Metro Manila Dream Plan
îThe Metro Manila Dream Plan, formally titled the Roadmap for Transport Infrastructure Development for Metro Manila and Its Surrounding Areas, refers to an integrated plan for improving the transport system in Metro Manila, Philippines, with the hope of turning it into a focal point for addressing Metro Manila's interlinked problems in the areas of transportation, land use, and environment.
Consisting of a list of short term priority projects and medium to long term projects lasting up to 2030, the Dream Plan was created on the basis of recommendations from a study conducted by the Japan International Cooperation Agency and was approved the National Economic and Development Authority Board in June 2014. The roadmap is thus sometimes also referred to as the "JICA Dream Plan", or the "NEDA Dream Plan".
Strategies and goals
Problems to be addressed
The Dream Plan identified three interrelated problems development in Metro Manila would have to address:- Traffic congestion,
- Land use, specifically the lack of affordable housing and the presence of slum/squatter areas, and
- Environmental risks to urban settlements in areas prone to natural disasters such as floods, earthquakes, typhoons, landslides, etc.
Core philosophies
Sector integration refers to an approach that views various problematic aspects of Metro Manila's urban development as interrelated, and addressing them as such. The plan identifies critical sectors as traffic flow, settlement in hazardous areas, and overpopulation, and thus it seeks integrated approaches for "accommodat people in need of affordable housing free from hazard risks and traffic congestion."
Spatial integration refers to an approach that expands the search for solutions to Metro Manila's problems to integrate areas outside its current boundaries - looking towards creating new centers of urban growth and linking them efficiently, allowing for the management of population growth and urban expansion in a sustainable manner. Specifically, the dream plan seeks to create new growth areas in Central Luzon, with the new Clark Green City at its core, and Calabarzon, with the Batangas and Lucena port areas as core focal points.
Finally, institutional integration, refers to the need for strengthen and coordinate actions among local government units and regions.
Objectives, or "Five Nos"
The Dream Plan expresses its goals in terms of five key problems which it aims to definitively address, which it calls "5 Nos":- No Traffic Congestion;
- No Households Living in Hazardous Conditions;
- No Barriers for Seamless Mobility;
- No Excessive Cost Burden for Low Income Groups; and
- No Air Pollution.
Regional Integration Strategy
Specifically, this means
- Restricting further urban expansion in the Marikina Valley, defining the mountains of Rizal and the shore of Laguna de Bay as an eco-zone on the east side of the Greater Capital Region;
- Restricting further urban expansion along the northern and southern coasts of manila bay, retaining only the existing port area as a transportation hub, effectively making Manila bay another eco-zone, this time on the west side of the Greater Capital Region;
- Controlling urban expansion using careful planning of new urban centers to the south of Manila, with a hierarchical development strategy in mind.
Greater Capital Region
This strategy expands the metropolitan area into what the plan refers to as a "Greater Capital Region", which would incorporate the present National Capital Region, Region III, and Region IV-A.Controlled creation of new urban centers
Instead of being centered solely on the City of Manila, the Dream Plan proposes that the new system move towards new centers of economic growth connected via an efficient high capacity high quality transport backbone. This would be defined by five growth center clusters: The existing Metro Manila cluster, a North Regional Growth Center based on gateway sea and airports in Region III, a South Regional Growth Center based on gateway seaports in Region IV-A, a two sub-regional growth centers to the immediate north and immediate south of the Manila cluster, respectively.Metro Manila
The Metro Manila cluster would be formed by the existing NCR, plus nearby urban centers such as Antipolo, Bacoor, and Imus. Efforts in this particular cluster would focus on inner city redevelopment or revitalization, and the rehabilitation of disaster prone areas.North Regional Growth Center (Subic-Clark-Tarlac)
The North Regional Growth Center cluster would be formed primarily by the Subic-Clark-Tarlac urban areas to the west, and then secondarily by urban centers of Cabanatuan and Gapan to the east.Development in this cluster would be centered on the new Clark Green City, the gateway seaport at Subic, and the Clark airport. Additional urban centers identified in this cluster include Tarlac City in Tarlac, San Fernando and Lubao in Pampanga,
Cabanatuan and Gapan in Nueva Ecija.
