Mashhad Urban Railway


Mashhad Urban Railway is a rapid transit urban rail line in Mashhad, Iran. It is the second rapid transit system in Iran. The project has been known by a number of terms, including "light rail" or "light metro" and "urban rail" or "metro", though the system's full-grade separation from traffic and five-minute headway fully qualify it as a rapid transit or "metro" system. Mashhad Urban Railway operates its line 1 from 6 to 22:00 daily. Construction of the second line which is a metro line is ongoing. Limited operation of the first phase of line 2, with and 9 stations, had just begun in Feb 2017. tunnel excavation of the first phase of line 3 was started in 2015.
Construction of line 1 began in 1999, with the inauguration of Line 1 taking place on 24 April 2011.

Network

Line 1

The, 22 station Line 1 was the first line to be built; it opened for service on 24 April 2011. Line 1 runs between Nakhrisi in the east and Vakilabad in the southwest, with travel time of 41 minutes. Approximately half the route is in tunnels; the rest is at ground level.

Line 1 Expansion

Expansion of Line 1 added of underground railroads and 2 stations, connecting Mashhad International Airport to the Mashhad Urban Railway. Line 1 reached a total of 24 stations along of track, as in tunnels plus on-ground, and a ridership capacity of 170,000 passengers per day, along with daily operation between 6 AM and 10 PM.
Also making Mashhad the first city in Iran to have a Metro system connected to an Airport.

Line 2

Line 2 is a conventional heavy metro, running north–south for between Koohsangi and Tabarsi with 13 stations, Excavation was done by two Tunnel Boring Machines. From Feb 2017 limited operation of the first phase of line 2 began. Mashhad urban railway system is connected to the inter-urban railway system in Rahahan Station. On 20 March 2018 pilot operation of the first interchange station in Mashhad railway system was started. On 7 May 2018
Iranian President Hassan Rouhani took part in the inauguration ceremony of the first Mashhad Urban Railway interchange station "Shariati" which connects line 1 and 2. On July 27th, 2019 Shahid Kaveh Station Operation Began.currently, line 2 operates everyday with 13.5 km and 12 stations from 6 AM to 10 PM and the current headway is 10 minutes.

Line 3

Line 3's construction has begun, with TBMs doing the excavation. Currently more than excavation has been finished.

Further Development

Another additional line is planned. Line 4 with length has been approved, and the studies for line 4 are reaching completion and final approval level. Tunnel Excavation of Line 4 will begin in Summer 2020.

Rolling stock

A fleet of 60low-floor LRVs was ordered from Chinese Changchun Railway Vehicles for line 1. These mark the first time that light rail vehicles have been exported to a customer outside China.
A fleet of 100 metro trains has been ordered to CNR. 85 of them will be assembled in Iran by TWM. Currently, 70 of them are delivered and in-service condition.