M12 motorway (Great Britain)


The M12 motorway was a planned motorway starting in north-east London and joining the A12 road in Essex. The 1960s scheme would have started at a junction with the M11 motorway and North Circular and ended near Brentwood, Chelmsford, or at the proposed new Maplin Sands airport; the motorway was part of the ambitious London Ringways plan to build motorways throughout London. Although most of the Ringways plan was cancelled in 1969 the M12 motorway project was still included in the Roads for Prosperity white paper published in 1989 along with major proposed developments to the A12 road. It was not formally cancelled until 30 March 1994 by the Secretary of State for Transport, John MacGregor.

Routes

There were three main route proposals:
  1. South Woodford to Brentwood
  2. South Woodford to a proposed new London Airport at Maplin Sands
  3. South Woodford to Chelmsford
The motorway would have started in South Woodford creating a junction with the North Circular at the start of the current M11 motorway. It was intended that the North Circular would also be upgraded as Ringway 2 to motorway standard around London and be designated as the M15 motorway. It was also intended that the M11 would continue further into London joining Ringway 1 and then into Islington as 'Eastway'. Due to the cancellation and the scaling back of London Ringways during the 1970s, few these ambitious plans were realised except of East Cross Route which was part of Ringway 1 and the M11 Link road which was opened in 1999 despite considerable opposition from the M11 link road protest.
Land was set aside for the later construction of the M12 interchange when the southern end of the M11 was constructed in the 1970s – the current carriageways of the M11 at the junction with the A406 would have been slip roads between these two routes. The start of the M12 would have been between the existing M11 lanes. Evidence for this can be seen on the ground:
From South Woodford the M12 would have headed east over what is still mostly open land north of Clayhall and south of Hainault then north-east to Havering-atte-Bower then east towards South Weald, meeting the M25 motorway a little north of junction 28. The motorway would have ended a short distance beyond the M25 on the Brentwood Bypass.

South Woodford to [Maplin Sands]

The alignment of this route was not finalised before the proposed airport at Maplin Sands was cancelled, but it would have matched the South Woodford-Brentwood alignment to Havering-atte-Bower. The M12 would most probably have then headed south-east and then south to pass east of Harold Hill parallel with the M25 as far as junction 29 where it would have turned east to run north of the A127 passing to the north of Basildon, south of Wickford and to the north of Rayleigh and Southend-on-Sea before heading out into the North Sea to the artificial island that was to be constructed on Maplin Sands for the proposed airport.

South Woodford to Chelmsford

The M12 to Chelmsford would have run on the alignment previously described to Havering-atte-Bower, then continued north-east to meet the M25 south of Wattons Green at the administrative boundary between Greater London and Essex. The motorway would have passed north of Pilgrims Hatch and south of Doddinghurst to meet the A12 at its junction with the A414 south of Chelmsford.