dagatan Avenue. Its remaining segment up to R-10 was then opened on June 15, 2020.

History

The original stretch of the expressway, from Balintawak Interchange up to Guiguinto Exit in Bulacan, was completed on August 4, 1968. It is a fully fenced limited-access highway that consisted of a four-lane rural divided roadway, nine twin bridges, one railroad overpass, seven underpasses, and three interchanges.
Originally a project of the Department of Public Works and Highways, the completion of the major portion of the job fell on the Construction Development Corporation of the Philippines to pioneer the toll concept of funding infrastructure. It was carried out under the private financing scheme provided by Republic Act 3741.
Additional work required by the government included the construction of the Balintawak – Novaliches Interchange Complex, the Tabang Interchange, and the approach road of the underpasses.

In 1976, the NLT extension, consisting of of concrete road, was built as part of a highways program of the International Bank for Reconstruction Development linking major urban centers to the production centers in the north. The project features a 4-lane limited-access highway with a five-kilometer Candaba Viaduct, a construction innovation utilizing precast beam system, 6 interchanges, 12 bridges, and overpass/underpass structures.
In 1989, under the Corazon Aquino administration, the expressway was extended by another from its terminus at Dau Exit to Sta. Ines Exit in Mabalacat, Pampanga.
From 2003 to February 2005, the expressway underwent a major rehabilitation. Works included the widening of the Balintawak – Tabang segment from 6 to 8 lanes and the Tabang–Sta. Rita segment from 4 to 6 lanes, asphalt overlay, and the demolition of old tollbooths. The main contractor of the rehabilitation work was Leighton Contractors with Egis Projects, a company belonging to the French Groupe Egis as the main subcontractor for the toll, telecommunication and traffic management systems. To help maintain the safety and quality of the expressway, various rules are in effect, such as restricting the left lane to passing vehicles only and banning overloaded trucks.
After the rehabilitation, the operation and maintenance of the expressway was transferred from the state-owned Philippine National Construction Corporation to the Manila North Tollways Corporation.
On June 5, 2010, the NLEx Segment 8.1 or the NLEX Mindanao Avenue Link was opened. The spur road is a part of the C-5 Road North Extension and is built to provide another entry point to the expressway from Metro Manila and decongest Balintawak Interchange.
On March 18, 2015, NLEX Segment 9 or the NLEX Karuhatan Link was opened, providing continuation to Segment 8.1 that runs from the other side of the Smart Connect Interchange to MacArthur Highway.
On February 28, 2019, the main stretch of NLEX Segment 10 or the NLEX Harbor Link, from NLEX Karuhatan Link to C-3 Road, was opened to traffic. On February 21, 2020, its C3–R10 Section was partially opened up to its Malabon exit ramp; the remaining section to Radial Road 10 was opened on June 15, 2020.

Future

Segment 8.2

The NLEx Segment 8.2 will be a segment that will connect the existing NLEx Segment 8.1 to C-5 Road and Commonwealth Avenue. The planned segment will at first run parallel to Republic Avenue before making a southward turn to Luzon Avenue after which it will then connect to Commonwealth Avenue. The segment will include two interchanges in Mindanao and Regalado Avenues, a roundabout connection at Congressional Avenue, and three local road crossings at Quirino Highway, Sauyo Road, and Chestnut Avenue.

Segment 11/NLEX-SLEX Connector

Plans for a construction of an elevated road to connect North Luzon Expressway and South Luzon Expressway has been bared long before the construction of Segment 10.1.
The government reportedly accepted the unsolicited proposal from Metro Pacific Tollways Development Corporation to build the road. MPTDC is a subsidiary of Metro Pacific Tollways Corporation, which runs NLEX. This would later be known as the Connector Road project, the elevated expressway will have run over the Philippine National Railways tracks until terminating to the Skyway Stage 3 Interchange.
It will be connected in the north to the existing Segment 10 towards Valenzuela. In the south, it will be linked to the Skyway Stage 3 near PUP in Santa Mesa, Manila. Once completed, the Connector Road will have four entry and exit points: C-3 Road in Caloocan, España in Sampaloc, Manila, and terminating through the Paco-Sta. Mesa Road in Santa Mesa, Manila. This project is targeted to be open to traffic by February 2022. Its construction will also take into consideration the upcoming parallel construction of the Main Line South of the Philippine National Railways as an elevated and electrified railway.
Construction of the project is estimated to cost, but as an "all-elevated" or completely grade-separated structure, right-of-way acquisition shall be reduced to an estimated cost of only. It broke ground on February 28, at the same time Segment 10.1 was inaugurated and opened to traffic, officially indicating that the NLEX Karuhatan Link and Segment 10 are mostly complete.

