There once were four direct railway routes between Liverpool and Manchester in the North West of England, however only two remain, the two centre routes of the four. The most northerly and the most southerly of the four routes are no longer direct lines. Of the remaining two direct routes, the northern route of the two is fully electric with the now southern route a diesel-only line. The most northerly of the four, has been split into two routes, with the western section operated by Merseyrail electric trains and the eastern section by diesel trains, requiring passengers to change trains between the two cities. The fourth route, the most southerly of the four, has been largely abandoned east of Warrington, with the remaining section mostly catering for freight trains.
The remaining two direct routes are:
The northern route runs from Liverpool Lime Street station, via and, and continues to either or. The line follows George Stephenson's original 32-mile Liverpool and Manchester Railway of 1830, which was the world's first inter-city passenger railway and the first to have run 'scheduled' services. Many early steam locomotives were initially used on this line including Stephenson's Rocket, which won the Rainhill Trials in 1829. The line also includes a number of listed structures including stations and bridges, particularly the Rainhill Skew Bridge and the nine-arch Sankey Viaduct. The line uses Class 319 electric EMU units.

Current services

Following completion of electrification in May 2015, services to and Manchester Victoria are operated by Class 319 4-Car Electric Multiple Units or Class 323 3-Car Electric Multiple Units.
An hourly semi-fast service is operated by Northern Trains, from to, via,,,, , Manchester Airport and Wilmslow.
Northern Trains also operates an hourly service calling at all stations along the line between Liverpool Lime Street and.
This 'stopping service' is supplemented by an additional all-stations service between Liverpool Lime Street and, which continues along the West Coast Main Line to.
Between Earlestown and Manchester Piccadilly, there are additional hourly services operated by Transport for Wales, which originate from via the North Wales Coast Line and.
On Sundays there is one train per hour along the line, calling at all stations to Manchester Piccadilly except and. It is operated by Northern and continues to Manchester Airport.
Northern Trains is the dominant operator on the route, and its services are operated with Class 319 4-Car EMUs or Class 150, Class 156 and Class 142 Diesel Multiple Units. Transport for Wales services between Earlestown and Manchester Piccadilly are usually operated by Class 175 DMUs, but Class 158 units may be substituted on occasions.
From the May 2014 timetable change, a new hourly First TransPennine Express service from Newcastle Central to Liverpool Lime Street via York, Leeds, Huddersfield and Manchester Victoria was introduced. This service is operated by Class 185 DMUs and runs non-stop between Manchester Victoria and Liverpool Lime Street.
From the May 2018 timetable change, all TransPennine Express services to/from Liverpool now operate via the Northern route. After Manchester, the services usually go on to either Newcastle, Scarborough, York or Middlesbrough. They previously used the unelectrified Southern route, via Warrington Central. All TransPennine Express services are operated by Class 185 DMUs.
The northern Liverpool to Manchester route is also used by East Midlands Railway for empty coaching stock movements, and as a diversionary route when the southern route is closed.
In past years, the line has been used by many express services which included through trains to, and Newcastle, and to, and Edinburgh. Local trains also ran to Manchester via Leigh, but these services ceased in 1969 when the Eccles-Tyldesley-Leigh-Kenyon branch was closed as a result of the Beeching Axe. The northern Liverpool to Manchester line has also seen regular use over the years for diverted services from the West Coast Main Line when parts of the latter have been closed for engineering work, but diversions via Manchester instead have now become more common as they do not involve the train reversing, as would be necessary at Edge Hill, following the electrification of the route.

Technical details

The key junctions on this route are:
During a journey trains are controlled by:
The above is likely to change in the future as various sections are migrated over to the control of the new Manchester Rail Operating Centre at Ashburys.

Electrification

From 5 March 2015, Class 319 trains started electric operation on this route from Liverpool to Manchester Airport via the Oxford Road viaduct. Manchester Victoria station itself is now electrified and at the new timetable changeover on 17 May 2015 Liverpool to Manchester Victoria stopping services also began electric operation using the same rolling stock.
As a result of completion of the Manchester Castlefield Junction to Newton-le-Willows Junction electrification, TransPennine Express services between and / now use new Class 350 EMUs and are re-routed along a portion of the northern Liverpool to Manchester route before joining the West Coast Main Line at Golborne Junction.
TransPennine Express Class 185 DMUs which formerly operated the Manchester Airport - Glasgow/Edinburgh service are now being redeployed to other routes.
The Department for Transport initially announced in July 2009 that the northern route of the Manchester to Liverpool line was to be electrified
with 25 kV, 50 Hz AC, overhead line. The electrification process was originally due to be completed by 2013 however, following a change of government in 2010, the work was delayed by the government meaning that, while the Manchester to Newton-le-Willows section was completed by December 2013 to enable Manchester - Scotland electric services, the remaining section to Liverpool was not completed until 5 March 2015. Now that the electrification of the line is complete and electric services are running, the journey time between Liverpool and Manchester has been reduced from around 45 minutes to 30 minutes due to the greater acceleration achieved by electric trains and the raising of the speed limit along the line from 75 to 90 mph. Class 319 EMUs have been fully refurbished and transferred from the Thameslink route to operate between Liverpool and Manchester, while Thameslink services will be operated by new energy-efficient trains, which were originally due to be delivered between 2011 and 2013.
Electrification also offers electric haulage options for freight trains, giving a secondary route to the West Coast Main Line from Liverpool.

