New Livingstone Stadium


New Livingstone Stadium was a proposed multi-purpose stadium in Livingstone, Zambia, that was in the planning stages until Zambia backed out of hosting the 2011 All-Africa Games in 2009. It would have been used mostly for football matches and hosted some events for the 2011 All-Africa Games. The stadium would have hada capacity of 50,000 people. It was to be built along with new stadiums in Ndola and Lusaka.