NLEX Phase 3

This will be a extension with three segments from the NLEX mainline, originally in San Simon, Pampanga, to Dinalupihan, Bataan, connecting to Subic–Tipo Expressway. However, the plan did not push through. It would instead start somewhere between Apalit and San Fernando in Pampanga, then will cut across Guagua and end at Dinalupihan. Though the project will start tentatively from Apalit based on the concession, the new alignment has yet to be finalized.

Technical specifications

The tollway has two sections: an open section and a closed section. The open section charges a flat toll based on vehicle class and is employed to reduce the number of toll barriers within the metropolis. The closed section is distance-based, charging based on the class of vehicle and distance traveled. When the expressway was modernized, an electronic toll collection system was set up for Class 1 vehicles while prepaid magnetic cards were assigned to Class 2 and 3 vehicles to speed up transactions at toll booths. These have since been replaced by a unified ETC system operated by Easytrip. Also, with the government's thrust towards toll road interoperability, Autosweep of the SMC Corporation which operates SLEX, Skyway, STAR, NAIAX, and TPLEX has been accepted as a mode of payment in NLEX since March 2018. As of October 1, 2011, all tolls include the 12% Value-Added Tax. With the movement of the northernmost toll gate to Sta. Ines, the NLEX and SCTEX toll systems have been merged into one combined system, with tolls for all enclosed destinations listed.
ClassOpen system
Closed system
Class 1
/km
Class 2
/km
Class 3
/km

Features

Lanes

The NLEX has 8 lanes, 4 lanes in both directions from the Balintawak to Burol segment, 6 lanes with 3 lanes for both directions on the Burol to San Fernando segment and 4 lanes with 2 lanes for both directions on the Tabang Spur and San Fernando to Santa Ines segment. Before the lane expansion project of 2016, there was even a part of the NLEX which consists of only 2 lanes, one for each direction. This segment is located after passing through the SCTEx Exit but has since been expanded into four lanes.

Speed limit

100 km/h for cars and jeepneys, 80 km/h for trucks and buses, and 60 km/h is the minimum for all classes of vehicles. Speed limits are strictly enforced via CCTV cameras and speed guns, and speeders are usually identified as soon as they hit the tollbooth.

Major upgrade

The upgrade consisted of rebuilding of roads and building new toll plazas. Launched in the beginning of 2003 and completed in February 2005, the roadway now has modern features explained above.

Drainage enhancement program

The entire stretch of the expressway underwent another rehabilitation regarding its drainage systems. The expressway is known to be flooded during the rainy season and the goal of the project is to fix the drainage systems within the road to prevent flooding. Within this period, certain lanes of the road were closed to the traffic. This in turn caused massive traffic jams along the road and the speed limit on the construction sites were reduced from 80/100 km/h to 60 km/h.
The program started on February 12, 2007 and finished on October 7, 2007.

Shareholder companies

Emergency phones and parking bays

Emergency telephone boxes are located throughout the whole length of the expressway. Parking bays are also placed on regular intervals on the expressway, for use in emergency situations.

Service areas

North Luzon Expressway has 7 service areas, mostly located on the closed toll section north of Bocaue. Each service station hosts a gas station, restaurants, and a convenience store, as well as ATMs and restrooms, car repair, and lubrication services.

Exits

Exit numbers are based on kilometer post. Exits begin at 9 because the NLEx is a logical continuation of Andres Bonifacio Avenue. Rizal Park is designated as Kilometer Zero.

North Luzon Tollway/NLEX Main

Tabang Spur Road

NLEX Connect

NLEX-SLEX Connector Road

NLEx Segment 8.2