Southern route (old Cheshire Lines Committee line)

The southern route runs from Liverpool Lime Street via to. There are four passenger trains per hour in each direction between Liverpool and Manchester, which are usually operated by a variety of Class 185, Class 150, Class 156, Class 158 and Class 142 Diesel Multiple Units. These services are run by a number of rail companies and the time intervals are not evenly spaced out; there are large gaps between some services, and at other times trains leave within minutes of each other. TransPennine Express uses modern Class 185 trains, while other operators run a mixture of older rolling stock. While TransPennine Express' once per hour service generally take 45 minutes to reach Manchester from Liverpool Lime Street, some Northern services take an hour and ten minutes to cover the 35 miles. This route is busier than the northern route in terms of service frequency.
The line's newest station is Liverpool South Parkway which opened in June 2006 after its estimated construction cost of £16 million had doubled to £32 million by the time it was completed. This station replaced and Garston stations and has frequent bus links to Liverpool John Lennon Airport. Warrington West railway station was opened in December 2019.
Originally this line ran from High Level terminus station to terminus station built by the Cheshire Lines Committee in 1873. High Level station was demolished in 1973 due to all the long haul distance services on Merseyside being concentrated at with Merseyrail operating the local urban services with underground stations in Liverpool and Birkenhead centres. Manchester Central closed in 1969 and is now the Manchester Central Convention Complex.
At the Liverpool end, the line from Hunts Cross to Central High Level station—which accessed the station via a tunnel—was given over to the Northern Line of the electric Merseyrail services and the line from Hunts Cross diverted in 1966 onto the short section of the West Coast Main Line to Lime Street station. The divergence is at Allerton Junction to the immediate south east of.
In 1977-8 the original line in the tunnel approaching Liverpool Central High Level terminus was dropped into a new lower level tunnel immediately south of the station to enter Liverpool Central underground station becoming a through line continuing underground to the north of Liverpool and onto Southport. The Low Level underground station and tunnel was built in 1890 to align with the approach tunnel to the High Level station if in the future the need was there. Victorian foresight was utilised nearly 80 years later.
At the Manchester end the line was diverted to and Manchester Piccadilly after Manchester Central was closed.
The Liverpool to Warrington section of this line was initially scheduled to be on the Merseyrail electric urban network. The Strategic Plan for the North West, the SPNW, in 1973 envisaged that the Outer Loop which was to be an orbital line circling the city of Liverpool, the Edge Hill Spur which is a tunnel connecting the east of Liverpool to the central underground sections, and the lines to St. Helens, Wigan and Warrington would be electrified and all integrated into Merseyrail by 1991. This meant that trains from Warrington would access Liverpool city centre's underground stations via the Northern Line and Liverpool Central underground station, giving access to Liverpool's shopping and business quarters. This never transpired, however is a long-term aspiration of Merseytravel.

Planned electrification

Trains run on electrified track within the cities of Liverpool and Manchester, however only diesel engine propulsion is used taking no advantage of the electrification. This line has been prioritised for full electrification between the two cities, however no date has been set for the commencement of works.

