Proposals for the Mid-Hudson span were made by state legislature in 1923. Although the Bear Mountain Bridge in Orange County, New York and the Holland Tunnel in Manhattan were under construction, there were then no fixed highway crossings south of Albany. Then-Governor of New York Alfred E. Smith signed the bill in June 1923. Construction would be undertaken by the New York State Department of Public Works. Construction began in 1925. Caissons weighing 66,000 tons were sunk into the riverbed; dirt was removed by crews working in a pressurized environment. The Gothic steel towers were constructed in April 1929. Three years after opening, ownership was transferred to the New York State Bridge Authority in 1933, shortly after the Authority was created. Then-Governor Franklin D. Roosevelt and his wife Eleanor attended the opening ceremony on August 25, 1930. The toll plaza was originally located on the eastern side of the bridge, but was moved to the western side in Ulster County when a new highway approach was opened in December 1967. Originally, tolls were collected in both directions. In August 1970, the toll was abolished for westbound drivers, and at the same time, eastbound drivers saw their tolls doubled. The tolls of eleven other New York–New Jersey and Hudson River crossings along a stretch, from the Outerbridge Crossing in the south to the Rip Van Winkle Bridge in the north, were also changed to eastbound-only at that time. The bridge was renamed the "Franklin Delano Roosevelt Mid-Hudson Bridge" in 1994. In 2009, composer Joseph Bertolozzi completed Bridge Music, a project which allows listeners to hear the Mid-Hudson bridge played like a musical instrument. The work was created for New York's 400th anniversary observance of Henry Hudson's voyage up the Hudson. Originally intended to be a live performance piece, this "audacious plan" to compose music for a suspension bridge using the bridge itself as the instrument brought Bertolozzi wide international attention. A recording of the results, the 2009 CD "Bridge Music", entered the Billboard Classical Crossover Music Chart at #18, and has been released globally.
Description
The bridge is long with a clearance of above the Hudson. At opening, it was the sixth-longest suspension bridge in the world. The chief engineer was Polish immigrant Ralph Modjeski, who had previously engineered the strengthening of the nearby Poughkeepsie Railroad bridge. Primary contractor was the American Bridge Company of Ambridge, Pennsylvania with steel from Carnegie. The span contains stiffening trusses intentionally constructed on top of the deck instead of below the deck. The bridge carries three lanes of US 44 and NY 55 and a pedestrian/bicycle walkway over the Hudson. The bridge allows connections to US 9 on the east side, and US 9W to the west. The center lane is generally closed, except for rush hour traffic eastbound from 6am to 9am, and westbound from 3pm to 6pm. The center lane is also occasionally opened when work is being done on either side of the bridge. Five lane signals indicate which lanes are open for travel. Approaches on either side of the bridge are four lanes, causing a bottleneck going onto the one- or two-lane span. The bridge has a computer-controlled LED decorative lighting system attached to the suspension cables, allowing the bridge to be decorated for Christmas or the Fourth of July, and for other holidays.