Long Beach Naval Shipyard


The Long Beach Naval Shipyard, which closed in 1997, was located on Terminal Island between the city of Long Beach and the San Pedro district of Los Angeles, approximately 23 miles south of the Los Angeles International Airport. The primary role of NSY Long Beach at the time of its closure was overhaul and maintenance of conventionally-powered US Navy surface ships, but it also had served as the homeport for several auxiliary ships during its operating history.

LBNSY description

The Long Beach NSY industrial area encompassed of the total owned. There were 120 permanent, 39 semi-permanent, and 6 temporary buildings, for a total of 165 buildings. There were 17 different shop work areas and of covered building space. The shipyard had three graving docks, and five industrial piers. There were of ship berthing space. Crane capacity ranged from to and from to .
One of the large cranes at Long Beach NSY, YD-171, was nicknamed "Herman the German" based on its origin as a floating crane for the Kriegsmarine. It is a large self-propelled crane standing tall with a lifting capacity of, and was claimed to be the largest floating crane in operation as of 1957. "Herman the German" was seized as a war prize following the end of World War II. "Herman" was dismantled and transported across the Atlantic through the Panama Canal to Long Beach, where it subsequently served at the Long Beach NSY from 1946 to 1996. While serving at Long Beach, it participated in the refurbishment of the battleships USS Missouri and New Jersey in the 1980s and lifted the Hughes H-4 from its original hangar in Long Beach when it was relocated to its geodesic dome from 1980 to 1982 for tourist display by the Wrather Corporation. Following the closure of the shipyard, the crane was sold to the Panama Canal Commission and was transported on the semi-submersible ship "Sea Swan" to the Panama Canal Zone, where it currently serves as the floating crane "Titan".
Dry Dock 1 had plan dimensions of, and Dry Docks 2 and 3 and plan dimensions of.
The total naval presence on Terminal Island included two installations, for a total of on Terminal Island and of off-base housing. Half to two-thirds of the area of the finished NSY was built on new fill, so structures were supported on piles.

History

Navy presence on Terminal Island started in 1938. The Terminal Island Naval Dry Docks were authorized in June 1940, and construction began in August 1940 on one large drydock and two smaller docks. Recreation facilities, personnel and shop buildings were ordered in February 1942, and work began on Drydocks 2 and 3 and several piers in April 1942. On 9 February 1943, the Secretary of the Navy established the facilities as the US Naval Dry Docks, Roosevelt Base, California. Also in 1943, a barrack for Marines was built, work began on another approach pier, a drydock crane was erected, and several shop buildings were started. In 1944, work started on the pontoons destined to be used in a "temporary" bridge to Terminal Island. The pontoon bridge would not be removed until the opening of the Gerald Desmond Bridge in 1968. The name of this facility was changed to Terminal Island Naval Shipyard on 30 November 1945. On 15 November 1946, the adjoining Naval Station Long Beach was established. The shipyard was renamed to Long Beach Naval Shipyard in March 1948.
During World War II, the naval dry docks provided routine and battle damage repairs to a parade of tankers, cargo ships, troop transports, destroyers, and cruisers. Peak employment of 16,091 civilian employees was reached in August 1945.
Long Beach NSY was equipped with facilities and skills to perform all non-nuclear structural, sheet metal, boiler, rigging, electronics, electrical, insulating, lagging, ordnance, sandblasting, welding, machining, woodworking, painting, pipe fitting, and other work pertaining to the overhaul and repair of surface ships. The shipyard possessed complete design, engineering, combat systems, quality assurance, planning and public works capabilities to support its industrial work. Dry dock No. 1 was designated the West Coast nuclear powered aircraft carrier emergency dry dock.
Long Beach NSY was placed in an inactive status on 1 June 1950. The Korean War began less than one month later, and the shipyard was reactivated on 4 January 1951.
Through the years the shipyard accomplished several special projects in addition to its primary mission. These included support or scientific projects in conjunction with programs like POLARIS, POSEIDON, and SEALAB.

Closure

Long Beach NSY was evaluated under every round of Base Realignment and Closure for possible closure since the inception of the BRAC process in 1988. In 1993, California congressmen Horn and Rohrabacher cited the military value of the shipyard in a successful attempt to keep it open. Mare Island NSY was closed following the 1993 evaluations, and the vote in favor of keeping LBNSY open was narrowly decided by the BRAC Commission chairman's tiebreaking vote.
However, two years later, the naval shipyard was recommended for closure in the 1995 round of BRAC evaluations by then-Defense Secretary William Perry. Although the commission toured Long Beach NSY in April 1995, the BRAC Commission elected not to override the recommendation to close Long Beach NSY, and closure was completed on 30 September 1997. By 2004, 72% of the land had been turned over to the City of Long Beach by the military.

Civilian use

In 1997, COSCO wanted to lease the space from the City, including building a $400 million cargo terminal. It was opposed by Rush Limbaugh, as the company was owned by the Communist run People's Republic of China, and was being reviewed for national security by the Department of Defense.
After review by the DoD and CIA, the lease went through, at an agreed-upon payment of $14.5 million per year from the Chinese, with renewal scheduled after ten years. However, continued controversy and opposition by Republican lawmakers caused cancellation of the lease, and the new cargo terminal, which was in fact built by the Long Beach Harbor Department, was leased to Hanjin Shipping, a South Korean firm. Hanjin was the majority partner in Total Terminals International, which was the primary tenant at Pier T until the financial collapse of Hanjin in August 2016. Hanjin entered talks to sell its stake in the Long Beach Terminal to its minority partner in TTI, Mediterranean Shipping Company in October 2016.