South Regional Growth Center Region (Batangas and Lucena)
The South Regional Growth Center cluster would be formed by the urban centers of Batangas City and Lucena.Development in this cluster would be centered on gateway seaports at Batangas and Lucena. Additional urban centers identified in this cluster include Lipa and Tanauan in Batangas, and Tayabas in Quezon.
North Sub-regional Growth Center (Bulacan)
The North Sub-regional Growth Center cluster would be formed by new urban development in Bulacan.Development efforts in this area would be focused on planned urban expansion in the form of affordable housing for informal settlers. Malolos is projected to be the major urban core area in the Bulacan Sub-regional Growth Center, with other identified urban centers including Baliuag, San Jose del Monte, and Meycauayan.
South Sub-regional Growth Center (Cavite-Laguna)
The South Sub-regional Growth Center cluster would be formed by new urban development in Cavite, Laguna, and some parts of Batangas.Development efforts in this area would be focused on planned urban expansion in the form of affordable housing for informal settlers. Calamba is projected to be the major urban core area in this sub-regional growth cluster, with other identified urban centers including San Pedro, Sta. Rosa, Biñan, Cabuyao, and San Pablo in Laguna, and Trece Martires and Tagaytay in Cavite.
Development of new gateway ports
Subic, Batangas, and Lucena Seaports
When the transport backbones are in place, the dream plan calls for the cargo-handling function of Metro Manila's ports to be shifted to Subic and Batangas, which would be achieved by limiting the future expansion of the existing Manila ports and then providing incentives for shipping companies to use the Subic and Batangas ports. The dream plan also calls for the expansion of the Lucena seaport, complementing the load of the Batangas seaport.NAIA, Clark, and New NAIA Airports
The dream plan also proposes the development of two new gateway airports - one in Clark which would serve as a gateway airport for the central and northern cluster, and a "New NAIA" which would be based outside of the existing urban area.Before this "New NAIA" is in place, it proposes the improvement of the existing NAIA and the utilization of the Sangley point Runway. It also suggests the improvement of Clark, which would serve as an alternative to NAIA.
Once the New NAIA is in place, it suggests that the current NAIA could be converted into a new central business district.
Reorienting Mega Manila's road network structure
Evolving from a plan first developed in the late 1970s, Metro Manila's transport system currently follows a radial-circumferential system, with the City of Manila at its center and with Circumferential Road 5 and Circumferential Road 6 at its outer boundaries. The Dream Plan takes the existing radial-circumferential system and proposes a ladder-form structure connecting the existing urban core with new urban centers along a north–south axis.Existing Radial-Circumferential System
The plan calls for the rehabilitation of the existing radial-circumferential system, and the completion of links in that system which for different reasons have never been built. Connections in need of completion most notably include the Pasig River connections of C3 and the southern linkages of C5 towards Cavite and the South Skyway. Major renovations most notably include those on EDSA.Connector expressways as a north-south transport backbone
The plan also calls for a transport backbone in the form of intra-city expressways that would connect NLEx with SLEx, decongesting traffic on non-toll highways in the existing metropolitan area by allowing north–south travel without having to pass through Manila streets, and by creating alternative routes for travelers who are willing to pay for faster flow of traffic. Also critical is the connection these expressways would create between the new gateway ports of the North and South Regional Growth centers proposed by the plan.Suburban railways as a north-south transport backbone
The plan also calls for a transport backbone in the form of suburban railways, which would become the primary connector between Regional Growth Centers and the Sub-Regional Growth Centers defined by peri-urban development north and south of Manila.2030 Dream Plan Main Components
The plan is organized into five components: at-grade urban roads; main roads/expressways network; urban and suburban rail network; road-based public transport; and traffic management strengthening.At-grade urban roads
The at-grade roads component of the dream plan calls for the systematic expansion of Manila's main roads network, including:- The completion of missing links such as bridges or unfinished stretches of roads in the existing road networks, most notably the middle portion Circumferential Road 3 across the Pasig river, and the south portion Circumferential Road 5 connecting to the Metro Manila Skyway and to Cavite Coastal Road.
- The creation of 137 km of new roads,
- Flyovers,
- Sidewalks and pedestrian facilities, and
- the expansion of secondary roads in periurban areas.
Toll Expressways
The plan intends for these toll expressways to decongest traffic on the main roads by providing an option to those road users willing to pay a toll fee in exchange for faster travel time.
The plan calls for the construction of 426 km ofIntercity expressway, and 78 km of Urban expressway.