Current services

Presently, a half-hourly fast service operates between Liverpool Lime Street and Manchester Piccadilly, calling at Warrington Central and Manchester Oxford Road. One train per hour is operated by East Midlands Railway. East Midlands Railway' services usually also stop at Liverpool South Parkway and, and continue beyond Manchester to via Sheffield and, Since the May 2018 timetable change, TransPennine Express no longer operate on the route, and now use the Northern Liverpool - Manchester Line, via Newton-le-Willows
There are also several local services per hour operated by Northern Trains along the southern route to Manchester Oxford Road, which extend to Manchester Piccadilly and Manchester Airport every hour. Many intermediate stations are served by all of these trains, although some just by one per hour, while, and are served only once every 2 hours outside peak periods. The Sunday service is two trains per hour, with one service calling at all stations and one running semi-fast.
East Midlands Railway mainly use Class 158s along the line, although Class 153s and Class 156s are used sometimes. Northern Trains operate a mixture of Class 156, Class 150 and Class 142 units along the line.
In the past, the CLC route was used by a variety of local services in addition to limited-stop expresses between the two cities. These included trains between Warrington Central and, Liverpool and Manchester to and even Liverpool to via, although the latter route was closed as long ago as 1952. The diversion of Liverpool-bound trains to Lime Street in 1966 and the closure of Manchester Central in 1969 saw the route downgraded in importance and from then until the mid-1980s it was operated as a self-contained route due to congestion issues at the Manchester end. The service frequency was also lower than at present, for example the British Rail 1985 timetable had one semi-fast and one stopping train per hour in each direction on weekdays. Through running to destinations east of Manchester via this route only began on a regular basis in 1986, when the opening of a new connection at allowed trains from the Sheffield direction to run via Stockport and thus avoid conflicting movements across the station throat at Piccadilly.
The route from Liverpool to Manchester via Newton le Willows has been popular in recent years with steam locomotive worked excursion trains. The 2nd route from Liverpool through Hunts Cross and Warrington Central to Manchester rarely sees steam worked excursion trains, the most recent being in 2013 for the 45th anniversary special run of the Fifteen Guinea Special. The original route through Newton le Willows being shut for electrification work.

Technical details

The key junctions on this route are:
During a journey trains are controlled by:
The above is likely to change in the future as various sections are migrated over to the control of the new Manchester Rail Operating Centre at Ashburys.

Former direct routes

Via Kirkby (L&YR/LMR)

It is possible to travel between Liverpool and Manchester, with a change of train from underground station via Kirkby and Wigan Wallgate to. However, since 1977, this line requires a change at Kirkby, using the same platform, to change from the Merseyrail electric Northern Line trains to the Northern diesel trains. Sections of this route were built by the Lancashire and Yorkshire Railway and their acquired railways, such as the Liverpool and Bury Railway and the Manchester and Southport Railway.
This line was partially built by the Liverpool and Bury Railway, opening in 1848, which later merged into the Lancashire and Yorkshire Railway who on acquisition owned the Manchester and Southport Railway which formed the complete continuous line from Liverpool into Manchester. The route was continuous from Liverpool Exchange terminus to. With the creation of the electric Merseyrail urban network the line was effectively cut into two with two different modes of traction. The Liverpool half is fast third rail electric and the Manchester side slower diesel traction. The point at which the two modes meet is Kirkby which functions as a terminus for the electric and diesel services.
The Merseyrail terminus at the Liverpool end of the line was extended from Liverpool Exchange to underground Liverpool Central. With the closure of Liverpool Exchange terminus station in 1977, the terminus at the Liverpool end of the diesel service was cut back to Kirkby station. Passengers from Manchester alight at Kirkby walk down the same platform boarding a Liverpool bound electric train terminating at Liverpool's underground Central station. The diesel train from Manchester is scheduled to meet a Merseyrail electric train from Liverpool at Kirkby for ease of passenger transfers. A new underground through station was built at Moorfields replacing some of the services of nearby Liverpool Exchange terminus station.
At 37 miles this route is longer than either of the two direct routes. According to the travelling time from end to end would be 1 hour 38 minutes, including the change, compared with around 30 minutes from Lime Street to Manchester Piccadilly. However, for passengers who live near to the stations in the middle section of the line it may prove a quicker journey into Liverpool or Manchester.

Via Ditton Junction

A further southerly route, using what was St Helens and Runcorn Gap Railway and Warrington and Stockport Railway, connected Liverpool Lime Street with Manchester Oxford Road via Ditton Junction, Warrington Bank Quay and Timperley. Part of this route is still used for coal and limestone traffic to Fiddlers Ferry Power Station, but east of Warrington it has been abandoned and now forms part of the Trans Pennine Trail. Fiddlers Ferry Power station is to close by 31 March 2020. What will become of the line between Widnes and Warrington is uncertain. Northern Powerhouse Rail have suggested the line be used to access Liverpool from Manchester.

Timings and line speeds

, the fastest journey times are around half an hour, which is little better than over a century earlier. The fastest recorded run was from Manchester Exchange to Liverpool Lime St in 30 minutes 46 seconds by a 1936 built Jubilee 5707 with 7 coaches. An 1882-built compound steam locomotive was timed on the same route in 38 minutes 18 seconds. Until 1968 trains from Liverpool to Manchester by all 3 routes were scheduled to take 40 minutes and often took less. The southern route via Warrington is now restricted to 85 mph and the northern route via Earlestown to 90 mph, with 75 mph over Chat Moss.
Work to four-track the line between Huyton and Roby was completed in October 2017.