Minto flywheel facility


The Minto Flywheel Facility for grid frequency regulation was the first in Canada.
The 2 MW flywheel storage facility in Minto Ontario, Canada opened in 2014.
The flywheel system uses 10 spinning steel flywheels on magnetic bearings.