Urban/Suburban Rail
The plan calls for the expansion of Manila's urban and suburban rail network.It proposes a 246 km main rail network consisting of 6 lines, and a 72 km secondary rail network made up of 5 lines.
Another important aspect of this component of the dream plan is integrated lines and improved accessibility.
Prominent projects under this component include:
- A North-South Commuter Rail from Malolos to Calamba
- A significant expansion of existing rail lines and construction of new ones like:
- *Line 1 South Extension
- *Line 2 East and West Extensions
- *Line 4
- *Line 5
- *Line 6
- *Line 7
- *Line 8
- *Line 9
North-South Commuter Rail (Clark-Calamba)
The plan calls for the rail to have no level crossings at main roads, and for at-grade freight long-haul trains be developed beneath the elevated railway. It is expected that the creation of this rail line will promote urban growth along a north–south axis, further promoting the development of the North and South Regional Growth Centers.
Metro Manila Subway (Mindanao Avenue NLEX – Taguig ITX - NAIA)
The Metro Manila Subway proposed by the dream plan will be a 58 km subway which will serve as a second north–south mass transit backbone for the newly expanded Greater Capital Region.Since its path hews close to much of EDSA, it is expected to dramatically improve mobility and accessibility along that critical route. It is also expected that the creation of this subway line will promote urban growth along a north–south axis, further promoting the development of the North and South Regional Growth Centers.
A preliminary study for the Metro Manila Subway was done during the course of the main Roadmap Study from 2013-2014, and the DPWH has announced that it expects to complete a master plan for the subway within 2015.
The first 25-kilometer railway will have 12 stations, namely, Mindanao Avenue, Tandang Sora, North Avenue, Quezon Avenue, Anonas, Katipunan, Ortigas North, Ortigas South, Kalayaan Avenue, Bonifacio Global City, FTI and NAIA.
Road-based public transport
The "road-based public transport" component of the dream plan concerns itself mostly with Buses and Jeepneys. It proposes:- The modernization of the vehicles and the system by which they are operated,
- A rationalization of the public transport route structure, and
- Improved terminals and interchange facilities
Traffic management
- traffic engineering,
- traffic enforcement, and
- traffic education.
Short Term Program (2014-2016)
At-grade urban roads network
Projects under the short term program of the dream plan's at-grade urban roads component include highways and secondary urban roads. A number of the projects identified in the short term program were actually already ongoing when the plan was approved by the NEDA, having already previously been identified as critical infrastructure projects.Highways
Other Roads
- Secondary Road Packages
- Preparatory Studies for Several Projects
- Other Central Luzon Road Projects
- Other Southern Luzon Road Projects
Toll Expressway Network
Urban and suburban rail network
Project | Description | Status |
Line 1 South Extension Phase 1 | ||
Line 6 | ||
Line 2 East Extension Project | ||
Line 2 West Extension Project | ||
Line 3 Capacity Expansion Project | ||
Line 7 | ||
Automated Fare Collection System | Common ticketing system for all the mass rapid transit lines except for the Philippine National Railways. | |
Line 1 Rehabilitation | ||
Line 2 Rehabilitation | ||
Line 3 Rehabilitation | ||
PNR North-South Commuter Rail | Includes construction of Manila-Clark line, rehabilitation of the Manila-Calamba-Los Baños line, and the reconstruction of the Calamba-Batangas City line. | |
Line 9 | Groundbreaking was held on February 27, 2019. First three stations to be operational by 2022 and the rest of the line in 2025. |
It also calls for a "Metro Manila Central Business District Transit System Study."
Road-based public transport network
Projects under the short term program of the dream plan's road-based public transport component include:- Three Integrated Provincial Bus Terminals ;
- Public Road Passenger Transport Reform Study;
- Bus Rapid Transit System 1; and
- Bus and Jeepney Modernization Programs
Traffic management strengthening
The plan recommends a comprehensive traffic management study to cover these interconnected aspects of traffic management.
Action Plan for Gateway Seaports and Airports
The dream plan also includes a short term action plan for the development of seaports and airports, which includes:- The implementation of already-committed improvement packages for NAIA and Clark;
- The placement of a cap for the expansion of Manila seaports;
- The creation of an incentives system for diverting port activities to Batangas and Subic seaports; and
- The conduct of studies for
- * the development of a "New NAIA" and
- * the redevelopment of the Manila Port Area
JICA Study