Line 2 (Changchun Subway)


Line 2 of the Changchun Subway is a rapid transit line running from west to east Changchun. It started operation on 30 August 2018. This line is 20.5 km long with 18 stations.

Opening timeline

Service routes

Future Development

;Western extension
A western extension to Qiche Park is under construction. The extension is 4.362 km in length. It is scheduled to open in September 2021.
;Eastern extension
An eastern extension to Zhaojiagang East is under construction. The extension is 10.607 km in length.